Skip to main content
All Philippines tenders
Philippinessuppliesnegotiated

MAINTENANCE OF ENVIRONMENTAL FACILITY

NATIONAL POWER CORPORATION - MINDANAO GENERATION

SCOPE OF WORKS: THE WINNING BIDDER SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, SUPERVISION, PERMITS (IF APPLICABLE) AND OTHER INCINDENTIALS NECESSARY TO COMPLETE THE PROJECT, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: MOBILIZATION AND SITE PREPARATION * DELIVERY OF EQUIPMENT, MATERIALS, TOOLS, AND CONSUMABLE ITEMS AT AGUS HE PLANT. * CONDUCT TOOL BOX MEETING WITH THE AGUS 6/7 HEP SAFETY OFFICER AND MAINTENANCE PERSONEL FOR THE SAFETY PROTOCOL AND OTHER CONCERNS. * SECURE WORK PERMITS TO THE SAFETY OFFICER AND CHIEF SECURITY OFFICER OF AGUS 6/7 HEPC BEFORE PROCEED. 1. MECHANICAL LIFTING & SYSTEMS A. SUPPLY AND INSTALL 3 TONS OF MANUAL HAND WINCH TO AUTOMATE THE INSTALLATION/LAYING OF SPILL BOOM ACROSS TAIL RACE, WATER WAYS B. INTERGRATE THE HANDWINCH WITH THE EXISTING CONCRETE BLOCK. C. REINFORCEMENT OF THE FRAME HOLDING BOOM REEL TO WITHSTAND THE DRAG INDUCED BY WATER CURRENT. 2. ROPE AND CABLE INSTALLATION A. SUPPLY AND INSTALL NEW HEAVY-DUTY WIRE ROPES OR STAINLESS CABLES SUITABLE FOR MARINE ENVIRONMENTS B. ENSURE PROPER WINDING ON THE REEL TO PREVENT OVERLAPPING OR JAMMING. 3. FOUNDATION FOR CABLE CONNECTOR A. EXCAVATE AND POUR A REINFORCED CONCRETE FOUNDATION TO SUPPORT A FIXED CABLE CONNECTOR OR ANCHOR B. ENSURE THE FOUNDATION IS DESIGNED TO WITHSTAND THE MAXIMUM TENSION OF THE BOOM DURING DEPLOMENT IS STRONG CURRENTS. 4. ANCHOR BOLT INSTALLATION A. INSTALL HEAVY- DUTY CHEMICAL OR MECHANICAL ANCHOR BOLTS TO SECURE THE REEL FRAME EXISTING FLOOR B. PERFORM PULL-OUT TEST TO VERIFY ANCHOR INTEGRITY. 5. FABRICATION & METAL WORKS FRAME REINFORCEMENT A. FABRICATE AND WELD ADDITIONAL SUPPORT STRUTS FOR THE A-FRAME TO ACCOMMODATE THE NEW MOTORIZED COMPONENTS. 6. FINAL INSPECTION A. CONDUCT A FINAL INSPECTION TO ENSURE ALL WORK IS COMPLETED TO THE REQUIRED STANDARDS AND IS FREE TO DEFECTS 7. MANPOWER REQUIREMENTS * THE PROJECT SUPERVISOR MAY ALSO SERVE AS THE SAFETY OFFICER, PROVIDED THE HE/SHE POSSESSES A VALID BOSH OR COSH * CERTIFICATE AND P

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of Philippines tenders

New Philippines tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.