Ilam Campus Boiler Resilience
People, Culture & Campus
This ROI is the first step in a multi-step procurement process. Following evaluation shortlisted Respondent/s will be invited to submit a full proposal in response to a Request for Proposals (RFP). This document deals only with the first step i.e. the ROI process. This Registration of Interest is for the supply of sufficient plant, labour and materials necessary for the construction and installation of physical boiler resilience works on an active and busy University Campus. The main requirement is the ability for UC to arrange delivery of temporary portable boilers to connect into the existing heating infrastructure as and when required. The contractor will be able to utilise a range of installation methodologies to best suit stakeholder requirements to install the foundation and infrastructure connections to complete the boiler resilience project using a NZS3910:2013 contract. It is important to note that the final design is currently being developed and as such outputs and deliverables are subject to change.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Procurement of Hardware for the Teleradiology PACS/RIS Infrastructure for the Cl
UNDP
conduct a Feasibility Study for the Volcanoes Community Resilience Project
UNDP
Mission Command Training Facility at Linton Military Camp
Defence Estate and Infrastructure
Interview Preparation Platform
University of Waterloo
The University of Waikato - Establishment of a Construction Works Contractor Panel (309045)
Property Services