LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
W071 ENDIST OMAHA
The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
SPE4A726R0745 – 5820 - REMOTE CONTROL RADIO DEVICE, HANDHELD / WSIC G
DLA AVIATION
High Pressure Gas Storage Area Concrete Repair
NASA KENNEDY SPACE CENTER
6515--CONSIGNMENT-HEART VALVES- ANN ARBOR
250-NETWORK CONTRACT OFFICE 10 (36C250)
Q702--IT - LOGICARE PATIENT INSTRUCTIONS LICENSE Albany VAMC 36C24227AP1064
242-NETWORK CONTRACT OFFICE 02 (36C242)
17--LUNETTE ASSY,ACFT T
DLA TROOP SUPPORT
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.