USCG Cutter Eagle New Dredging for Berthing at New London City Pier
AMENDMENT 0003 Posted October 16, 2026 to update Item 0002-Optional Item 1 in the IFB, by deleting the first paragraph to clarify that we're asking for the additional disposal costs for coated/treated piling. Please replace page 5 of the IFB with the updated one provided in this amendment. AMENDMENT 0002 Posted October 13, 2026 (Revised Bid Opening Date 10/22/2026 2pm EST) AMENDMENT 0001 Posted October 08, 2026 Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN # 24014900. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW. Dredge quantity of 3,700 CY. This estimate is based on an average of the past annual dredging and surveys. The Contractor shall provide a cost for dredging per cubic yard. That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge. Contractor will be compensated for actual quanti
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
DCDO - HVAC Maintenance
FA5270 18 CONS PK
CIRCUIT CARD ASSEMB
NAVSUP WEAPON SYSTEMS SUPPORT MECH
CIRCUIT CARD ASSEMB
NAVSUP WEAPON SYSTEMS SUPPORT MECH
PARTS KIT,BALL VALV
NAVSUP WEAPON SYSTEMS SUPPORT MECH
CIRCUIT CARD ASSEMB
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.