Skip to main content
All Bangladesh tenders
BangladeshworksOTM

Re-excavation of Pond 24,800 Cum with Construction of 4 Nos. RCC Stair in Patnitala Upazila, Naogaon.

Shataphool Bangladesh - SB-ECCCP-Drought

SB/ECCCP-Drought/Pond/WD-303.3 Re-excavation of Pond 24,800 Cum with Construction of 4 Nos. RCC Stair in Patnitala Upazila, Naogaon. Engineering works and construction works; Works for complete or part construction and civil engineering work; Construction work for water projects;

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Bangladeshsupplies
closing in 2 weeks

The Procurement of Toner and other 37 kinds.

Provision Branch

Estimated valueNot disclosed
1352087
Bangladeshworks
closing in 2 weeks

Re-excavation of existing Canal including site preparation, earthwork excavation, removal/stacking of excavated earth, dressing and shaping of canal bed and slopes, formation and compaction of embankments, construction of earthen dam and other associated works as per approved drawings, BOQ and techn

MOUSUMI Project Office

Estimated valueNot disclosed
1346982
Bangladeshworks
closing in 2 weeks

Re-excavation of existing Canal including site preparation, earthwork excavation, removal/stacking of excavated earth, dressing and shaping of canal bed and slopes, formation and compaction of embankments, construction of earthen dam and other associated works as per approved drawings, BOQ and techn

MOUSUMI Project Office

Estimated valueNot disclosed
1346983
Bangladeshworks
closing in 4 weeks

Re-construction of Durga Gotti Bridge of 22.68 (1X21.34)m Long R.C.C Girder Bridge at 15th km(p) (Ch: 14+933) of Faridpur (Badarpur)-Saltha-Sonapur-Muksudpur Road (Z-7004) under PMP (Major-Bridge) of Faridpur Road Division during the year 2026-2027.

Faridpur Road Division

Estimated valueNot disclosed
1349580
Bangladeshworks
closing in 4 weeks

Re-construction of Baliyahati Bridge of 97.330 m(1x18.30m+1x45.32m+1x30.488m) Long P.C Girder Bridge at 54th km (Ch.53km+897m) on Goalanda- Faridpur- Tarail (Z-7108) Road, under PMP (Major-Bridge) of Road Division Faridpur During the FY 2026-2027.

Faridpur Road Division

Estimated valueNot disclosed
1349579

Free tender alerts

Get a weekly digest of Bangladesh tenders

New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.