Skip to main content
All Saudi Arabia tenders
Saudi ArabiaGeneral Procurement NoticeIsDB Member Country Bidding

Reconstruction of the Karabakh Irrigation Canal Project - GPN

Azerbaijan

GENERAL PROCUREMENT NOTICE AZERBAIJAN “Reconstruction of the Karabakh Irrigation Canal Project” GENERAL PROCUREMENT NOTICE Mode of Financing: Installment Sale and IsDB Grant Financing No. AZE 1028 The IsDB is hereby providing Installment Sale and grant financing of US$436.67 million to cover part of the financing costs of the “Reconstruction of the Karabakh Irrigation Canal Project”. The project will include the following components. Component 1 - Civil Works: 1.1 Main Canal Works and Associated Structures: This sub-component will rehabilitate and climate-proof the Karabakh Main Irrigation Canal through the reconstruction and lining of approximately 168 km canal, restoration/replacement of associated hydraulic structures, and targeted protection works to reduce seepage and evaporation losses and restore reliable delivery to downstream command areas. The main canal works will be sequenced into four contiguous sections sized to their design discharges: Section-1: km 0+000–27+000 at 135 m³/s; (Rectangular Channel) Section-2: km 27+000–67+000 at 117 m³/s;(Trapezodial Channel) Section-3: km 67+000–106+000 at 92 m³/s;(Trapezodial Channel) Section-4: km 106+000–168+000 at 62 m³/s (Trapezodial Channel). Section-1: km 0+000–27+000 at 135 m³/s; (Rectangular Channel) Section-2: km 27+000–67+000 at 117 m³/s;(Trapezodial Channel) Section-3: km 67+000–106+000 at 92 m³/s;(Trapezodial Channel) Section-4: km 106+000–168+000 at 62 m³/s (Trapezodial Channel). Section-1: km 0+000–27+000 at 135 m³/s; (Rectangular Channel) Section-2: km 27+000–67+000 at 117 m³/s;(Trapezodial Channel) Section-3: km 67+000–106+000 at 92 m³/s;(Trapezodial Channel) Section-4: km 106+000–168+000 at 62 m³/s (Trapezodial Channel). Activities include earthworks, canal reshaping, concrete/approved impermeabilization, reconstruction of checks/gates, siphons, culverts, aqueducts, cross-drainage and road/rail crossings, measurement structures, bank protection and erosion control, service access, and site-specific en

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity

Reconstruction of the Karabakh Irrigation Canal Project - GPN — Saudi…