Belle Fountain Ditch Cleanout Phase 2
W07V ENDIST MEMPHIS
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Instrument Landing Structure (ILS)
W076 ENDIST FT WORTH
63--SENSING ELEMENT,FIRE D
DLA AVIATION
61--CABLE ASSEMBLY,POWER,E
DLA AVIATION
59--CABLE ASSEMBLY,SPECIAL
DLA AVIATION
61--ADAPTER,BATTERY CHARGE
DLA LAND AND MARITIME
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.