Re-excavation of 4 (Four) Nos khal (1).Boroivita Khal from km 0.000 to km 6.700 = 6.700 km,(2).Gogra Hati Khal from km 0.000 to km 4.024 = 4.024 km, (3)Chowdhury Bazar-Sonatia Khal from km 0.000 to km 2.202 = 2.202 km, (4)Dumuria Khal from km 0.000 to km 4.800 = 4.800 km,Total=17.726 Km in c/w ''Imp
Gopalganj WD Division
SB-KEX-16 Re-excavation of 4 (Four) Nos khal (1).Boroivita Khal from km 0.000 to km 6.700 = 6.700 km,(2).Gogra Hati Khal from km 0.000 to km 4.024 = 4.024 km, (3)Chowdhury Bazar-Sonatia Khal from km 0.000 to km 2.202 = 2.202 km, (4)Dumuria Khal from km 0.000 to km 4.800 = 4.800 km,Total=17.726 Km in c/w ''Implemention of Integrated water Resources Management Project for Improvement of Drainage Congestion in Tungipara & Kotalipara Upazila Under Gopalganj District'' under Gopalganj WD Division, BWDB, Gopalganj during the year 2026-27.(Package No : SB-KEX-16). Construction work for water projects; Works for complete or part construction and civil engineering work;
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
TP-KEX-10 Re-excavation of 25 nos khals - Hiron branch khal 0.678 km, Hiron middle para khal 0.714 km, Dafadar bari haloter khal 1.000 km, Boroi hati khal 0.600 km, Rakhila bari khal 1.768 km, Gazir khal 2.325 km, Silna-shir khal 1.570 km, Gabir beel khal 2.170 km, Khanar par khal 2.355 km, Ebadat k
Sub-Project Management Office (Specialized Division), CRISP-WRM, BWDB
BSTRONG-LGED-CHA/RD-1 Rehabilitation of 10.290 km Emergency Evacuation Rural Roads including 9.00m Box Culvert at Sandwip upazila under Chattogram District. Rehabilitation of 1. Sandwip Upazila Sontospur up to Companigong Ghat (Noakhali) Road via Dirgapar UP & Urir Char UP (Sandwip Char Elahi Connec
Office of the Executive Engineer, LGED, Chattogram
Re-Sectioning of both dyke of the S-10G Irrigation Canal (from KM. 0.000 to KM. 8.600 = 8.600 KM) in c/w "Emergency Maintenance and Rehabilitation of Ganges Kobadak Irrigation Project" under Chuadanga WD Division, BWDB, Chuadanga during the FY 2026-27.
Chuadanga WD Division
CIDP/Sadar/2025-26/Wid.W-01 Part-A: Improvement of Monagram - Bowarabazar Road at Ch: 00-3350m (Road ID: 419674008) (Salvage Cost Tk.10,889/-), (i) Earth Work (3081.816cum), (ii) Road Widening (3350m), (iii) Protective Work 262m, (iv) Structure Work (1.00mx1.00m Box Culvert at Ch. 212m) , (v) Road S
Office of the Executive Engineer, LGED, Cumilla
CIDP/Barura/2025-26/W-18 Part-A: Improvement of Hossainpur-Lakshmipur Road at Ch: 00-800m (Road ID: 419095139) , (i) Earth Work (244.11cum), (ii) Road Work (800m), (iii) Construction of 0.90x0.90m Cross Drain at Ch: 343m, 385m & 731m on the same road, (iv) Construction of 33m Protective Work on the
Office of the Executive Engineer, LGED, Cumilla
Free tender alerts
Get a weekly digest of Bangladesh tenders
New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.