Premise Wiring B246 & B414
FA3022 14 CONS LGCA
Columbus AFB has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) the upgrade of premise wiring infrastructure to Cat-6 for the building's 246 (B246) and 414 (B414) at Columbus AFB, MS. B246: The Contractor shall install approximately 24 cable/jacks (12 DPLX) and coordinate with the 14th CS/SCX to verify for exact drop locations. Install 25pr./24ga. riser cable from MDF copper terminal [66 Block] to 24p PP (CAT III, 5 or 6) in LAN cabinet. B414: The Contractor shall install approximately 12 cable/jacks (3 DPLX, 1 Quad, 2 wall drops) and coordinate with the 14th CS/SCX to verify the exact drop locations. Install 25pr/24ga riser cable from MDF copper terminal [66 block] to 24p PP in LAN cabinet. Note: An updated Statement of Work is available in the Attachments. Questions and answers are available in the Attachments.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Service Gate #1 Wire Rope and Lower Sheave Block Replacement, Franklin Falls Dam, Franklin, NH
W2SD ENDIST NEW ENGLAND
Install Exhaust System Fire Station Bldg 145
W7MX USPFO ACTIVITY CAANG 144
Supply and installation work of new Bed Lift at Bandartila City Corporation Market in 39no ward.
Office of Superintendent Engineer (Elec.)
316 CES Washer Dryer and Cooktops Maintenance
FA2860 316 CONS PK
INSTALLATION OF FIBER OPTICS AND STRUCTURAL CABLING
BUREAU OF FIRE PROTECTION - REGION VIII