Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
W071 ENDIST PORTLAND
*** 18 September 2026 - Amendment W9127N26BA0240004 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 31 68 13.00 99 – GROUND ANCHORS, Part 1 GENERAL, Paragraph 1.5.2 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 31 73 20.00 99 – JET GROUTING, Part 1 GENERAL, Paragraph 1.7.1 Qualifications are changed as detailed in the SUMMARY OF CHANGES. Solicitation Specifications, Section 00 73 00 – Supplementary Conditions, Paragraph L. - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984), the Period of Performance is amended as detailed in the SUMMARY OF CHANGES. This will allow for work to occur during the 2029 and 2030 In Water Work Window years. Environmental permits remain unchanged by this amendment. Marine Mammal protections as listed in the specification, and as governed by the IHA, included with the Attachments, remain in effect for the permitted years. No in water work, that is governed by IHA, will be allowed beyond the IHA permit years allowed. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 09 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 57 19.00 25 - TEMPORARY ENVIRONMENTAL CONTROLS, Part 3 EXECUTION, Paragraph 3.4.3 PROFESSIONAL ARCHAEOLOGICAL MONITOR. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specifications, Section 00 21 13 – Instruction to Bidders, and Section 00 21 00 – Instructions. Additionally, it extends the solicitation period and provides for an additional site visit. The
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
C-UAS System & Peripherals
FA4484 87 CONS PK
Land Survey Equipment - Trimble
FA8051 772 ESS PKD
PIP-II SSRS AND LB650 VACUUM GAUGE AND READOUT
FERMILAB - DOE CONTRACTOR
16292 Steam Boiler Replacement
FA8222 AFSC PZIE
Electronic Security System VIII Official Solicitation
W2V6 USA ENG SPT CTR HUNTSVIL
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.