Skip to main content
All United States tenders
United Statesservicesopen

Rental- 800 LPAC System- Naval Base Point Loma, San Diego, CA (PLOMA) Amendment 0002

PORTSMOUTH NAVAL SHIPYARD GF

Amendement 0002 is isuued to extend this solication to provide responses to vendor questions received on October 20, 2026. Please see the responses below, provided in bold: Question: would the government accept two Aggreko 400 CFM electric, oil-free compressors operating as one coordinated 800 CFM system, provided all applicable performance, safety, and electrical requirements are satisfied. Answer: No Question: please clarify the requirement for a maximum discharge-air temperature of 100°F while operating in ambient temperatures up to 110°F Answer : Discharge of the compressor shall have a maximum temperature of 100 deg F while it operates outside in the sun in an environment that may reach 110 deg F Question: could you please confirm whether the contractor is also responsible for routing air hoses throughout the ship and connecting them to individual shipboard air inlets, or whether those connections will be handled by government personnel? Answer: The shipboard routing and connections will be handled by government personnel Amendement 0001 is isuued to provide responses to vendor questions received om October 19, 2026. Please see the responses below, provided in bold: Question: Will the compressor operate continuously, 24 hours per day, seven days per week? If not, what are the estimated operating hours per week? Answer:The project will use this compressor whenever is needed for as long as needed. Question: Is the required 800 SCFM measured at the compressor discharge or at the point of use after accounting for dryer purge consumption? Answer: The discharge of the compressor Question: Please confirm the government will provide suitable electrical sources for both the compressor and dryer. Who is responsible for making the final electrical connections? The government will provide suitable electrical sources, however, the contractor will be responsible for making the final connection. Q: Can the government provide an estimated routing distance or layout for the rem

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.