On CD Branch :- Construction of surface R.C.C. drain 332'-0" for water disposal along the Railway track from KM. 12/1-12/3 in between SLHR- JNHT station including KM. 9/2-9/6 the Railway track repairs to cess & bank with others allied works.
Office of the Divisional Engineer-1, Chittagong
DEN-1-CTG/04/2026-27/e-GP. On CD Branch :- Construction of surface R.C.C. drain 332'-0" for water disposal along the Railway track from KM. 12/1-12/3 in between SLHR- JNHT station including KM. 9/2-9/6 the Railway track repairs to cess & bank with others allied works. Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment; Repair, maintenance and installation services;Repair, maintenance and associated services related to aircraft and other equipment;Repair, maintenance and associated services related to railways and other equipment;Repair, maintenance and associated services related to roads and other equipment;Repair, maintenance and associated services related to marine and other equipment
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
On CD Branch:- Re-construction gumti ghar for Level Crossing gate No. E/3 at K.M. 9/2-3 in between station SLHR-JNHT including gate barrier repairs to other ancillary works as per drawing.
Office of the Divisional Engineer-1, Chittagong
Construction of RCC U-Drain work at ch. 04+900 to 05+100 km of Dinajpur-Khanpur(Z-5802) Road, under Road Division, Dinajpur during the year 2026-2027
Dinajpur Road Division
At LKM-CDR Section (Meher station) : Through repairs to Meher station approach road including other allied works.
Office of the Divisional Engineer-1, Chittagong
Construction of RCC Cross Drain work at ch. 1st & 3rd km of Fulbari Bus Stand- Dinajpur Govt. College (R-586) Road, under Road Division, Dinajpur during the year 2026-2027
Dinajpur Road Division
Construction of RCC U-Drain work at ch. 00+00 to 00+100 km of Dinajpur- Birol (Z-5803) Road, under Road Division, Dinajpur during the year 2026-2027
Dinajpur Road Division
Free tender alerts
Get a weekly digest of Bangladesh tenders
New Bangladesh tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.