LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
W071 ENDIST OMAHA
The project is located along the right descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Software support and maintenance for InnovMetric PolyWorks
FLEET READINESS CENTER
Currency Labels
OFFICE OF THE CHIEF PROCUREMENT OFFICER
Floor Refinishing Services
Presolicitation Notice to Sole Source for Experimental Pathology Laboratories, Inc. (EPL)
C1DA--589-26-133, Replace Roofs for Building 1, Phase 1 l KCVA
255-NETWORK CONTRACT OFFICE 15 (36C255)
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.