Skip to main content
All United States tenders

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 | Kevin Rodgers | NCO 4 Construction East (VA-26-00030476)

244-NETWORK CONTRACT OFFICE 4 (36C244)

Project Name: Upgrade Substation Building 2, Phase 1 Project No: 642-22-104 -- Construction Phase SET-ASiDE 100% FOR SERVICE-DISABLED VETERAN-OWNED BUSINESS Acquisition Information: In accordance with FAR Subpart 5.2, This opportunity is 100% set-aside for Service- Disabled Veteran-Owned Businesses (SDVOSB) Contractors. This acquisition is conducted in accordance with FAR Part 36 & 15, Request for Proposal (RFP). Award will be based on Best Value Trade-Off selection procedures. Work to be Performed: Corporal Michael J. Crescenz Medical Center (CMCVAMC) in Philadelphia, Pa requires replacement of Electrical Substations 1 and 2 to increase electrical capacity to support future facility projects. The existing substations are approximately 29 years old and require replacement to support current and future electrical demands. This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service to the facility during demolition and construction activities. Upon completion of construction, the temporary substation shall remain installed as a spare substation for the facility. All work shall be phased to minimize service outages and maintain continuous operation of the medical center. Defined and issued bid documents (drawings and specifications) will serve as the basis of this construction project. This project must provide complete and functional material and systems in accordance with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. This applies to each system and every system, as a whole, which is affected by this project, even if only partially modified. The systems and equipment must maximize energy efficiency to the maximum extent practical. All work shall be performed in accordance with the Specifications and Drawings, and shall follow all

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity

Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 | Kevin Rodg…