Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
US ARMY ENGINEER DISTRICT MOBILE
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
7A20--Live Data Procedural Suites (VA-26-00060048)
TECHNOLOGY ACQUISITION CENTER NJ (36C10B)
VALVE ASSEMBLY,MANI_End_Item_F101_NSN_4810011438543JF_PN_721599D
DLA AVIATION AT OKLAHOMA CITY, OK
Post-Fire Noxious Weed Treatment on the Fort Pierre National Grasslands
USDA-FS, CSA INTERMOUNTAIN 1
SB ERS MATOC, USACE Northwestern Division and EPA Region 2
W071 ENDIST KANSAS CITY
Columbus MEPS Noon Meals FY 27
W6QM MICC-FT KNOX
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.