UDCGP-GCC-D-4 RCC Drains from Dhaka-Mymensingh road Chandana Chowrasta to Turag River.
Office of the Chief Engineer, Gazipur City Corporation
Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
GCC/Z-02-05/25-26/03 Estimate of A). RCC Drain work From Chander ati Road to Asad Pre-Cadet School.B. RCC Pipe Drain And Earthen Road work from Nozrul Member Pond to Chily Canal via Sapmara Road.
zone-02, Gazipur city corporation
GCC/Z-02/05/25-26/01 Construction of Repairing A). BC work from Bindan Ulukhola Road to Bindan Balu Nodi Ghat Via Bindan Madrasah & Mazar And Nondibari Mamun house Road. B). Khilgaon-Kaligonj Road to Nagda Bridge Dhaka-By-Pass via Narayonkul.
zone-02, Gazipur city corporation
GCC-Zone-08-RD-13 (1) Widening & Improvement of the Road from Kashimpur Zitar mor to Zirani Bazar by BC/RCC (2) Construction of RCC Drain & Footpath from Kashimpur Zitar mor to Zirani Bazar.
Widening of main connecting road in various zone including construction drain & footpath at Gazipur city corporation. (1st Revision)
GCC-Zone-08-RD-12 (1) Widening & Improvement of the Road started from Kashimpur BADC mor to Sreepur bus stand by BC/RCC (2) Construction of RCC Drain and Footpath Started from Kashimpur BADC mor to Sreepur bus stand.
Widening of main connecting road in various zone including construction drain & footpath at Gazipur city corporation. (1st Revision)
LGED/GOBM/Jash/26-27/RW-01 Rehabilitation (Widening) of Chanchra RHD - Rojgonj GC (Monirampur) Road from Ch.00m-4000m Road ID-241472011 [Sadar] (Road Re-hab/Widening)
Office of the Executive Engineer, LGED, Jashore