RFT - Main Roofing Contractor for Roofing Project at Chapel Downs School
Board of Trustees - Approve by BoT - ie. School Principal
School Roofing Project located in Flat Bush Auckland Construction between 5th Jan 2027 and 29th Jan 2027 This procurement aims to replace identified portions of the school roofing derived from a recent Condition Assessment and BOT/Ministry agreed 5YA plan, multiple partial roof areas were identified as being in need of replacement and therefore requiring removal & disposal of existing roofing material. Other areas of gutter replacement also required.
Roofing Contractor for the Blocks A, D, D1, D2, E, G, H, K, L, V, X, CW: Roof Works & Gym Ceiling & Lighting at Aorere College
Board of Trustees - Approve by BoT - ie. School Principal
The Aorere College Board is seeking a roofing contractor for the Blocks A, D, D1, D2, E, G, H, K, L, V, X, CW: Roof Works & Gym Ceiling & Lighting project.
TKKM o Te Ara Hou Cyclical Maintenance External Painting Project
Board of Trustees - Approve by BoT - ie. School Principal
Blocks A, B, C, D, E, F, G, H, I, J, M, N, U, toilet building and Waharoa - preparation for and painting of all paintable external surfaces throughout the Kura
RFT for Main Contractor for New Carpark Project at Moerewa School
Board of Trustees - Approve by BoT - ie. School Principal
The project will provide additional parking for staff, whānau, and visitors, addressing the school's current shortage of available parking spaces. Stage 2 of the project includes the completion of associated fencing and landscaping works to support the new car park and enhance the overall functionality and appearance of the area.
Dargaville High School – Shade Structure Installation
Board of Trustees - Approve by BoT - ie. School Principal
The work required is the turn-key design and build of a standalone, open-ended tensile membrane canopy over the existing asphalt multi-sport courts at Dargaville High School. The Contract Works include: - Structural engineering, 3D modelling, and working and shop drawings - Building consent, including all documentation and producer statements (PS1, PS3 and PS4) needed for the Code Compliance Certificate - A NZ-fabricated, hot-dip galvanised steel frame with a minimum 50-year design life, compliant with the NZ Building Code, AS/NZS 5131 and AC1828 - A PVC tensile membrane (SKY W9400 or equivalent) with a maximum of 13% light transmission, low glare and a minimum 25-year pro rata warranty - Bored pier foundations, independent of existing buildings. The indicative concept uses about 14 piers, each 900mm in diameter and 3.0 to 3.5m deep - Concrete and asphalt cutting, spoil disposal, and reinstating the court surface around each post - Rainwater collection connected to the existing stormwater system - Any geotechnical investigation needed, and locating underground services - As-built drawings, operation and maintenance manuals, and warranties at handover The works are on an operating school site. They will be delivered in a single stage with one handover at Practical Completion.
(1917) Te Wharekura o Rākaumangamanga #262010 Block P: Gym Refurbishment
Board of Trustees - Approve by BoT - ie. School Principal
Main Contractor for Heating Upgrades at Kohia Terrace School
Board of Trustees - Approve by BoT - ie. School Principal
The school is tendering contract works including the supply and installation of heating/cooling pumps . The school is looking for a single contractor to manage and deliver the contract works. Works are to be undertaken across the 2026-27 school summer holidays
Main Contractor for Autex and Carpet Replacement at Point England School
Board of Trustees - Approve by BoT - ie. School Principal
Point England School is seeking registrations of interest to upgrade wall and floor coverings.
Plumbing & Drainage Contractor for plumbing upgrades at Makoura College
Board of Trustees - Approve by BoT - ie. School Principal
The Makoura College Board of Trustees seek the services of a Plumbing & Drainage Contractor to undertake drainage and water services upgrades across multiple school blocks. The works include replacement and repair of gully traps and roof water drainage components, replacement of drinking fountains, hot water systems and water boilers, adjustment of tempered water settings, associated pipework and fittings, testing and commissioning, excavation and reinstatement works, and all required building make-good works.
RFT - Main Building Contractor for the New Food Technology Room at Waiuku College
Board of Trustees - Approve by BoT - ie. School Principal
Main Contractor for A: Classroom Refurbishments
Board of Trustees - Approve by BoT - ie. School Principal
Waihi College are wanting to refurbish A Block both internally and externally due to the aged and deteriorating components.
Electrical DBs, RCD and RCBO Protection works to various blocks Hillcrest High School
Board of Trustees - Approve by BoT - ie. School Principal
The project is more ideally suited to an experience Electrical Contracting Company with sufficient resources, qualified staff and capacity to undertake the systematic upgrading to multiple Electrical distribution boards across the school campus. Works is to upgrade multiple Electrical distribution boards by way of varying degrees of replacement DB's, installation of RCD/ RCBO as applicable.
ROI - Main Contractor for Kaipara College - A: Toilet Refurbishment
Board of Trustees - Approve by BoT - ie. School Principal
The scope of works includes the complete life-cycle replacement of four WCs, two urinals, five basins, two showers, all tapware, cubicle partitions, wall linings, and flooring. This will involve the supply and installation of all new fixtures, fittings, hot water supply and associated plumbing. The two existing showers, which contain asbestos in their linings, will be removed, and these areas will be converted into additional WCs to accommodate Music and Drama students as the students currently use toilets that are shared with visitors. The addition conversion of the showers into new WCs will require Building Consent, this will trigger a requirement to upgrade the fire protection systems in the Block.
ROI - Main Building Contractor for Kaukapakapa School - K: Roof, Cladding, 2x Toilet & Shower Replacement + Structural Modifications as Required
Board of Trustees - Approve by BoT - ie. School Principal
This project includes the replacement of the roof and cladding, as well as two toilets and two showers within the changing shed, together with any required structural modifications.
Main Contractor for J M, H, W: Lifecycle Replacement of Floor and Wall Coverings at Tangaroa College
Board of Trustees - Approve by BoT - ie. School Principal
Main Contractor forA, C, D, E, G, G2, H, L, O, P, 1, 2, 4, 5, 6: Roof, Clearlite, Gutter, Membrane Roof & Gutter + Roof Parts Replacements at Tangaroa College
Board of Trustees - Approve by BoT - ie. School Principal
Dargaville High School – Site Drainage Remediation
Board of Trustees - Approve by BoT - ie. School Principal
The Contract Works required are: Remediation of the stormwater and wastewater drainage networks at Dargaville High School, 57 Plunket Street, Dargaville, in line with the Remedial Schedules (SW and WW). The works cover 30 stormwater lines and 14 wastewater lines, ranging from 80mm to 450mm in diameter, in earthenware, PVC, concrete, asbestos cement and relined pipe. The works include: - removal of the illegal connection by redirecting the caretaker's shed toilet and basin (WWHOL14_JCT6) from the stormwater system to the closest wastewater asset via a pumped connection (design, supply, installation, power supply and commissioning) - full and part pipeline replacements - pipe relining and spot repairs - root cutting, heavy cleaning and debris removal - exposing and raising buried manholes, and repairing manhole channels and benching - replacing missing inspection caps - exposing JCT3, installing a new mini chamber and completing CCTV of the line downstream to WWMH8 - post-works CCTV of every line worked on - reinstating all disturbed surfaces (asphalt, concrete, paving, grass and gardens) to match existing - handing over final as-built drawings, drainlayer records of work, commissioning records and warranties The Contractor is responsible for the design of the pumped connection, the SWMH21_SWMH22 re-route and any works arising from the Provisional Sums. This includes obtaining any building consent, producer statements and Code Compliance Certificate needed. Provisional Sums cover pipelines without a full condition assessment and further works found by re-CCTV inspection. They are to be spent only on the Engineer's instruction. The works are on an occupied, operating school site and will be delivered as a single stage, with one handover at Practical Completion.
Main Contractor for Thorndon School (Wellington) A, B & C: Combined AMS 5YA Covered Outdoor Learning Area (COLA)
Board of Trustees - Approve by BoT - ie. School Principal
The project comprises the construction of a new permanent Covered Outdoor Learning Area (COLA) at Thorndon School, with a suitably experienced main contractor sought to deliver the complete works in accordance with the architectural, structural and associated tender documentation. The works include the engineered timber structure, translucent roofing, associated rainwater goods and drainage connections, hard and soft landscaping, reinstatement and all ancillary works necessary to provide a complete solution. The preferred outcome is a durable, compliant and fit-for-purpose covered outdoor learning space that maximises the use of the school's constrained inner-city site and provides a safe, weather-protected area for teaching, gathering and general school use throughout the year. Contractors are expected to demonstrate a robust methodology, appropriate resourcing and a practical programme that manages cost, quality and programme risk while delivering the works in accordance with the architectural and engineered design. The structural design incorporates engineered glulam beams, columns and purlins together with specifically detailed connections. Given the scale of the works, the project is likely to extend into school term time, making programme management and health and safety crucial considerations. The contractor will need to maintain safe separation between construction activities and students, staff and visitors, while carefully managing access, deliveries, noise, dust and disruption to normal school operations. The preferred programme currently anticipates commencement in December 2026 and completion by April 2027, although alternative programmes may be considered. Subject to the level of tender responses received and available budget, the project may also be split into two phases, with staging and sequencing therefore forming an important part of the contractor's proposed approach.
Main Contractor for Blocks 1,2,5,6,7,8,9,11&C: Heating & Electrical Works at Elm Park School
Board of Trustees - Approve by BoT - ie. School Principal
The project forms part of the School’s planned lifecycle renewal programme to address ageing electrical and heating assets across the school site. replacement is required to maintain safe, reliable and efficient building services. The works will be undertaken across Blocks 1, 2, 5, 6, 7, 8, 9, 11 and C, with the programme coordinated to minimise disruption to school operations. Works will be scheduled during the December 2026/January 2027 school term break, with the objective of completing the required works and handing the affected areas back to the School prior to the commencement of the 2027 school year.
Main Contractor for Block 5,6,8&C Roofing Works at Elm Park School
Board of Trustees - Approve by BoT - ie. School Principal
The project involves the planned lifecycle renewal of ageing and end-of-life roofing systems across Blocks 5, 6, 8 and C at Elm Park School. The project outcome is to provide durable, weather-tight roofing systems and associated components, reducing the risk of water ingress and deterioration while maintaining the ongoing functionality and serviceability of the school buildings
Marlborough School – Toilet block upgrades & miscellaneous works – Renovation Project
Board of Trustees - Approve by BoT - ie. School Principal
The School is planning to undertake these works. The Project background is as follows and outlined in the ROI document; Site Visits are NOT permitted during this ROI stage.
Main Fencing/Building Contractor for LSM Fencing & Gates at Carlton School, Whanganui
Board of Trustees - Approve by BoT - ie. School Principal
The Board of Trustees for Carlton School, are seeking a suitably qualified Main Fencing/Building Contractor to carry out the LSM Bathroom Modifications Works. The Contract Works required are: The proposal is to install new 1.8m high aluminium and timber fencing and gates to the school boundary and carpark areas to address identified health and safety concerns. Fencing will be designed without footholds or horizontal bars and extend to ground level. Gates will include safety latches, drop bolts, self-closing mechanisms and appropriate signage. Contractors MUST visit site for tender to be compliant. Contact School Office to arrange a site visit. Refer to invite letter attached. Ideally dependent on MoE funding approval this work would start as soon as possible after confirmation provided, however this will be discussed with the successful contractor and school once funding approvals are confirmed. TERMS AND CONDITIONS: https://education.govt.nz/assets/Documents/Primary-Secondary/Property/Procurement-templates-guides/School-Property-Procurement-RFx-Process-Terms-Conditions-Conditions-of-Tendering-2017-2.pdf
Registration of Interest - Main Contractor for Block 1 & 2 Window Replacement at Somerfield School
Board of Trustees - Approve by BoT - ie. School Principal
The school wish to complete window replacements to Blocks 1 & 2. Blocks 1 & 2 both have original window units that have reached the end of their serviceable life cycle. Units are difficult to open and maintain and are drafty with single glazing and some louvre openings.
RFT - Main Contractor for F Block Recladding at South Westland Area School, South Westland
Board of Trustees - Approve by BoT - ie. School Principal
Kia ora Re: Request for Tender (RFT): Main Contractor for F Block Recladding at South Westland Area School, South Westland On behalf of South Westland Area School, Onus Projects invites main contractors to submit tenders for the recladding of South Westland Area Schools F Block building. Key Dates: RFT submissions close: Thursday 5th November 2026 Intended contract award (indicative): 16 November 2026 Please submit your RFT via GETS direct, and arrange any site visits using the details below: Contact Person: Carl Fisher – Onus Projects Ltd Email: carl@onusprojects.nz Phone: 027 305 7684 Note: Project location: 73 Wanganui Flat Road, Harihari 7884 (West Coast Region) Any future engagement will be through a Medium Works Contract; no contract-specific tags will be accepted Works can commence as early as 16 December 2026, subject to contract signing, material availability, and contractor availability Site visits are strictly by appointment only Please refer to the additional tender documents for further information. Regards, Carl Fisher Onus Projects Limited