Skip to main content
All United States tenders

P-271, E-130J Main Operating and Training Base, MCAS Cherry Point, NC

NAVFACSYSCOM MID-ATLANTIC

This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this pre-solicitation synopsis is to make notice of a proposed contract action for performing pre-construction services and construction services for P-271, E-130J Main Operating & Training Base, Marine Corps Air Station (MCAS) Cherry Point, North Carolina. PROJECT DESCRIPTION: This project constructs all operational and support facilities for E-130J Main Operating Base (MOB) and Fleet Replacement Squadron (FRS) training campus at the Marine Corps Air Station (MCAS) in Cherry Point, NC. New construction facilities include an aircraft parking apron, aircraft access apron, taxiway, three-bay aircraft maintenance hangar, training building, Mobile Support Unit operational compound, and an aircraft maintenance and ground support equipment warehouse. Renovation of existing facilities includes Building 244 for Center for Naval Aviation Technical Training (CNATT) academic and applied training functions associated with the E-130J. The Aircraft Maintenance Hangar will be a two-story building with high-bay, overhead maintenance space to support three E-130J aircraft. The hangar will be constructed as four separate buildings with expansion joints, built on deep foundations using driven precast, prestressed concrete piles. The Hangar Security Building is a single-story security guard house, outside of the PL2 security fenceline, that provides controlled access to the hangar enclave for vehicles and pedestrians. The Training Building is a predominantly single-story building, divided into four massing areas with varying roof heights. Much of the facility is low-rise, with roof heights of 16-20 feet. The Mobile Support Unit Operational Compound is a low-rise, pre-engineered long-span metal building. The Aircraft Maintenance and Ground Support Equipment (GSE) Warehouse is a low-rise, pre-engineered metal building with structural columns located along the middle of each spa

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.