Skip to main content

CPV 4524

Water-project construction

35 active tenders tagged under this CPV division — sort, filter, and drill in via the master tenders page.

Croatiaworks

STARI EOJN - UGOVOR O GRAĐENJU - IZVOĐENJE RADOVA RESTAURACIJE STARE DRAVE NA PODRUČJU ALJMAŠKOG RITA - BJELOBRDSKA BARA

Hrvatske vode, pravna osoba za upravljanje vodama, Grad Zagreb

Estimated value€2.2m
92129
Croatiaworks
closing in 3 weeks

Izgradnja hidrostanice Brdašce Ledenice

VIO ŽRNOVNICA CRIKVENICA VINODOL d. o. o., Novi Vinodolski

Estimated value€120,000
92011
Croatiaworks
closing in 12 days

Rekonstrukcija luke, obalnog puta, kupališta i parka u naselju Njivice – faza B2

OPĆINA OMIŠALJ, Omišalj

Estimated value€420,000
92025
Croatiaworks
closing in 5 days

Održavanje pomorskog dobra

OPĆINA LOPAR, Lopar

Estimated value€245,000
92038
Croatiaworks

STARI EOJN - Izvođenje radova uređenja korita rijeke Vuke (rkm 0+400 - 1+400; spojni kanal s propustom; rkm 1+931; spojni kanal s propustom rkm 3+027; obalni pojass na l.o.o rkm 2+885 - 3+420

Hrvatske vode, pravna osoba za upravljanje vodama, Grad Zagreb

Estimated value€3.2m
91902
Albaniaworks

Riparimi i demeve ne objektin : “ Mbrojtja nga perroi i Selos faza I dhe ne segmentin rrugore Likomil-Selo-Klishar

Bashkia Dropull

Estimated valueALL 4.7m
REF-94196-07-22-2026
Bosnia & Herzegovina

Čišćenje zaraslih površina dovodnog kanala i GKB-a – CHE Čapljina

JP ELEKTROPRIVREDA HRVATSKE ZAJEDNICE HERCEG BOSNE D.D. MOSTAR

Estimated valueNot disclosed
799-1-3-793-3-557/26
United Kingdomworks
closing in 7 days

HBC - Aberford Park Brook Improvement

Hertsmere Borough Council

Hertsmere Borough Council ("the Council") seeks quotations from suitably experienced and competent contractors to undertake the design, permitting and implementation of brook and lake improvement works within Aberford Park, Borehamwood, Hertfordshire. The watercourse within Aberford Park forms part of Tykes Water and receives surface water runoff from surrounding roads and residential areas. At the head of the brook is an oil interceptor, originally installed to prevent pollution from Borehamwood's historic industrial activities. The interceptor has since been decommissioned by the Environment Agency as surrounding land uses have changed and are now predominantly residential, office and light industrial. Surface water currently bypasses the interceptor and discharges directly into the lake. Major restoration works were undertaken in 1999 and 2008, including desilting, reprofiling, fountain installation and refurbishment, and planting works. The Council understands that sediments removed during these works were retained and beneficially reused within the site. Approximately eighteen years have elapsed since the last major intervention. The Council has identified a number of issues requiring remediation: • Increased silt accumulation resulting in reduced lake depth; • Malfunctioning fountains due to sediment accumulation; • Algal blooms and associated odours during summer months; • Excessive reed growth resulting from low flows and seasonal water level variations.

Estimated valueNot disclosed
069739-2026
United Kingdomworks

Market engagement event Irrigation Maintenance at Regents and Richmond and other Royal Parks

The Royal Parks Ltd

We are looking to the market to inform us about recommended best practice for Sports pitches and other irrigation systems. We will host this online team event at 14.00 for one-hour 24 July 2026 We intend to tender for the maintenance of our exiting system in Regents Park for annual maintenance and ad hoc maintenance for other sites at a later date. This is not a call to competition. Please note There is no intention for replacing the systems we currently use. We are interested in inspections and repair. However, are we would be interest in finding out more from suppliers about the following. Recommended best practice for sports pitches. •Irrigation controls •Moisture sensors •Sprinkler Performance •Uniformity of water Distribution Monitoring systems performance for •Water consumption (m3) •Irrigation run times. •Turf health and playing quality. •Maintenance costs We will be holding a team’s event and if you are interest, please respond and provide an email address. We are also interested in knowing your companies approach to the following. Please send the attached spreadsheet back •Water reduction use •Improved turf health and recovers •Consistency of playing surface •Reduced disease pressure from overwatering. •Lower operating and maintenance costs.

Estimated valueNot disclosed
069515-2026
Bosnia & Herzegovina

Izvođenje radova na odvodnji oborinskih voda MZ Dolac - I faza

OPĆINA TRAVNIK

Estimated valueNot disclosed
54-1-3-96-3-78/26
Bosnia & Herzegovina

Izrada regulacije korita rijeke Neretvice – II faza

GRAD KONJIC

Estimated valueNot disclosed
637-1-3-62-3-90/26
Albaniaworks

Ndërtim ujësjellesa dhe nënobjekte të furnizimit me ujë dhe përmirësim rrjetesh ekzistuese në Rajonin Korçë.

Shoqëria Rajonale Ujësjellës Kanalizime Korçë SH.A

Punime ndërtimi për ujësjellës

Estimated valueALL 108.3m
REF-93644-07-16-2026
Albaniaworks

Ndërtim rrjeti shpërndarës ujësjellësi për fshatin Tragjas dhe rehabilitim dhe vënie në funksion të KUZ, fshati Tragjas

Shoqeria Rajonale Ujesjelles Kanalizime Vlore Sh.A

Punime ndërtimi për ujësjellës

Estimated valueALL 159.6m
REF-93729-07-16-2026
Croatiaworks

Radovi ravnanja i dohrane plaža

GRAD PULA - POLA, Pula - Pola

Estimated value€40,000
84952
Albaniaworks

Ndertim i kanaleve per sistemin e vaditjes dhe ujitjes per zonen Pustec-Lajthize dhe rikonstruksioni i diges se rezervuarit Lajthize 1,2,3

Bashkia Pustec

Estimated valueALL 72.3m
REF-93191-07-13-2026
Croatiaworks

Uređenje obalnog pojasa naselja Ugrinić, 2. cjelina

OPĆINA TKON, Tkon

Estimated value€350,000
90297
Croatiaworks

STARI EOJN - Izvođenje radova na izgradnji nasipa Kupe, obaloutvrde i zaštitnog zida na lijevoj obali Kupe od naselja Selce do Rečice -1., 2. i 3. etapa

Hrvatske vode, pravna osoba za upravljanje vodama, Grad Zagreb

Estimated value€16.6m
87189
Albaniaworks

Rikonstruksion i kanalit të Lingajcës,faza IV,Bashkia Prrenjas

Bashkia Prrenjas

Punime ndërtimi për kanale ujitëse

Estimated valueALL 69.3m
REF-92676-07-07-2026
Croatiaworks
closing in 7 days

Rekonstrukcija u gabaritima luka Krilo Jesenice

Lučka uprava Splitsko-dalmatinske županije, Split

Estimated value€29.3m
89923
Bosnia & Herzegovina

Uređenje šetališta i Trga Bulevar Branilaca Dobrinje sa pratećom saobraćajnicom i parking prostorom – III faza šetnice

OPĆINA NOVI GRAD SARAJEVO

Estimated valueNot disclosed
422-1-3-157-3-227/26
Bosnia & Herzegovina

Čišćenje dijela vodotoka k.č. 1270/1 Gradina, most Semanići – Stari mlin MZ Slatina

JAVNA USTANOVA KOMUNALNO STAMBENI FOND

Estimated valueNot disclosed
1018-1-3-75-3-89/26
Bosnia & Herzegovina

Čišćenje dijela vodotoka Gračanice: Most Kovačevići-Begove Kafane MZ Ćoralići

JAVNA USTANOVA KOMUNALNO STAMBENI FOND

Estimated valueNot disclosed
1018-1-3-76-3-90/26
Bosnia & Herzegovina

Čišćenje dijela vodotoka potoka Koprivska rijeka most Malići-Kašaba MZ Stijena

JAVNA USTANOVA KOMUNALNO STAMBENI FOND

Estimated valueNot disclosed
1018-1-3-77-3-91/26
Bosnia & Herzegovina

Čišćenje dijela vodotoka potoka Koprivska Rijeka u naselju Suljići, Suljići vikendica-Palčik MZ Donja Koprivna

JAVNA USTANOVA KOMUNALNO STAMBENI FOND

Estimated valueNot disclosed
1018-1-3-78-3-92/26