FLW Renovate 3 SPRC Buildings
Notice to Industry The U.S. Army Corps of Engineers, Kansas City District is notifying industry that the following requirement is being pursued as a Progressive Design Build Other Transaction (PDB-OT) under 10 USC 2808a, Other Transaction for Construction. This notice is for informational purposes only to notify industry and seek feedback on the strategy. Project Overview Project Title: FLW Renovate 3 SPRC Bldgs Location: Fort Leonard Wood, MO Agency: USACE, Kansas City District (NWK) NAICS Code: 236220-Commerical and Industrial Building Construction Magnitude for this project is estimated between $20M and $30M The Kansas City District is seeking a Progressive Design Build partner to design and construct three buildings for the Soldier Performance Readiness Center (SPRC). The SPRC is the primary facility for the Army’s Holistic Health and Fitness (H2F) program, designed to deliver immersive, integrated physical and mental conditioning to maximize individual and unit readiness. The SPRC is a unit‑owned, specialized performance training center that goes beyond a standard gym or clinic. It is staffed by certified H2F performance professionals and used for physical training, injury reconditioning, cognitive performance support, and athletic development. Fort Leonard Wood has three existing facilities that will need to be remodeled to serve as SPRC’s for three different units. Buildings range from approximately 8,484 - 12,189 gsf. Remodel will include new HVAC, electrical systems, lighting, plumbing and fire system upgrades. Spaces will need to be reconfigured to support administrative, physical rehab and counseling offices and include ADA accessibility to the buildings. Using the authorities granted with 10 USC 2808a, the intent will be for a Design-Builder to design all three buildings and then move into construction as funding becomes available for each building. If you are interested in pursuing this PDB-OT, please send an email to the addresses below. We also ask th
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB
W072 ENDIST LOUISVILLE
INDUSTRY DAY: FORT HUNTER LIGGETT BARRACKS PDB-OTA
W072 ENDIST LOUISVILLE
Market Intelligence Notice: Fort Hood Bldg 410 General Stilwell Army Reserve Center (ARC)
W072 ENDIST LOUISVILLE
C222--589-27-108, Correct Electrical Deficiencies in Building 26 KCVA (ME) FY27 NRM VISN Base - AE (VA-27-00021035)
255-NETWORK CONTRACT OFFICE 15 (36C255)
C222--589-27-108, Correct Electrical Deficiencies in Building 26 KCVA (ME) FY27 NRM VISN Base - AE (VA-27-00021035)
255-NETWORK CONTRACT OFFICE 15 (36C255)
Free tender alerts
Get a weekly digest of United States tenders
New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.