Environmental Science Center Boiler Replacement Limited Source Justification
REGION 3 CONTRACTING OFFICE
Limited Source Justification (LSJ) In Accordance with FAR 8.4 (RFO DEV), GSAR 538.7104-3 and EPA Policy (EPAAP) Subsection 6.3.1 (Note that this LSJ is drafted in accordance with the EPA FAR Class Deviation, RFO-2025-08) REFERENCE: PR-R3-26-00548 – Environmental Science Center Boiler Replacement 1. Identification of the agency and contracting activity. Procurement Office: US EPA Mid-Atlantic Region Agency: Environmental Protection Agency GSA Schedule Contract Number: Contract GS-21F-058AA primarily SINS 561210FAC Task Order Number: 68HE0322F0052 Contractor Name: Native Energy & Technology, Inc. Government Estimate/Estimated Contract Value: $8,071,205.09 Description of Requirement: EPA Region 3 intends to award a Task Order (TO) modification to increase the ceiling of this award by $427,038.68 to allow for the replacement of boiler tubes for three (3) boilers and two (2) boiler controllers for the Environmental Science Center. 2. Nature and/or description of the action being approved. General Services Acquisition Regulation (GSAR) 538.7104-3(b)(1)(i) Limited sources justification and approval. An increase of the ceiling to TO 68HE0322F0052 with Native Energy & Technology, Inc. under U.S. General Services Administration (GSA) Federal Supply Schedule (FSS) GS-21F-058AA. This is an urgent and compelling requirement to replace the tubes in three (3) boilers and controllers in two (2) boilers that provide heat to the Environmental Science Center (ESC). Orders placed under Federal Supply Schedules are exempt from the requirements in Part 6. However, an ordering activity must justify its action when restricting consideration in accordance with General Services Acquisition Regulation (GSAR) 538.7104-3. Circumstance justifying limiting the source: GSAR 538.7104-3(b)(1)(i) The Government’s need to maintain working building boilers for the ESC represents an unusual and compelling urgency that precludes full and open competition and delay in award of a contract would result in u
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF
NAVSUP WEAPON SYSTEMS SUPPORT MECH
61--POWER SUPPLY, IN REPAIR/MODIFICATION OF
NAVSUP WEAPON SYSTEMS SUPPORT MECH
61--POWER SUPPLY, IN REPAIR/MODIFICATION OF
NAVSUP WEAPON SYSTEMS SUPPORT MECH
59--CIRCUIT CARD ASSEMB
NAVSUP WEAPON SYSTEMS SUPPORT MECH
59--CIRCUIT CARD ASSEMB
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.