Heat network techno-economic feasibility study for Didcot
Vale of White Horse District Council
This project will deliver a heat network feasibility study for an area northwest of Didcot. The study will consider the potential combination and/or expansion of potential heat network zones identified by the National Zoning Model (NZM), by incorporating opportunities provided by adjacent data centre development proposals. 400,000sqm of data centres are proposed by several developers on brownfield land adjacent to the operational Didcot Power Station (Oxfordshire). The NZM has not considered these future waste heat sources. The overarching aims of this study are: To review heat network zone development opportunities, to help prepare for the introduction of heat network zoning policy. To determine whether heat network scheme(s) for the specified area are viable. To understand how heat network schemes can be delivered in alignment with the forthcoming Heat Network Zoning Regulations. To set out for the council the range of possible delivery models based on different levels of local authority leadership and investment. To provide decision makers with recommendations which describe the next steps required to take the project through to delivery. Study Objectives & Work Package Summary: The council will commission a techno-economic feasibility study, incorporating elements on heat network zoning, for the development of a low carbon heat network at Didcot. This specification is based on the Heat Networks Delivery Unit Zoning Study and Feasibility Study Specifications from February 2026, with some additions to reflect the local context and circumstances. The outputs should meet the requirements to support a Green Heat Network Fund application. The study objectives are: Identify the potential for heat network zones and/or heat networks in alignment with the Heat Network Zoning Policy, reviewing the currently proposed zones and potential for expansion. Assess the technical and economic feasibility of conceptual heat network projects within the local area. Identify the key he
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Systems Engineering and Whole Plant Integration Partner (SEWPIP)
UK Fusion Energy Ltd
PfH Decarbonisation, Retrofit and Planned Works Framework for Wales
Procurement for Housing
Appointment of Integrated Consultant Team for provision of new build for Longstone School, Dundonald
the Education Authority
Design of Pavilion Building
Benson Parish Council
Asbestos Services Framework
Tai Tarian Ltd