P.R. # 26-0176 - Supply & delivery of Various Brass Materials.
ZAMBOANGA CITY WATER DISTRICT - ZAMBOANGA CITY ZAMBOANGA DEL
BRASS MATERIALS 12mmØ Brass Ball Valve ---------------------------------------------------------------- 5 pcs 25mmØ Brass Ball Valve ---------------------------------------------------------------- 1 pc 50mmØ Brass Ball Valve ---------------------------------------------------------------- 1 pc 19mmØ Brass Corporation Cock, (ISO) Clamp Type ------------------------------------- 2 pcs 75mmØ Brass Angle Fire Hydrant (Threaded Type) ------------------------------------- 4 sets w/ 63mmØ Hose Connector NOTE: 1. Register your bids to the BAC Secretariat before dropping the bid in the bidding box. 2. Delivery Period: 45 Calendar days upon receipt of P.O. 3. Warranty Period: 3 Months for Expendable supplies after acceptance by the procuring entity. 4. Price Validity: 120 C.D. 5. If applicable, the BAC may require the bidder to submit un-amended sales literature, brochure, shop drawing or samples. Non-submission of which may be a ground for disqualification. In case the bidder failed to submit the aforementioned requirements, then the product being offered by the winning bidder shall be subjected to inspection pursuant to RA 9184 and its IRR and Government Procurement Manual (GPM Vol. 2) and pertinent COA regulations on technical inspection and acceptance procedures by the procuring entity’s authorized inspectors. 6. Payment Terms: NO COD 7. All erasure must be initialed to avoid disqualification. 8. Delivery Point: Property Section, ZCWD Motorpool, Pasonanca, Zamboanga City. 9. Approved Budget Cost (ABC): P 148,959.68 10. The bidder is required to submit within 3 calendar days from the date of the bid opening the following requirements: Mayor’s/Business Permit, Omnibus Sworn Statement and Philgeps Registration. Failure to submit the required documents within the time frame may be a ground for disqualification. The bidder may also submit these documents together with its Request for Quotation (RFQ). 11. In case where an occurrence of a tie among bidders, BAC shall conduct dr
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
P.R. # 26-0216 - Supply & delivery of Various Hardware Materials.
ZAMBOANGA CITY WATER DISTRICT - ZAMBOANGA CITY ZAMBOANGA DEL
P.R. # 26-0071 - Supply & Installation of ZCWD New Signage with Lights.
ZAMBOANGA CITY WATER DISTRICT - ZAMBOANGA CITY ZAMBOANGA DEL
SUPPLY AND DELIVERY of Additional Water Supply Materials
TUY WATER DISTRICT
Procurement of Parts and Materials for the Repair and Materials of a Heavy Equipment detailed at the City Environmental and Sanitation Unit of the City of Dasmariñas
CITY OF DASMARIÑAS, CAVITE
Supply and Delivery of Valve, Air Release D.I Double Orifice, 2"Ø (DN50)
PUERTO PRINCESA CITY WATER DISTRICT
Free tender alerts
Get a weekly digest of Philippines tenders
New Philippines tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.