Skip to main content
All Romania tenders

Romania – Feasibility study – Serv de proiect faza SF pt ob:LOT1:Pod pe DN24C km57+592judBT;Pod pe DN24C km58+393judBT;Pod pe DN24C km61+448judBT;Pod pe DN24C km90+456judBT;Pod pe DN24C km98+744judBT;LOT2:PodDN17A km15+049judSV;PodDN2E km53+391judSV;PodDN2E km54+152judSV;PodDN12C km47+298judNT;PodDN

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Obiectul prezentului Contract de Servicii este elaborarea Studiului de Fezabilitate pentru urmatoarele obiective: Lot 1 1.Pod pe DN 24C km 57+592, judetul Botosani; 2.Pod pe DN 24C km 58+393, judetul Botosani; 3.Pod pe DN 24C km 61+448, judetul Botosani; 4.Pod pe DN 24C km 90+456, judetul Botosani; 5.Pod pe DN 24C km 98+744, judetul Botosani; Lot 2 1.Pod DN 17A km 15+049, judetul Suceava; 2.Pod DN 2E km 53+391, judetul Suceava; 3.Pod DN 2E km 54+152, judetul Suceava; 4.Pod DN 12C km 47+298, judetul Neamt; 5.Pod DN 7 km 192+186 la Calimanesti, judetul Valcea; Lot 3 1.Pod DN 15 km 335+165, judetul Neamt; 2.Pod DN 15 km 347+065, judetul Bacau; 3.Pod DN 15 km 351+041, judetul Bacau; 4.Pod DN 15C km 10+565, judetul Neamt. in conformitate cu prevederile Caietului de Sarcini si ale legislatiei in domeniu. In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificarile si completarile ulterioare, termenul limita pana la care orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificari sau informatii suplimentare in legatura cu documentatia de atribuire este cu 18 zile inainte de termenul limita de depunere a ofertelor. In conformitate cu prevederile art. 160 alin. (2) din Legea 98/2016 cu modificarile si completarile ulterioare, Autoritatea Contractanta stabileste un singur termen limita in care va raspunde tuturor solicitarilor de clarificare/ informatiilor suplimentare, dupa cum urmeaza: cu 11 zile inainte de termenul limita de depunere a ofertelor. Termenul de raspuns la clarificari a fost stabilit astfel incat operatorii economici sa aiba o perioada adecvata pentru analizarea documentatiei de atribuire si, ulterior, pentru elaborarea ofertelor prin prisma raspunsurilor oferite de Autoritatea Contractanta.

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity

Romaniaservices

Romania – Feasibility study – Serv de proiect faza SF pt ob:Lot 1:Pod DN11A km 5+880,jud BC;Pod DN11A km 6+850,jud BC;Pod DN11A km 13+700,jud BC;Pod DN11A km 15+085,jud BC;Pod DN11A km 19+160,jud BC;Lot 2:Pod DN11A km 21+235,jud BC;Pod DN11A km 23+170,jud BC;Pod DN11A km 28+099,jud BC;Pod DN11A km 2

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Estimated value€2.1m
323252-2026
Romania

Romania – Feasibility study – Servicii de proiectare faza SF: Lot 1-1.Podet DN 2 km 408+212 jud. Suceava;2.Podet DN 2 km 408+572 jud. Suceava;3.Podet DN 2 km 461+902 jud. Suceava;4.Pod DN 17B km 49+176 jud. Suceava;5.Pod DN 29A km 12+856 jud. Suceava;Lot 2-1.Podet DN 29C km 26+815 jud. Botosani;2.Po

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A.

Estimated value€1.4m
301161-2026
Romaniaworks

Romania – Construction work for gas pipelines – Conducta de interconectare intre conducta de transport gaze naturale DN 1200/DN 1000 Tuzla - Podișor și conductele Isaccea - Negru Vodă T2 (DN 1200) și T3 (DN 1200), județul Constanța

Societatea Nationala de Transport Gaze Naturale TRANSGAZ SA

Estimated value€33.0m
323416-2026
Croatia

Croatia – Construction, foundation and surface works for highways, roads – Izgradnja DC12: Čvorište Vrbovec 2 (D10) - Bjelovar - Virovitica - G.P.Terezino Polje (Gr.R.Mađ.), dionica Bjelovar - Virovitica - G.P. Terezino Polje (Gr.R.Mađ.), duljine 60 km, Etape 1C i 2A, L=11,37 km

Hrvatske ceste d.o.o.

Estimated value€61.5m
297726-2026
Romaniaworks

Romania – Urban development construction work – Componenta Mobilitate urbana, SMIS 342136 - Executia lucrarilor de infrastructura inclusiv livrare si instalare echipamente si dotari -Pietonizare si trafic controlat in zona centrala a Municipiului Ploiesti

MUNICIPIUL PLOIESTI

Estimated value€32.3m
312447-2026