South Bay International Wastewater Treatment Plant (SBIWTP) Rehabilitation and Expansion Progressive Design-Build (PDB)
INTERNAT. BOUNDARY AND WATER COMM.
The purpose of this modification is to incorporate additional construction packages and Phase 1 expansion work into the progressive design-build contract. The modification adds the following construction packages: Early Work Package (EWP) 1C – Replacement In Kind Final Construction Price: $13,147,453 Scope includes: Removal and replacement of existing roofs. Replacement of process equipment and piping. Replacement of electrical equipment. Replacement of odor control media. Installation of new window sealants. Replacement of coiling doors. Replacement of emergency showers and eyewashes. Painting and coating of existing facilities. Early Work Package (EWP) 3B – Early Procurement Final Construction Price: $25,693,528 Scope includes procurement of critical long-lead equipment, including: Standby generators and associated switchgear. Medium-voltage switchgear. Positive displacement blowers. Submersible solids-handling pumps. Dewatering centrifuges. Stainless steel slide gates. Stop logs. Early Work Package (EWP) 4 – Major Concrete Structures Final Construction Price: $37,468,188 Scope includes: Construction of major concrete structures for new Headworks facilities. Primary Sedimentation Tanks 6 and 7. Storage Warehouse. New influent and drainage infrastructure. Associated piping, carpentry, architectural, mechanical, electrical, and support features. Phase 1 Base Construction Expansion Final Construction Price: $369,613,306 Scope includes: New Headworks facility with integrated pump station. Screening and grit removal systems. Primary sedimentation expansion. Centralized odor control facilities. Waste activated sludge thickening and storage facilities. Dewatering upgrades. Lime storage/feed and truck loadout facilities. Storage warehouse. Chlorination storage facility. Administrative building expansion. Multiple electrical buildings. New electrical service, generators, utility distribution systems, process piping, and site work. Rehabilitation of existing activated sludg
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Protective Coating Maintenance IDIQ
FA3020 82 CONS LGC
Repair of the B-52 Electronic Amplifier
FA8117 AFSC PZABA
New Manufacture Material, NSN 2995010074738OK (AMC 4B)
DLA AVIATION AT OKLAHOMA CITY, OK
SOLICITATION Cadet Swords USMA West Point
W6QM MICC-WEST POINT
NSN 1680-016199210, NRP, ROLLER SWAGING
DLA AVIATION
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.