SH39 Mangati Stream Bridge Permanent Structure Replacement
New Zealand Transport Agency
This is a Physical Works contract for the replacement of the Mangati Stream Bridge (BSN 520) located on SH39 approximately 7 km south of Pirongia. The existing bridge was damaged in the February 2026 flooding and a temporary one-lane bridge has been installed adjacent to the location. The Contract Works comprise of: • Construction of the new bridge with a single span superstructure comprising of four fabricated steel I-girders and a precast reinforced concrete bridge deck. • Installations of pilled foundations. The superstructure is to be cast into the abutments. Note that steel pile casing will be procured separately by the Principal and supplied to the contractor. • Installation of a TL-5 rigid bridge HT rail including abutment transitions, semi-rigid to rigid transitions, W-beam sections, and leading-end terminals on the bridge approaches. • Temporary support for services during the works and permanent reinstatement on the new bridge. • Scour protection works/river training and earthworks. • Removal of the existing temporary bridge and associated earthworks, site restoration, and site de-establishment (excluding bridge superstructure – to be removed by Downer) Only tenderers pre-qualified to level “Bridge Construction – Level B (3B)” and “Surfacing – Level C (2C)” under the terms of the Transport Agency’s Prequalification System are eligible to submit a tender. Electronic copies of the Request for Tender documentation are attached to this advertisement. ALL tenderer’s queries are to be SUBMITTED through the GETS Questions and Answers. All responses to tender queries/clarifications will be answered by Notice to Tenderer which will be available in the GETS addenda. Tender submissions shall be uploaded to GETS eTender box in two separate files. The GETS file upload limit is 50MB. The files should be labelled: - File No 1 – 13808 SH39 Mangati Stream Bridge Permanent Structure Replacement - Proposal excluding Price - File No 2 – 13808 SH39 Mangati Stream Bridge Perman
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Contract 25/48 - Blackett Street Stormwater Upgrade - Advertising Notice
Waimakariri District Council
Supply of necessary spare parts and painting for ferry No. UT-I-031/2003 Man Engine 190 K.W. (Schottel) of Which is running at Chandraghona Ferryghat under RHD, Workshop Division, Rangamati during the year 2025-2026.
Workshop Division, Rangamati
Whanganui Port, Site 3 Stormwater Reticulation.
Whanganui Port
14247 - Ashhurst Domain to Western Gateway Shared Use Path
New Zealand Transport Agency
Hatea Walkway Swing Bridge Renewal - Design and Construct
Whangarei District Council