Ross Springs Waterline Replacement
ASHLEY NATIONAL FOREST
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
WSNC Medical Coding Books
260-NETWORK CONTRACT OFFICE 20 (36C260)
47--TUBE ASSEMBLY,METAL
DLA AVIATION
31--BEARING SET,SLEEVE
DLA AVIATION
16--LEVER,REMOTE CONTROL
DLA AVIATION
45--HEATER,VENTILATION,DUC
DLA TROOP SUPPORT
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.