Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
W071 ENDIST PORTLAND
*** 20 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): CHANGE IN SOLICITATION SPECIFICATIONS: Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS Paragraph 1.18.4 Traffic Control Plan (TCP) edited. CHANGE IN SOLICITATION ATTACHMENTS: Attachment A16 BN NL Bridge As Builts_combined drawings edited. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 14 October 2026 - Amendment W9127N26BA0240006 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment affects changes to the Block 14 (Description of Amendment/Modification): Solicitation Specifications, Section 01 45 00.00 25 QUALITY CONTROL Paragraph 3.8.1 GOVERNING FIELD TESTING STANDARDS AND FREQUENCIES added. Solicitation Specifications, Section 03 30 00.00 99 CAST-IN-PLACE REINFORCED CONCRETE Paragraph 3.13.1 GENERAL added. Remove drawing C-104 and replace with C-104 - MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. Remove drawing C-106 and replace with C-106 - MARK 1 - AMD-0006 – UPDATE TO PAVING AREA AND NOTES, MARK 2 - AMD-0006 – UPDATE TO DEFINE FENCING AND GATE. Remove drawing C-102 and replace with C-102 – MARK 1 - AMD-0006 – UPDATE TO DEMOLITION NOTES. (SEE ATTACHED AMENDMENT FOR CHANGES) *** 01 October 2026 - Amendment W9127N26BA0240005 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement *** This amendment effects changes to the Block 14 (Description of Amendment/Modification): The Solicitation Period is extended by 21 calendar days which changes the Solicitation Closing Date from October 8, 2026, to October 29, 2026. Solicitation Specifications, Section 01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS, Paragraph 1.18.4 Traffic Control Plan (TCP) edited. Solicitation Specifications, Section 01 45 00.25 25 CONSTRUCTION MANAGEMENT PLATFORM (CMP), Technical Section added in its entirety. (SEE
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
59--INSULATING COMPOUND,EL
DLA LAND AND MARITIME
42--FOUNTAIN,EYE AND FACE
DLA TROOP SUPPORT
42--HOSE ASSEMBLY,NONMETAL
DLA TROOP SUPPORT
53--SPRING,HELICAL,COMPRES
DLA LAND AND MARITIME
45--HEATER,WATER,ELECTRIC
DLA TROOP SUPPORT
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.