Skip to main content

Public tenders

Tenders

Live results from every procurement portal we monitor. Refine the search using the filter bar above.

108,498 matching · page 102 of 4,521

United Statessupplies
closing in 2 weeks

45--PIPE,AIR CONDITIONING-HEATING

DLA TROOP SUPPORT

Estimated valueUS$68,310
302031b2952a4ead90f7ffa3d0b1c7d8
United Statessupplies
closing in 2 weeks

81--SUPPORT,SHIPPING AND STORAGE CONTAIN

DLA TROOP SUPPORT

Estimated valueUS$33,534
11077451530d43809f12005dfbb777c6
United Statessupplies
closing in 2 weeks

17--CYLINDER,NITROGEN P

DLA TROOP SUPPORT

Estimated valueUS$140,250
2f9d5552c4fb4b40ac96fd7e565e6ed2
United Statessupplies
closing in 2 weeks

62--LIGHT,LANDING,AIRCRAFT

DLA TROOP SUPPORT

Estimated valueUS$73,793
f86f5f9963fb48babaab6212ddd5054f
United Statessupplies
closing in 2 weeks

59--RACK,ELECTRICAL EQU

DLA AVIATION

Estimated valueUS$37,115
0f8d05df09fa499faaba28dabdc51e27
United Statessupplies
closing in 2 weeks

20--WEAR PLATE,DOOR,MARINE

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 32.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
7358362477c144dbb321f04994d62dcd
United Statessupplies
closing in 2 weeks

42--KIT,REPLACEMENT AIRLINE FILTER

DLA TROOP SUPPORT

Estimated valueUS$40,448
ccb96f662c99468b9d40be2ce35349f6
United Statesservices
closing in 2 weeks

Polar Rover for Observation, Mapping, and In-Situ Exploration (PROMISE) Mission

NASA MARSHALL SPACE FLIGHT CENTER

Refurbishment, qualification, and delivery of a scientific radiation measurement instrument to support lunar surface exploration activities associated with the Polar Rover for Observation, Mapping, and In-Situ Exploration (PROMISE) mission. Efforts include engineering analysis, environmental testing, systems integration support, mission operations support, and scientific data analysis associated with the collection and interpretation of radiation measurements on the lunar surface. Some of the efforts require the development and refinement of specialized software tools, data processing techniques, and operational methodologies to support instrument integration, data collection, and analysis throughout the mission lifecycle. The instrument Principal Investigator (PI) and team must have extensive experience in the design, development, testing, operation, and scientific analysis of spaceflight radiation instruments supporting planetary exploration missions. Team members shall work on the original design, fabrication, qualification, and operation of the instrument and have supported the collection and analysis of scientific data for an extended operational period. The current version of the instrument is based on their original design and flight hardware and software development. Additionally, the team has developed specialized software programs, operational processes, and analytical algorithms necessary to support instrument performance assessment, data processing, and scientific interpretation. The team will provide technical support for instrument refurbishment, flight qualification, integration, mission operations, and scientific investigations in support of PROMISE mission objectives.

Estimated valueNot disclosed
1faede0fe1cb4578b1a344b900718abd
United Statessupplies
closing in 2 weeks

59--CONNECTOR,PLUG,ELECTRICAL

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 312.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
ff80ed0fa79a4f46bee52d92ded79240
United Statessupplies
closing in 2 weeks

66--LENS,OPTICAL INSTRUMENT,MOUNTED

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 33.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
780f071eb8a6416a830e9efd84e18f0d
United Statessupplies
closing in 2 weeks

43--FILTER ELEMENT,FLUID

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 148.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
60f8cc73c73f46e192e52634c47a9199
United Statessupplies
closing in 2 weeks

65--ADAPTER,Y-PIECE,TRACHEAL ANESTHESIA

DLA TROOP SUPPORT

Estimated valueUS$49,000
cdd19132ff234c2db1aed99925953203
United Statessupplies
closing in 2 weeks

62--LAMP UNIT,VEHICULAR

DLA TROOP SUPPORT

Estimated valueUS$26,482
184d22609c174e779f695819bba5b495
United Statessupplies
closing in 2 weeks

28--ENGINE BLOCK ASSEMBLY,DIESEL

DLA LAND AND MARITIME

Estimated valueUS$42,894
e34a4f10eda842b987c94903d42df1a6
United Statessupplies
closing in 2 weeks

42--PROPORTIONER,FOAM L

DLA TROOP SUPPORT

Estimated valueUS$28,891
8210859fadc047e9a72d43d2cec83a18
United Statessupplies
closing in 2 weeks

44--FILTER,AIR,ELECTROSTATIC

DLA TROOP SUPPORT

Estimated valueUS$54,685
796df78b90b84affaabf759e589714c1
United Statessupplies
closing in 2 weeks

44--COOLER,FLUID,INDUSTRIAL

DLA TROOP SUPPORT

Estimated valueUS$310,854
a55a539588144fb8bff9b7af311232ea
United Statessupplies
closing in 2 weeks

25--GRILLE,RADIATOR,VEHICULAR

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 12.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
c27ad4fbb4c548d098494f63d8129545
United Statessupplies
closing in 2 weeks

59--BACKSHELL,ELECTRICAL CONNECTOR

DLA LAND AND MARITIME

Indefinite Delivery Contract: Estimated quantity 240.000 ; Not to Exceed 350,000.00

Estimated valueUS$350,000
e08ccc9719a74d0898c52db1f06b70bd
United Statesservices
closing in 7 days

C1DA--657-27-209JB Renovate Main Lobby, Bldgs 1 & 53

255-NETWORK CONTRACT OFFICE 15 (36C255)

Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbes

Estimated valueNot disclosed
b2c8f63a5b5b476fb1aee7dddbbaef67
United Statesworks
closing in 2 weeks

Mud Mountain Dam Sewage Lagoon Repair

W071 ENDIST SEATTLE

This requirement is for the cleaning, inspection, and repair of the Mud Mountain Dam Sewage Lagoon. A site visit will be offered on 17 November 2026, see attachment for information and registration. Please pay attention to: Section L, Section M, and FAR 52.228-13 in the solicitation.

Estimated valueNot disclosed
d2ece76f8de6458a82fc975939de3369

DataMesh Tender Radar

Win more UK IT & software tenders — one curated email a week

We watch Find a Tender & Contracts Finder so you don't have to. Every Monday you get the new UK IT & software tenders worth bidding on — curated by hand, not scraped and dumped.

  • Hand-curated — no keyword spam, no duplicates
  • Every notice with its buyer, value, deadline & how to bid
  • One email a week — cancel anytime
£29/ month

One won contract pays for years of it.

Subscribe

Not ready? Get one free sample first.

Filtered tenders — DataMesh Consulting