Construction of RCC U drain at Ch. 189+600 to 189+718m (Fultala) of Doulatdia-Faridpur(Goalchamot)-Magura-Zinaidah-Jeshore-Khulna-Mongla-Digraj (N-7) National Highway under Road Division, Khulna during the year 2026-2027.
Khulna Road Division
17/e-GP/OTM-Drain/KRD/2026-2027 Construction of RCC U drain at Ch. 189+600 to 189+718m (Fultala) of Doulatdia-Faridpur(Goalchamot)-Magura-Zinaidah-Jeshore-Khulna-Mongla-Digraj (N-7) National Highway under Road Division, Khulna during the year 2026-2027. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Construction of RCC U drain at Ch. 4th (Ch.03+303 to 03+450Km) (Gollamri Bazer) of Khulna-Chuknagor-Satkhira National Highway (N-760) under Road Division, Khulna during the year 2026-2027.
Khulna Road Division
CDWSP/CTG/FATI/W-56 Widening & Strengthening of Nanupur UPC to Dowlat Munshir hat Bazar Road (Nanupur-Khiram Road) at Ch. 3390-8200m by BC, With RCC Road Ch. 7690-7790m. RCC Box Culvert 02Nos. 1x0.750mx0.750m, 03Nos 1x1.50mx1.50m, 1No. 1x2.0mx2.0m, 01No. 1x3.00x3.00m, 03Nos. 1x1.50x1.50m under Fatik
Office of the Executive Engineer, LGED, Chattogram
Construction of Rigid Pavement at Ch. 16+895 to 17+044 Km of Madhayapara - Aftabganj-Nawabganj Road (Z-5561) Under Road Division, Dinajpur during the year 2026-2027.
Dinajpur Road Division
Construction of Rigid Pavement at Ch. 00+000 to 00+090 Km of Madhayapara - Badarganj Road (R-557) Under Road Division, Dinajpur during the year 2026-2027.
Dinajpur Road Division
SDIRWSP/SYL/DSUR/UZR/W-41 Widening & Strengthening of Tetli UP (RHD)- Rustompur- Jalalpur GC Road at Ch. 4348m-7520m under Dakshin Surma Upazila, Dist: Sylhet, Road ID No- 691952007 [Salvage Cost : 7,32,704.00]
Office of the Executive Engineer, LGED, Sylhet
Free tender alerts
Get a weekly digest of Bangladesh tenders
New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.