Skip to main content
All United States tenders

Construction of Mandalgobi-Arvaikheer 220kV Double-Circuit Transmission Line (287 km) - (Three lots)

Ministry of Energy, Mongolia

Specific Procurement Notice – Initial Selection Document (ISD) Invitation for Initial Selection Plant (Design, Supply, and Installation) Procurement of: Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots Employer: Ministry of Energy of Mongolia (MOE) Project: Fourth Energy Sector Project (ESP4) Contract title: Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots Country: Mongolia Loan No.: IBRD Loan No. 9873-MN RFB No: MN-MOE-ESP4-1-CW-RFP Issued on: 29 October 2026 The Government of Mongolia has applied for financing from the World Bank toward the cost of the Fourth Energy Sector Project (P509161) and intends to apply part of the proceeds toward payments under the contracts for “ Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV Double-Circuit Transmission Line (287 km), in Three Lots” . The Ministry of Energy intends to initially select Applicants for Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots. CONTRACT DESCRIPTION CONTRACT PERIOD Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots Lot 1: Tower No.1 to Tower No. 288 Lot 2: Tower No. 289 to Tower No. 580 Lot 3: Tower No. 581 to Tower No. 868 Time for Completion: 24 months (Design Verification, Update and Construction) for each lot (Lot 1, Lot 2 and Lot 3) Defect notification period: 36 months Applicants are expected to have the following minimum requirements: A. For International Applicants Item Qualification Criteria (US$ million) Lot 1 Lot 2 Lot 3 For Multiple Lots Minimum average annual turnover in Plant Design, and/or Supply and/or Installation within the last 3 years (2023, 2024 and 2025) 11.00 11.00 11.00 Two lots: US$ 22.0 million; Three lots:

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.