Construction of link road at Ch. 0+078 Km of Bogura Town (Nurani mor to Charmatha) Road (R-541) under Road Division, Bogura during the year 2026-2027.
Bogra Road Division
e-GP-32/EE/BRD/OTM/2026-2027 Construction of link road at Ch. 0+078 Km of Bogura Town (Nurani mor to Charmatha) Road (R-541) under Road Division, Bogura during the year 2026-2027. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Appointment of a Professional Consulting Firm to Conduct a Performance Audit of BTV: A 360-Degree Assessment for Institutional Revitalization, Cost- Effectiveness, Quality Improvement and Audience- Centric Transformation
Office of the Director General
Construction of 17.750 m (11.00+6.0 m) Long RCC Slab Bridge (Koiyarbill Bridge) at 18th Km. (Ch: 17+152m) on Yangcha-Manikpur-Shantibazar (Z-1126) Zilla Highway under Cox's Bazar Road Division during the year 2026-2027.
Cox's Bazar Road Division
Construction of 28.78 (1x27.44) meter Long PC Girder Bridge at 3rd Km. (Ch 02+737) (Harbang Khal Bridge) on Baraitali-Magnamaghat (Paharchanda) Zilla Road (Z-1002) Under Cox's Bazar Road Division During the year 2026-2027.
Cox's Bazar Road Division
At SSAE/Way/CGD Section: Complete track renewal by 75 lbs 'A' Rail (S/H) with MG PC Sleeper (New) including supply & installation of P-way fitting & fastening, ballasting, Overhauling of LC gate with other allied works at potenga silo siding (KK loop line) Under DEN-3/Chattogram jurisdictions
Office of the Chief Engineer (East), Chittagong
At SSAE-Way/CGD Section: Through Sleeper renewal with MG PC Sleeper (New) at line no. 07 (Down sorting line) including supply of P-way fitting & fastening, ballasting with other allied works (Total Length of line= 0.572 km) Under DEN-3/Chattogram Jurisdiction.
Office of the Chief Engineer (East), Chittagong
Free tender alerts
Get a weekly digest of Bangladesh tenders
New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.