Skip to main content
All United States tenders
United Statesservicesrestricted

White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years

260-NETWORK CONTRACT OFFICE 20 (36C260)

White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years The objective of this solicitation is to provide VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with Boiler Plant Inspection Services. The resulting contract should be for one base year and four options years as follows: Base Year: 11/1/2026 to 10/31/2027. Option Year 1: 11/1/2027 to 10/31/2028 Option Year 2: 11/1/2028 to 10/31/2029 Option Year 3: 11/1/2029 to 10/31/2030 Option Year 4: 11/1/2030 to 10/31/2031 Details: The VA SORCC has three heating boilers, each rated at 250HP operating at low pressure (<15 psi), gas and oiled fired. Yearly state inspections are required on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank. SPECIFIC REQUIREMENTS: Contractor to furnish labor, personnel, materials and equipment to perform inspections on the following. (3) Three heating boilers, each rated at 250HP (operating pressure <15psi), gas and oil fired. (1) One deaerator/feed water tank (Option Year 1 and 3 only) Perform a non-destructive test (Option Year 3 only) A certified inspector must be present during the NDT Test in order for the NDT test to be valid. (1) One heat recovery tank (Option Year 1 and 3 only) (1) One condensate tank (Option Year 1 and 3 only) (1) One bottom blow tank (Option Year 1 and 3 only) Inspections to include a TYPE “A” Internal and External inspection and a TYPE “C” External inspection under steam pressure for each boiler. The contractor shall witness and sign a checklist of boiler safety devises as per VA-SORCC testing procedures during the external operational inspection and shall provide a written inspection report upon completion of each inspection to Facilities Management Service. The checklist of required safety devises to be tested will be available to the contractor The inspections are to be scheduled anytime throughout the term of the contract at the discretion of t

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.