Skip to main content

Public tenders

Tenders

Live results from every procurement portal we monitor. Refine the search using the filter bar above.

36,877 matching · page 769 of 1,537

Malaysiaservices
closing in 3 weeks

PERKHIDMATAN PERUNDING BAGI KAJIAN LELAKI BUDIMAN NEGARA

LEMBAGA PENDUDUK DAN PEMBANGUNAN KELUARGA NEGARA (LPPKN)

1. FIRMA PERUNDING BOLEH MENDAPATKAN DOKUMEN PELAWAAN PADA 19 MEI 2026 SEHINGGA 15 JUN 2026 DI UNIT PEROLEHAN, TINGKAT 18 BANGUNAN LPPKN.2. DOKUMEN PELAWAAN YANG LEWAT DIHANTAR SELEPAS TARIKH DAN MASA TUTUP TAWARAN TENDER TIDAK AKAN DIPERTIMBANGKAN3. FIRMA PERUNDING DIWAJIBKAN MEMBAWA SALINAN SIJIL-SIJIL BERKAITAN SEMASA MENDAPATKAN DOKUMEN PELAWAAN, SIJIL-SIJIL BERKENAAN MESTILAH MASIH SAH LAKU TEMPOHNYA LPPKN MEMPELAWA FIRMA-FIRMA PERUNDING YANG BERMINAT DAN BEFDARTAR DENGAN KEMENTERIAN KEWANGAN MEMBUAT TAWARAN BAGI PELAKSANAAN PROJEK TERSEBUT

Estimated valueMYR 3.7m
PERKH/LPPKN BIL.2/2026
Malaysiaworks
closing in 2 weeks

PRA KELAYAKAN MENAIKTARAF JALAN POS SINDERUT, LIPIS, PAHANG

CAWANGAN JALAN JKR

(A)KONTRAKTOR HENDAKLAH BERDAFTAR DENGAN CIDB DAN MEMPUNYAI PERAKUAN PENDAFTARAN KONTRAKTOR (PPK) YANG MASIH SAH DALAM GRED G7, KATEGORI CE, PENGKHUSUSAN CE01,CE02;(B1)KONTRAKTOR JUGA HENDAKLAH BERDAFTAR DAN MEMPUNYAI SIJIL PEROLEHAN KERJA KERAJAAN (SPKK) YANG MASIH SAH DALAM GRED G7 DAN KATEGORI CE ATAU (B2)BERDAFTAR DENGAN PUSAT PENDAFTARAN KONTRAKTOR KERJA, BEKALAN DAN PERKHIDMATAN NEGERI SABAH (PUKONSA)DALAM KELAS A, TAJUK I DAN TAJUK KECIL 1,2

Estimated value
JKR/CKUB/24185/2026
Malaysiaservices
closing in 8 weeks

REKABENTUK MENGGUNAKAN BUILDING INFORMATION MODELLING (BIM), PENYEDIAAN DOKUMEN TENDER, ADDITIONAL PROFESSIONAL SERVICES (RSA STAGE 1-5, SI SUPERVISION & PAVEMENT EVALUATION SUPERVISION), PERINGKAT PEMBINAAN DAN PENGAWASAN TAPAK BAGI PROJEK MENAIK TARAF STRUKTUR JALAN UTAMA PALONG (FT044) DARI SEKSY

CAWANGAN JALAN JKR

SYARAT UTAMA PELAWAAN :1. BERDAFTAR DENGAN KEMENTERIAN KEWANGAN DAN BERDAFTAR DI BAWAH KOD 330101(KEJURUTERAAN AWAM), KOD 330102 (KEJURUTERAAN STRUKTUR) DAN MASIH BERKUATKUASA TEMPOH PENDAFTARANSEKURANG-KURANG 3 BULAN DARI TARIKH PELAWAAN2.BERDAFTAR DENGAN LEMBAGA JURUTERA MALAYSIA DAN TEMPOHPENDAFTARAN MASIH SAH SEMASA TARIKH TUTUP TENDER.3. MEMPUNYAI SIJIL PEMATUHAN CUKAI (TAX COMPLIANCECERTIFICATE - TCC) YANG MASIH SAH. PERUNDING BOLEH BUAT SEMAKAN DAN CETAKAN DI PORTAL MYTAXHTTPS://MYTAX.HASIL.GOV.MY Lawatan Tapak adalah WAJIB. Taklimat Tender dan Lawatan Tapak diadakan pada 11 JUN 2026 jam 10.00 Pagi. Penama Syarikat WAJIB hadir dan membawa Dokumen Asal dan Salinan Sijil MOF, Sijil BEM, Sijil SSM, Sijil Pendaftaran Kastam, Sijil Pematuhan Cukai LHDN (TCC), Salinan Emel Jemputan Taklimat Tender & Lawatan Tapak dan Cop Syarikat Bulat/Beralamat semasa pendaftaran. Lokasi Taklimat Tender akan dimaklumkan dalam emel Jemputan Taklimat Tender & Lawatan tapak

Estimated value
JKR/IP/CJ/T/2026/16
Norwayworks
closing in 6 days

Scenemaskineri Studioscenen

Dansens Hus AS

Anbudskonkurransen gjelder utskifting av det øvre scenemaskineriet på Studioscenen på Dansens hus i Oslo ifølge den Tekniske Spesifikasjonen. Det nåværende systemet nærmer seg slutten av sin levetid. I tillegg er systemet begrenset i funksjonalitet, mangler posisjonering og lastovervåking, og oppfyller ikke dagens sikkerhetskrav. Andre mål for oppgraderingen inkluderer: * Flere alternativer/punkter for oppheng. * Enklere endringer og kortere omstillingstid mellom produksjoner. * Bedre arbeidsmiljø. Det skal ikke være nødvendig å bruke lift for å flytte taljer eller opphengspunkter. * Muligheter for bevegelse under forestillinger. Prosjektet består av to deler: 1. Bygningsmessige arbeider bestående hovedsakelig av endringer til stålkonstruksjonen i taket samt flytting av bygningstekniske installasjoner. 2. Prosjektering, produksjon og installasjon av scenemaskineriet. Hver prosjektdel er en totalentreprise hvor totalentreprenøren har det fullstendige ansvaret for prosjektering, planlegging, produksjon, installasjon, test, trening og dokumentasjon. Denne konkurransen gjelder prosjektdel 2, levering av scenemaskineriet. Den planlagte løsningen baserer seg på et system med tradisjonelle scenetrekk med tillegg av punkttrekk. Det legges opp til 16 scenetrekk, 2 sidetrekk, og 4 baner for et variabelt antall punkttrekk. Trekkstengene bæres av fire stålwirer eller stålbånd. En stålkonstruksjon dedikert til scenemaskineriet vil bli installert av en annen entreprenør. De eksisterende HEA-bjelkene vil bli demontert. Åtte nye bjelker vil bli montert i hallens lengderetning, plassert slik at fire brukes til scenetrekk og fire til punkttrekk og/eller annet midlertidig utstyr. Maskineriet vil være plassert over balkongen på den ene siden av scenen. En skillevegg vil bli satt opp for å skape et maskinrom og skjerme for lyd mellom vinsjene og scenen. Hele systemet, inklusive trekkene og styringssystem med sikkerhetsfunksjoner, skal konstrueres i samsvar med normen NO-EN 17206 “Arrang

Estimated valueNOK 5.0m
2026-108899
Mauritaniaworks

Conception, fourniture, montage et Mise en service de la ligne 225 kV double terne entre Aleg et El Ghaira et le poste électrique 225/90/33 kV d’El Ghaira.

SOMELEC_BEST

REPUBLIQUE ISLAMIQUE DE MAURITANIE Honneur – Fraternité – Justice Ministère de l’Energie et du Pétrole Soci é t é Mauritanienne d’Electricite (SOMELEC Société mère) Avis Spécifique de Passation de Marché – Dossier de Sélection Initiale (DSI) Invitation à la Sélection Initiale Équipements (Conception, Fourniture, Montage, et Mise en Service) Maître d’Ouvrage : Société Mauritanienne d’Électricité (société mère) Projet : West Africa Regional Electricity Market Project (WA-REMP) Titre du Marché : Conception, fourniture, montage et Mise en service de la ligne 225 kV double terne entre Aleg et El Ghaira et le poste électrique 225/90/33 kV d’El Ghaira. Pays : République Islamique de Mauritanie N° de prêt : CREDIT NUMBER 7696-MR Numéro de DSI : N°01-CMI-2026 Émis le : 25 /02/2026 Le Gouvernement de la République Islamique de Mauritanie a reçu un financement de la Banque mondiale pour le coût du projet West Africa Régional Electricity Market Project (WA-REMP), et a l’intention d’utiliser une partie de ce financement pour effectuer des paiements au titre du Marché relatif à la Conception, fourniture, montage et Mise en service de la ligne 225 kV double terne entre Aleg et El Ghaira et le poste électrique 225/90/33 kV d’El Ghaira. La Société Mauritanienne d’Électricité (société mère) a l’intention de sélectionner initialement les Candidats pour la Conception, fourniture, montage et Mise en service de la ligne 225 kV double terne entre Aleg et El Ghaira et le poste électrique 225/90/33 kV d’El Ghaira. La Sélection Initiale sera effectuée selon les procédures spécifiées dans le Règlement de Passation des Marchés de la Banque mondiale pour les Emprunteurs de FPI (Septembre 2023) , et est ouverte à tous les Candidats éligibles tels que définis dans le Règlement de Passation des Marchés. Les Candidats éligibles intéressés peuvent obtenir de plus amples informations auprès la Société Mauritanienne d’Électricité (Société mère ) à l’adresse ci-dessous pendant les jours ouvrables de 9h

Estimated value
OP00429042
Brazilworks
closing in 3 weeks

Estudos, Projetos Básicos e Executivos, e Obras para implantação de Terminal de Integração para o BRT Amazonas, contemplando a implantação de terminal de integração com intervenções e obras de arte especiais para o sistema viário.

Secretariat of Works and Infrastructure of the Municipality of Belo Horizonte

ATO ADMINISTRATIVO: AVISO DE SELEÇÃO INICIAL OBRAS (Design e Construção) Edição: 7482 | 1ª Edição | Ano XXXII | Publicada em: 17/04/2026 SMOBI - Secretaria Municipal de Obras e Infraestrutura AVISO DE SELEÇÃO INICIAL OBRAS (Design e Construção) BRASIL BELO HORIZONTE - MG PROGRAMA DE MOBILIDADE E INCLUSÃO URBANA DE BELO HORIZONTE ACORDO DE EMPRÉSTIMO - LOAN 9069-BR O Município de Belo Horizonte, representado pela Secretaria Municipal de Obras e Infraestrutura – SMOBI, negociou um Acordo de Empréstimo, IBRD 9069-BR com o Banco Interacional para Reconstrução e Desenvolvimento (BIRD), Banco Mundial, no montante de US$ 80 milhões, para financiar parte do Programa de Mobilidade e Inclusão Urbana de Belo Horizonte, que monta US$ 100 milhões, que tem, portanto, US$ 20 milhões de contrapartida e vai utilizar parte desse empréstimo para contratação dos Estudos, Programas, Planos, Projetos, Construção e Serviços de Engenharia para a Implantação de Terminal de Integração para o BRT Amazonas e Sistema Viário do Entorno. A Secretaria Municipal de Obras e Infraestrutura - SMOBI, agência de implementação do Programa, vai realizar a Seleção Inicial de Candidatos para elaboração de Estudos, Projetos, Obras e Serviços de Engenharia para a Implantação de Terminal de Integração para o BRT Amazonas e Sistema Viário do Entorno. A Seleção Inicial, primeira etapa desta contratação, será organizada conforme os procedimentos especificados no “Regulamento de Aquisições para Mutuários de Operações de Financiamento de Projetos de Investimento - Aquisições em Operações de Financiamento de Projetos de Investimento - Bens, Obras, Serviços Técnicos e Serviços de Consultoria, datado de julho de 2016 e revisado em agosto de 2018, março e setembro de 2025, e é franqueada a todos os Candidatos elegíveis conforme definido no Regulamento de Aquisições. Na etapa de Seleção Inicial, o julgamento dos requisitos mínimos tem como resultado sua aprovação/reprovação com base em critérios como elegibilidade, expe

Estimated value
OP00442325
Ethiopia

Ethiopia Program for Results (Hybrid) for Strengthening Primary Health Care Services.

Ministry of Health

GENERAL PROCUREMENT NOTICE Country: Ethiopia Project : Ethiopia Program for Results for Strengthening Primary Health Care Services Sector: Health Sector GENERAL PROCUREMENT NOTICE Loan No./Credit No./TF No./Grant No. E1210 Project ID No. P175167 The Federal Democratic Republic of Ethiopia has received financing in the amount of US$ 447 million equivalent from the World Bank toward the cost of the Ethiopia Program for Results for Strengthening Primary Health Care Services, out of which US$ 129 million is financed through IPF and it intends to apply part of the proceeds of the IPF part to payments for goods, works, non-consulting services and consulting services to be procured under this project. The project IPF component includes the following sub-components IPF Sub-component I: Provision of EHS Focusing on RMNCAH+N to Conflict-Affected population and IDPs (US$89 million IDA equivalent) IPF Sub-component II: Civil Registration and Vital Statistics43 (US$30 million IDA equivalent) Under the IPF component the following will be procured through open international competitive procurement 1. Procurement of Vital Sign Monitoring, Oxygen Delivery, Diagnostic and Hospital Equipment ($6,1 or equivalent) 2. Procurement of Furniture, Weighing Scales, Surgical Instruments, Operating Room, Laboratory, Sterilization, Imaging, and Related Equipment (estimated at USD 23.5 million or equivalent) 3. Procurement of Vital Sign Monitoring, Oxygen Delivery, Diagnostic, and Hospital Equipment (estimated at USD 6.1 million or equivalent) 4. Supply and Installation of data center and Procurement of IT equipment for ICS head quarter (estimated at USD 9.5 million) 5. Procurement of CRVS registration KI (estimated at USD 9.45 million) Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers (September 2025 ) (Procurement Regulations) , and is open to all eligible firms and individuals

Estimated value
OP00440918
Türkiye

Istanbul North Rail Crossing Project

Ministry of Transport and Infrastructure - Directorate General of Infrastructure Investments

ADVANCE PROCUREMENT NOTICE “ Supplementary information on the Works procurement packages under the INRAIL Project, Türkiye, in follow-up to the GPN published on February 13, 2026. ” Türkiye: Design and Construction of Infrastructure & Superstructure Works including Electrification under the Istanbul North Rail Crossing (INRAIL) Project Purpose: To inform the bidder community of the upcoming large Procurement of Design and Construction of Infrastructure & Superstructure Works including Electrification that will be tendered shortly under the Istanbul North Rail Crossing Project. Country: Türkiye Borrower: Republic of Türkiye , Ministry of Treasury and Finance Project: İstanbul North Rail Crossing Project (INRAIL - P509952) Implementing Agency/ Employer : Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments Title of the Upcoming Procurement: Design and Construction of Infrastructure & Superstructure Works including Electrification under the INRAIL Project Brief Description of INRAIL Project: The Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments, Türkiye, has received financing from the World Bank through Ministry of Treasury and Finance towards the cost of the INRAIL Project. It is expected that the Project will be jointly co-financed by the Asian Infrastructure Investment Bank, the Asian Development Bank, the European Bank for Reconstruction and Development, the Islamic Development Bank, and the OPEC Fund for International Development. The Project will finance the construction of a 127 km greenfield railway line designed to bypass the Istanbul Metropolitan Area and establish a high-capacity overland link across the Istanbul Strait (Bosphorus). The line will be double-tracked, electrified, fully signalized, and mixed-use, capable of carrying both passengers and freight, with a maximum freight carrying capacity of 50 million tons per year. The proposed railway line will originate at Çayırov

Estimated value
OP00426792
Uganda

Uganda Development Response to Displacement Impacts Project Phase II

Office of the Prime Minister

THE REPUBLIC OF UGANDA OFFICE OF THE PRIME MINISTER PLOT 9-11 APOLLO KAGGWA ROAD. P.O. BOX 341, KAMPALA, UGANDA TELEPHONES: General Line 0417 770500, Web: www.opm.go.ug , E-mail: ps@opm.go.ug GENERAL PROCUREMENT NOTICE UGANDA Development Response to Displacement Impacts Project Phase II (DRDIP-II) Credit No.: 7778-UG | Grant No.: E4420-UG Project ID: P510476 The Government of the Republic of Uganda has received financing in the amount of US$328 million equivalent from the International Development Association (IDA) toward the cost of the Development Response to Displacement Impacts Project Phase II (DRDIP-II). The Government intends to apply part of the proceeds to payments for goods, works, non-consulting services, and consulting services to be procured under this project. The project comprises the following components: Component 1: Social and Economic Services and Infrastructure This component will support the construction, rehabilitation, upgrading, and maintenance of priority basic service infrastructure. Investments will benefit both refugees and host communities and support the transition roadmap for integration into national education, health, and water supply systems. Component 2: Integrated Natural Resource Management This component will finance interventions aimed at environmental restoration and protection to address ecosystem degradation in Refugee Hosting Districts (RHDs), exacerbated by climate change and increased pressure from refugee and host community activities, including deforestation. Component 3: Economic Opportunity This component will enhance economic opportunities in priority value chains and strengthen production and market participation among refugees and host communities. It aligns with Government priorities under the National Development Plan IV (NDP IV), focusing on agri-business development, value addition, entrepreneurship, and increased household incomes. Component 4: Project Management, Accountability Systems, and Coordination This

Estimated value
OP00438671
Syria

Syria Public Financial Management Capacity Strengthening Project

Ministry of Finance

GENERAL PROCUREMENT NOTICE Syrian Arab Republic Syria Public Financial Management Capacity Strengthening Project Project ID No. P512516 The Syrian Arab Republic has received financing in the amount of US$ 20 million equivalent from the World Bank toward the cost of the Syria Public Financial Management Capacity Strengthening Project, and it intends to apply part of the proceeds to payments for goods, non-consulting services and consulting services to be procured under this project. This project will be financed by the International Development Association (IDA). The project will include the following components: Component 1: Public Financial Management Reform Oversight (US$2 million). Establishes reform oversight structures within the Ministry of Finance, including the PFM Reform Coordinating Unit (PFMRCU) and the Syria External Assistance Fiduciary Section (SEAFS), to coordinate reforms and strengthen fiduciary functions for externally financed projects. The following procurement packages are envisaged under this component with Open/International Market Approach: Procurement Activity Category Market Approach Procurement Method Date of Specific Procurement Notice Information Systems Procurement Specialist with WB-funded project experience Consulting Services (Individual) Open - International Selection of Individual Consultants May-2026 Financial Management Specialist TA to SEAFS Consulting Services (Individual) Open - International Selection of Individual Consultants May-2026 Internal Audit Expert TA to SEAFS Consulting Services (Individual) Open - International Selection of Individual Consultants May-2026 Procurement Specialist TA to SEAFS Consulting Services (Individual) Open - International Selection of Individual Consultants May-2026 Component 2: Improving Efficiency of Essential PFM and Procurement Functions (US$10 million). Supports PFM professionalization, modernization of the public procurement system, and flexible just-in-time technical assistance to addres

Estimated value
OP00441097
Kyrgyzstan

Primary Health Care Quality Improvement Program

Ministry of Health of KR

GENERAL PROCUREMENT NOTICE Country: Kyrgyz Republic Name of project: Primary health care quality improvement operation (PHCQIO) Additional financing Sector: Ministry of Health of the Kyrgyz Republic GENERAL PROCUREMENT NOTICE Grant No. GRANTS PHCQIO №TF C7573, №TF C7574 Project ID No. P167598 The Kyrgyz Republic has received financing in the amount of 11 450 000 US$ equivalent from the World Bank toward the cost of the Primary health care quality improvement operation (PHCQIO) Additional financing (AF), and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this AF. This operation is jointly financed - as part of its Financial Cooperation with the Kyrgyz Republic, Germany supports the implementation of a multilateral donor-funded Program for Results as part of the 2019-2030 State Health Development Program by providing co-financing for the World Bank-supported Primary Health Care Quality Improvement Operation. The Operation is financed by Joint Financiers: the German Development Bank (KfW), the Swiss Agency for Development and Cooperation (SDC), and the International Development Association (IDA). The operation includes the following components: Component 1: The PforR component (Program) includes all the results areas/activities and disbursement linked indicators (DLIs) that previously constituted the PHCQIO, as amended as part of the March 2025 restructuring. Component 2: Investment component (Project) includes all activities to be financed by the AF approved in March 2025. Component 2 consists of two sub-components. Sub-component 2.1 (goods, non-consulting services, operating costs), which is financed by new funding from the PHCQIO Multi-Donor Trust Fund (MDTF) in the amount of US$ 9.05 million, while sub-component 2.2 (TA) is financed from the Single-Donor Trust Fund (SDTF)in the amount of US$ 2.40 million. Procurement of contracts financed by the World Bank will be conducted

Estimated value
OP00440492
Cambodia

Cambodia Regional Connectivity Improvement Project Phase 1

Ministry of Public Works and Transport (CRCI PMU)

Kingdom of Cambodia Nation Religion King Ministry of Public Works and Transport GENERAL PROCUREMENT NOTICE Country : Kingdom of Cambodia Project Name : Cambodia Regional Connectivity Improvement Project Phase 1 (CRCIP) Project ID No. : P510547 Project Implementing Agency : Ministry of Public Works and Transport (MPWT); The Ministry of Public Works and Transport (MPWT) of the Royal Government of Cambodia (RGC) has applied for financing support from the World Bank's (WB) International Development Association (IDA) to implement the CRCIP Phase 1 of Multiphase Programmatic Approach (MPA) with an implementation period of eight years starting in 2026. The CRCIP will support inclusive growth and job creation in Cambodia through targeted investments in regional road infrastructure and the enhancement of institutional capacity in logistics and trade facilitation. The Project Development Objective is to improve resilient transport connectivity along selected sections of the Asian Highway 21 regional corridor and increase national logistics management capacity. MPWT is responsible for overall project implementation, technical supervision, execution, and management of the Project. The Project Director and Project Manager will be responsible for the day-to-day implementation, supervision, and operation of the CRCIP, including contract administration of works, services, and supply of goods. Ministry of Commerce (MOC) is the lead technical partner for project activities related to trade facilitation. The CRCI project will include the following components: Component 1: Road Corridor Improvement, including: Sub-component 1.1: Climate-resilient Road Corridor Improvement and Maintenance: will finance the improvement of the condition, climate resilience, road safety, and maintenance of approximately 247 km of the AH21 road corridor sections of National Roads 64 (NR64), NR62, and NR9 in Cambodia. These road sections will be improved with resilient designs, within the agreed Corridor of

Estimated value
OP00440360
Uzbekistan

Uzbekistan Gas Leak Repair Facility

Uztransgaz

GENERAL PROCUREMENT NOTICE Uzbekistan Uzbekistan Gas Leak Repair Facility Project Gas transportation sector GENERAL PROCUREMENT NOTICE Grant No. D0734 Project ID No. P508941 Uztransgaz JSC has received financing in the amount of 10.6 million US$ equivalent from the World Bank toward the cost of the Uzbekistan Gas Leak Repair Facility Project, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. This project will be financed by the International Bank for Reconstruction and Development/International Development Association (“Bank”), acting as an administrator of Global Flaring and Methane Reduction Partnership Multi-Donor Trust Fund. The project will include the following components: Component A: Repairs of gas loss reduction from legacy gas infrastructure The project activities will include repair work at gas stations of the transmission network, and the purchase and installation of methane emission metering equipment, valve fittings (ball valves, gaskets), and consumables (e.g. welding electrodes, pipe sections, propane and diesel fuel, etc.) as well as contract services for the leak repair program and digital solutions. Component B: Capacity building of UTG to carry out monitoring and reporting of gas losses and emissions reductions This component will consist in capacity building of UTG to carry out measuring, monitoring and reporting of methane emissions in line with international standards and best practices in the oil and gas industry, in particular the Oil and Gas Methane Partnership (OGMP) 2.0 Gold standard. Component C: Establishment of the Facility and project implementation support The following activities are expected to be procured under the project through international competitive procurement and selection procedures: Supply of equipment to identify, measure and monitor gas losses and associated methane emissions. Supply of shut-off valves and spare

Estimated value
OP00435557
Uganda

Northern Uganda Social Action Fund IV Project

Office of the Prime Minister

THE REPUBLIC OF UGANDA OFFICE OF THE PRIME MINISTER PLOT 9-11 APOLLO KAGGWA ROAD. P.O. BOX 341, KAMPALA, UGANDA TELEPHONES: General Line 0417 770500, Web: www.opm.go.ug , E-mail: ps@opm.go.ug GENERAL PROCUREMENT NOTICE UGANDA Northern Uganda Social Action Fund IV (NUSAF-IV) Credit No .: 77340 -UG Project ID : P179904 The Government of the Republic of Uganda has received financing in the amount of US$276 million equivalent from the International Development Association (IDA) toward the cost of the Northern Uganda Social Action Fund IV (NUSAF-IV). The Government intends to apply part of the proceeds to payments for goods, works, non-consulting services, and consulting services to be procured under this project. The project comprises the following components: Component 1: Sustainable Livelihoods Enhancement The objective of this component is to enhance economic opportunities and productivity of poor households. It will target 240,000 beneficiaries (covering one million people across beneficiary households). It will consist of two subcomponents, both of which will (a) utilize private sector technical partners to support implementation and (b) maximize the participation of women and youth through proactive engagement, gender-sensitive training, and tailored communication for these target beneficiaries. Component 2: Enhanced Resilience and Human Capital Development This component aims to strengthen resilience and human capital for about 418,000 poor and vulnerable households (1.8 million people) through integrated safety nets. It provides climate-smart Labor-Intensive Public Works (LIPW), direct income support for labour-constrained households, and nutrition-sensitive cash-plus interventions. The program builds community assets and promotes climate adaptation measures such as reforestation, water storage, and flood/drought risk reduction. It enhances health and nutrition outcomes for mothers and young children through targeted cash transfers, behaviour change communicatio

Estimated value
OP00440818
Botswana

GFPP Botswana Health Emergency Preparedness, Response and Resilience Project Using the Multi-Phase P

GFPP Botswana Health Emergency Preparedness, Response and Resilience Project Using the Multi-Phase P

GENERAL PROCUREMENT NOTICE BOTSWANA BOTSWANA HEALTH EMERGENCY PREPAREDNESS, RESPONSE, and RESILIENCE PROJECT (GFPP) HEALTH, NUTRITION & POPULATION GENERAL PROCUREMENT NOTICE Grant No. TF0C9652 Project ID No. P181952 The Ministry of Health has received financing in the amount of US$3 million equivalent from the World Bank toward the cost of the GFPP Botswana Health Emergency Preparedness, Response and Resilience Project Using the Multi-Phase Programmatic Approach , and it intends to apply part of the proceeds to payments for goods, non-consulting services and consulting services to be procured under this project. The project will include the following components: Component 1 : Strengthening Health System Preparedness and Resilience-(US$34.4 million: US$34.1 million IBRD; US$0.3 million LPF1) Component 2 : Improving Detection of and Response to Health Emergencies- (US$5million: US$2.3 million IBRD; US$2.7 million LPF1) Procurement of contracts financed by the World Bank will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers (Seventh Edition, dated September 2025) , and is open to all eligible firms and individuals as defined in the Procurement Regulations . After project negotiations, the World Bank shall arrange the publication on its external website of the agreed initial procurement plan and all subsequent updates once it has provided a no objection. Specific procurement notices for contracts subject to open international competitive procurement will be announced, as they become available, in World Bank’s external website, alongside the other publication channels already listed in the notice, namely the Ministry of Health Facebook Page, the Botswana Daily News, and official Gazette. Interested eligible firms and individuals who would wish to be considered for the provision of goods, non-consulting and consulting services for the above mentioned project, or those requiring additional information, should co

Estimated value
OP00443138
Mozambique

Transport Corridors for Economic Resilience Mozambique SOP 2 Project

Project Management Unit

GENERAL PROCUREMENT NOTICE Country: Republic of Mozambique Project: Transport Corridors for Economic Resilience Mozambique SOP 2 Project Practice Area: Transport Assignment Title: General Procurement Notice (GPN) Grant No: IDA-E4810 Project ID No : P510427 The Republic of Mozambique has received financing in the amount of United States Dollars, One Hundred Twenty-Three Million (US$ 123 Million Dollars) equivalent from the World Bank toward the cost of the Transport Corridors for Economic Resilience Mozambique SOP 2 Project , and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. The project will include the following components: Regional transport connectivity along the Nacala Corridor; Enhanced logistics and operational efficiency along the Nacala corridor; Project Management, Monitoring and Evaluation; The Contingent Emergency Response Component (CERC). Together, these components will strengthen the targeted corridors (Nacala and Beira) to be safer, competitive, complementary and climate resilient. Importantly, they will help to reduce trade and transport costs along the corridors. Enhance regional transport connectivity along the Nacala corridor : This component will finance civil works activities that improve the condition, climate resilience, and safety of the Nacala road corridor and its secondary network. The roads to be upgraded will improve connectivity to economic centers along the corridor and enable value-chain development, particularly in the agricultural sector. All interventions will be built to climate resilient standards and reflect road safety recommendations from the safety audits and iRAP assessments. Through targeted studies, pilot projects and localized civil works, the project will identify climate susceptibility and implement improvements that aim to reduce the occurrence of interruptions to transit along the Nacala corridor. Interruptions t

Estimated value
OP00429841
China

Green Urban Development Project

Guiyang Infrastructure Construction & Investment Group Co., Ltd.

GENERAL PROCUREMENT NOTICE Country: P.R. China Project Nam: Green Urban Development Project Practice Area: Environment, Natural Resources & the Blue Economy; Transport; Climate Change; Water Loan No./Credit No./TF No./Grant No.: 9844-CN Project ID No. : P506807 The People’s Republic of China has received financing in the amount of US$250,000,000 equivalent from the World Bank to reduce greenhouse gas emissions and enhance nature-positive urban development in Guiyang, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. The project will include the following components: Part 1: Low Carbon Urban Mobility for Enhanced Livability 1.1Accelerate Non-Motorized Transport(“NMT”) Network Development Increase connectivity of Aha Lake through the development of: (a) NMT investments in the Aha Lake Greenway, including construction of pathways around Aha Lake and connecting lines linking to city-wide green networks; (b) improved NMT connections to the nearby metro stations; and (c) energy-efficient amenities and basic utility and telecommunications and information services networks in the Aha Lake area. 1.2Enhance Public Transit Solutions and Modal Share Enhance public transit system through: (a) upgrading and rehabilitating roads for new bus lines and related infrastructure; (b) introducing public transport infrastructure upgrades, road traffic improvements, and service enhancements in public transport frequency, speed, and route optimization; and (c) introducing bus lines to provide last-mile connections from metro stations. 1.3Enhance Travel Efficiency and User Experience Improve Guiyang urban transport system through: (a) construction/upgrade of connections around Aha Lake to key city thoroughfares to provide direct access to the Aha Lake area; (b) construction of parking areas and reorganization of existing parking around Aha Lake; (c) installation of electric vehicle cha

Estimated value
OP00432139
United States

Building Institutions And Systems to Harness And Realize Agenda 2063 Project

Africa Union Commission

African Union Commission, Addis Ababa, Ethiopia. Roosevelt Street, P. O. Box 3243, Email tender@africanunion.org, Website: https://au.int/ GENERAL PROCUREMENT NOTICE Project ID No. P180117 The African Union has received financing in the amount of US$ 50 Million equivalent from the World Bank toward the cost of the Building Institutions and Systems to Harness and Realize Agenda (BIASHARA) 2063 Project , and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. The project includes the following components Component 1: Improved effectiveness of the AUC management functions (USD 19.0) Component 2: Improved capacity for implementation of commitments to enhance intracontinental trade (US$ 25.0 million) Component 3: Project Implementation, Results Based Management, and Stakeholder Engagement (US$ 6.0 million) The Project procurement activities will include: Procurement Category Description Estimated Cost (USD) Procurement Selection Approach/ Competition Consulting Services Consulting Services for Revision and Harmonization of the Standard Operating Procedures (SOP)and Manuals for the Financial, IT and Performance Divisions 100,000.00 QCBS /Open International Hire an individual consultant for a Continental Study on the State of Performance of Public Service delivery in Africa 100,000.00 IC /Open International SAP S4 HANA New Finance Modules - SAP Grant Management, Budget planning, Project Systems, Travel Planning / DSA Module + Training 1,000,000.00 QCBS /Open International Consulting Services for Revision and Harmonization of the Standard Operating Procedures (SOP) for the Investigation Division 55,000.00 QCBS /Open International Institutionalize the Results Based Budget and Multiyear Planning and Budgeting process 72,000.00 QCBS /Open International Goods and Non Consultancy Service Build Disaster Recovery Data Center 149,130.43 RFB/ Open International Procure IT Equipment

Estimated value
OP00444131
Georgia

Georgia Resilient Agriculture, Irrigation, and Land Project

Ministry of Environmental Protection and Agriculture of Georgia

GENERAL PROCUREMENT NOTICE Georgia GEORGIA RESILIENT AGRICULTURE, IRRIGATION, AND LAND PROJECT GENERAL PROCUREMENT NOTICE Loan No./Credit No./TF No./Grant No. 95040-GE Project ID No. P175629 The Government of Georgia has received financing in the amount of US$ 75 mln equivalent from the World Bank toward the cost of the Georgia Resilient Agriculture, Irrigation and Land Project , and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. This project will be jointly financed by the Government of Georgia. The project will include the following components: Component 1: Resilient Irrigated Agriculture Subcomponent 1.1: Irrigation & Drainage Infrastructure Rehabilitation and Modernization; Subcomponent 1.2: Irrigated agriculture and value chain development; Subcomponent 1.3: Improved Performance of Irrigation Service Delivery Component 2: Improvement of Land Management Capacity Subcomponent 2.1: Strengthening of agricultural land management and monitoring; Subcomponent 2.2: Enhancement of the land administration service delivery and building digital governance infrastructure Component 3: Project Management This component will finance two Project Implementation Units that will be responsible for project management: One Project Implementing Unit (PIU) is established within MEPA, which is responsible for the management of Component 1 and Subcomponent 2.1. The second PIU is established within the NAPR, which is the Project Implementing Entity, and will be responsible for the implementation of Subcomponents 2.2 and 3.2. Civil works contracts will include a variety of works, including Rehabilitation of Irrigation and Drainage Systems for 7 schemes. Procurement of goods will include Remote sensing monitoring equipment, Ground monitoring hardware, IT Hardware, and Software. Procurement of consulting services will include the following: Design & supervision of pre-identified scheme

Estimated value
OP00242072
United States

Regional Climate Resilience Program for Eastern and Southern Africa 1 Project (RCRP1)

Eastern Nile Technical Regional Office (ENTRO)

GENERAL PROCUREMENT NOTICE Country: Mozambique Project: Regional Climate Resilience Program for Eastern and Southern Africa – Phase 1. Credit /Grant No .: IDA-E1950 Project ID No .: P180171 The Recipients have received financing in the amount of (i) The Republic of Madagascar US$ 28 million, (ii) The Union of Comoros US$ 4 million, (iii) The Republic of Mozambique US$ 125 million , (iv) The Republic of South Sudan US$ 215 million (v) The Southern Africa Development Community (SADC) US$ 5 million, and the Eastern Nile Technical Regional Office (ENTRO) US$ 4 million equivalent from the World Bank toward the cost of the Regional Climate Resilience Program for Eastern and Southern Africa-Phase 1, and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this project. The project will include the following components: Component 1: Risk Management and Climate Financing (US$26 million equivalent, including US$5.5 million National IDA, US$13.5 million Regional IDA, US$6 million Crisis Response Window, CRW, and US$1 million IDA Window for Host Communities and Refugees, WHR). The objective of this component is to build regional and national institutional capacity and strengthen cooperation on climate and disasters risk management and climate financing. This component is aligned primarily with the GCRF’s pillar 2 Protecting People and Preserving Jobs, as it focuses on addressing the immediate and medium-term impact of climate crises. Component 2. Infrastructure Investments and Sustainable Asset Management for Climate Resilience (US$316.4 million equivalent, including US$51 million National IDA, US$103.4 million Regional IDA, US$144 million CRW, and US$18 million WHR) . This component aims at improving management of water resources and water-related climate impacts in AFE requires closing the regional gap on critical water infrastructure for climate resilience, as well as a strong institutiona

Estimated value
OP00444663
Burkina Faso

Restoring Education System Performance and Improving Resilience Project

Restoring Education System Performance and Improving Resilience Project

AVIS GENERAL DE PASSATION DES MARCHES Secteu r : Education Accords de Crédit : Crédit IDA N° 7782-BF (PBA)du 05 mai 2025 ; Crédit IDA N°7781-BF (PBA-SML) du 05 mai 2025 ; Crédit IDA N°7783-BF (WHR) du 05 mai 2025 ; Don IDA N°E4430-BF (WHR) du 05 mai 2025. TF N° C9797 du 05 mai 2025 ID du projet : P502472 Date de mise en vigueur : 24 mars 2026 1 . Le Gouvernement du Burkina Faso a obtenu de l’Association Internationale pour le Développement (IDA) un crédit de 203.10 millions de dollars US pour le financement du Projet de Renforcement de la Performance du Système éducatif et d’Amélioration de la Résilience (REPAIR) et a l’intention d’utiliser une partie de ce crédit pour effectuer des paiements au titre des marchés relatifs à des travaux, des fournitures et services autres que services de consultant, et des services de consultants à acquérir dans le cadre de ce projet. Ce projet sera cofinancé par le Partenariat Mondial pour l’Education (GPE). L’objectif de développement du REPAIR est de contribuer à l’amélioration de l'accès et de la qualité de l'éducation au préscolaire, au primaire et au non formel. Le REPAIR comprend les composantes suivantes : - Composante 1 : Soutenir l’accès à des infrastructures éducatives sûres, modernes et résilientes ; - Composante 2 : Soutenir l'éducation en situation d'urgence et garantir l'inclusion ; - Composante 3 : Amélioration de l'apprentissage fondamental ; - Composante 4 : Renforcement des capacités institutionnelles et des systèmes. 2. Les marchés financés par la Banque Mondiale et le Partenariat Mondial pour l’Education (GPE) seront passés conformément au Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI) publié en 2016, version révisée de Septembre 2025 (7è Edition) et sont ouverts à tous les candidats éligibles tels que définis dans le Règlement de Passation des Marchés. Des passations de marchés faisant appel à la concurrence internationale sont envisagées pour

Estimated value
OP00444128
Gabon

Gabon Urban Development Project

COMMISSION NATIONALE DES TIPPEE

MINISTÈRE DE LA PLANIFICATION ET DE LA PROSPECTIVE COMMISSION NATIONALE DES TIPPEE SECRETARIAT PERMANENT Projet de Développement Urbain du Gabon (PDUG) Financement : BIRD ID : P177372 | Prêt N° : 9832-GA AVIS GÉNÉRAL DE PASSATION DES MARCHÉS Le Gouvernement de la République du Gabon a obtenu un Prêt de la Banque Internationale pour la Reconstruction et le Développement (BIRD) d’un montant de 150 000 000 dollars US, pour financer le Projet de Développement Urbain du Gabon (PDUG) et se propose d’utiliser une partie des fonds de ce Prêt pour régler des fournitures, travaux et services devant être acquis dans le cadre de ce Projet. La passation des marchés financés par la Banque sera régie par les procédures et les critères de provenance définis par la Banque mondiale. Le Projet comprend les composantes suivantes : Composante 1 : Développement urbain intégré dans les villes ciblées (équivalent de 90 millions de dollars de la BIRD) Cette composante finance des investissements dans des infrastructures et des services urbains résilients au climat, tout en fournissant une assistance technique ciblée et un soutien au renforcement des capacités aux administrations nationales et municipales. Composante 2 : Infrastructures de réduction des risques d'inondation (équivalent de 55 millions de dollars de la BIRD) La composante 2 financera des infrastructures de drainage des eaux pluviales et des mesures de réduction des risques d'inondation, y compris les infrastructures grises et les solutions fondées sur la nature. Composante 3 : Gestion, coordination, suivi et évaluation du projet (équivalent de 5 millions de dollars de la BIRD) La composante 3 financera les activités de gestion du projet conformément aux politiques et directives de la Banque. Composante 4 : Intervention d'urgence (équivalent BIRD de 0 million de dollars) Composante concerne l'intervention d'urgence conditionnelle (CERC). A la suite d’une crise ou d’une urgence admissible, le Bénéficiaire peut demander à la Banq

Estimated value
OP00445271
United Statesservices

Mise en œuvre de programme de formation lié au genre

Road Agency

Estimated value
OP00442212
United Statesservices

Communications Advisor for CBS

Federal Republic of Somalia, Ministry of Finance, Office of the Director General

Estimated value
OP00442154

Free tender alerts

Get a weekly digest of new tenders

New new tenders matching your interests, delivered to your inbox — no app required. Tell us your email and we'll start a weekly digest. Add keywords or a minimum value in the message and we'll filter to match.

Opens your mail app pre-addressed. We only use your email for the digest you requested.

Filtered tenders — DataMesh Consulting