Skip to main content
All United States tenders

SOLICITATION: Construction of a new Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) building in Leeville, LA (LEV)

6973GH FRANCHISE ACQUISITION SVCS

UPDATE 5 5/22/2026 Answers to all questions are attached in new RFI document and the road As-Builts are attached. New Attachments: 10 LEV VORTAC - Pre-Proposal RFIs 11 LEV VOR Road As-builts 6_17-25 All terms and conditions remain unchanged. --------------------------------------------------------------------------------------------------------- UPDATE 4 5/14/2026 SIR EXTENDED TO 6/30/26 This SAM.gov post is updated to amend the SIR as follows: FIRST: The SIR is extended to 6/30/2026. SECOND: The following clauses are added and replace any previous clauses incorporated by the same number: 3.6.1-4 Small Business Subcontracting Plan (INTERIM April 2026) 3.10.1-15 Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026) THIRD: The following attachments are added to the SIR: 7 SF-24_BidBond 8 SF-25_PerformanceBond 9 SF-25A_PaymentBond Please utilize these documents for all bonding requirements. FOURTH: Amendment document 6973GH-26-R-00088_Amd 0002.pdf is attached to this SAM.gov post. FIFTH: All other terms and conditions remain unchanged. At this time, answers to all questions are still being reviewed. This post will be updated with answers once the review is complete. ------------------------------------------------------------------------------------------------------ UPDATE 3 4/27/2026 This SAM.gov post is updated to amend the SIR as follows: FIRST: The following clause is added: 3.6.2-50 Addressing DEI Discrimination by Federal Contractors (Executive Order 14398) (INTERIM April 2026) SECOND: The following attachments are added to the SIR: Offeror Organizational Experience Form.pdf LEV VORTAC Geotechnical Report - Final 2.6.2025.pdf THIRD: The amended SIR document 6973GH-26-R-00088_Amd 0001.pdf is attached to this SAM.gov post. FOURTH: All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------- UPDATE 2 04/23/2026 The Geotechnical Report for t

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity