In SSAE/Works/RJHI's Section:- Through Repairs to Road Surface of Man & UN-Manned Level Crossing gate No. Î?/5 (K.M. 228/2-3), Î?/11 (K.M. 239/0-1), Τ/13 (K.M. 241/9-242/0), E/14 (K.M. 243/4-5), E/15 (K.M. 243/8-9), Î?/17 (K.M. 245/6-8), Î?/18 (K.M. 247/7-8), Î?/19 (K.M. 248/4-5), E/21 (K.M. 250/5-
Office of the Chief Engineer (West), Rajshahi
W/1/DEN/2/PXC/2026-27/WR-2 In SSAE/Works/RJHI's Section:- Through Repairs to Road Surface of Man & UN-Manned Level Crossing gate No. Î?/5 (K.M. 228/2-3), Î?/11 (K.M. 239/0-1), Τ/13 (K.M. 241/9-242/0), E/14 (K.M. 243/4-5), E/15 (K.M. 243/8-9), Î?/17 (K.M. 245/6-8), Î?/18 (K.M. 247/7-8), Î?/19 (K.M. 248/4-5), E/21 (K.M. 250/5-6), Τ/25 (K.M. 254/9-255/1), E/26 (K.M. 258/1-2), E/27 (K.M. 259/3-4), E/27 (A) (K.M. 260/2-3), E/29 (K.M. 262/2-3), E/39 (K.M. 267/9-268/0), T/45 (K.M. 273/8-9), T/49 (K.M. 284/8-9), E/45 (K.M. 277/1-2), E/5 (310/1-2) Total = 19 Nos. with other ancillary works under the Juridection of SAEN/RJHI. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
In SSAE/Works/ISD & SJYB Section:Through repairs to Road Surface at authorised level crossing gate no:E/1(A), E/4, E/6, T/7, T/8, T/17, T/18, E/22, E/24, T/32, T/38, E/41, T/46, T/47, E/50, E/76, E/80 (Total=17( Nos) in betwen Station (ULP-JOI) & E/39, E/40, T/41, E/42, /E/43, E/44, T/46, E/47 (Tota
Office of the Chief Engineer (West), Rajshahi
In SSAE/Works/STU's Section :- Through Repairs to Road Surface at Level Crossing gate no. T/48, E/49, T/51, T/56, T/57, E/58, T/60, E/60 (A), E/60 (B), T/60(D), E/61 (A) & E/65(A) (Total = 12 nos) in between Malanchi-Santahar at Santahar Section & Supplying fitting , fixing & erecting all requisite
Office of the Chief Engineer (West), Rajshahi
In SSAE/Works/CO's section: - Widening of level crossing gate No. E/28 (SPL) at Km. 177/8-178/0 in between station Mirpur-Poradah including through sleeper renewal by BG PSC special sleeper in place of wooden & steel sleeper including road approach alarm shifting, reconstruction of road surface, sup
Office of the Chief Engineer (West), Rajshahi
Procuring of Asphalt Materials for Routine Maintenance Work at Different Roads of Section-2 under Rajbari Road Division, During the FY-2026-2027.
Rajbari Road Division
Providing Skilled & Semi Skilled Labour for Exicuting Road repairing Branch Triming, Clearing & Grabbing of Roadway Embeankment at September-2026 Under Road-Sub Division-1, Section-I Under Road division, Faridpur During the Financial year 2026-2027.
Faridpur Road Division
Free tender alerts
Get a weekly digest of Bangladesh tenders
New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.