Construction of Boundary Wall, Electric Work, Platform Construction and Pump Lifting etc for RPWSS under Safe Water Supply Throughout the Country Project. (Additional Works of Existing Rural Water Scheme)
Office of the Executive Engineer DPHE, Sunamganj
PSWSC-6239 Construction of Boundary Wall, Electric Work, Platform Construction and Pump Lifting etc for RPWSS under Safe Water Supply Throughout the Country Project. (Additional Works of Existing Rural Water Scheme) Collected and purified water; Construction work;Natural water;Drinking water;Non-drinking water;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Extension of Boundary Wall Work at Narsingdi 132/33kV Grid Sub-Station under GMD Narsingdi, Power Grid.
Grid Maintenance Division, Narsingdi
River training, Sheet Piling and other ancillary civil works for Slipway
Establishment of Logistics & Fleet Maintenance Facilities for BCG
Package No. 22: Construction of a social event center with electrical sub-station, generator, solar panel, lift, air condition, external water supply, boundary wall, gate, approach road, site improvement, gas connection, false ceiling, wall paneling, external electrical work, arboriculture etc. in W
Office of the Project Director(CCC-DSCC)
Thorough Repairs to Electric Metering Room including Boundary Wall at Ishwardi with other ancillary works under the Jurisdiction of SAEN/PXC.
Office of the Divisional Engineer-2, Paksey
Procurement of chemicals for chemical resistant coating and related works at collection channel and inside wall of clarifiers A.
Padma Water Treatment Plant