RFP2773 - Stage 2 - Jonas Street Stormwater Upgrade
Timaru District Council
Timaru District Council completed a stormwater assessment of the Jonas Street / Grasmere Street catchment to address flooding at 41 Grasmere Street. The assessment identified pipe capacity constraints, network surcharging, and inadequate inlet performance, resulting in significant overland flow during storm events. Option 1 from the pipe performance assessment has been adopted, involving a new stormwater pipeline along Grasmere Street and upstream network upgrades to reduce surcharging. However, flooding is primarily driven by insufficient inlet and sump capacity, with flows exceeding 300 L/s, making inlet capacity the critical design constraint.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
CN000502 - Hingarae Road Seal Extension 2023 - 2024
Taupo District Council
CN000521 - Lake Terrace – Pavement Intervention
Taupo District Council
Brain Injury Screening Tool (BIST) Solution
Accident Compensation Corporation
CN000512 - Tirohanga Road Widening 2023-24
Taupo District Council
CN000495 - Link Road Rehabilitation
Taupo District Council