Skip to main content

Public tenders

Tenders

Filtered to "Administrator, Barishal City Corporation". Adjust filters above to broaden or narrow the result set.

23 matching · page 1 of 1

Bangladeshworks
closing in 4 weeks

Construction of CC Road at- Sardarpara Branch Road By Lane.(part-01);Sardarpara Branch Road By Lane.(Part-01); Sardarpara Branch Road By Lane.(part-02); Sardarpara Branch Road By Lane.BCC.(Part-02);Sikderpara Khan Bari Road.; Sikderpara khan Bari;Sikderpara Link Road. Part-01); Sikderpara Link Road.

Administrator, Barishal City Corporation

W-60/ BCC-RDWMP Construction of CC Road at- Sardarpara Branch Road By Lane.(part-01);Sardarpara Branch Road By Lane.(Part-01); Sardarpara Branch Road By Lane.(part-02); Sardarpara Branch Road By Lane.BCC.(Part-02);Sikderpara Khan Bari Road.; Sikderpara khan Bari;Sikderpara Link Road. Part-01); Sikderpara Link Road.BCC.(Part-02); Howlader Bari Mosque Sarak.(Part-02); Sikderpara Link Road.BCC.(Part-03);Sikderpara & Khan Sarak Connective Link Road.BCC.(Part-01); Sikderpara & Khan Sarak Connective Link Road.BCC.(Part-02); Khan Sarak Link Road; Rakhal Babu Bari Sarak; Tiakhali Sarak up to Khan Mongil.Link Road; Tiakhali Sarak up to Nasir Hossen Bari; Gharami Bari Pole up-to Thakur Bari Pole By Lane Amol Chandra Halder Bari Road; South Sagordi Abdul Sobahan Howlader Bari Link Road.BCC.(Part-01); South Sagordi Abdul Sobahan Howlader Bari Link Road Part-02; South Sagordi Sarak up-to Jaynal Howlader Bari Road; South Sagordi Darga Bari Sarak Babor Lane; Isakha Sarak By Lane.BCC.(Part-02); Isakha Sarak By Lane Part-03; Isakha Sarak By Lane.BCC.(Part-01); Sahid Titumir Lane By Lane-03; Sagordi Bazar Darga Bari Sarak; Muktijoddha Abdul Malek Sarak.By Lane; Yaqub Ali Sarak up-to Sarder Bari; Yaqub Ali Sarak By Lane-02; Gabtola Sarak By Lane; Gabtola Road up-to Darul Al-Karim Keratul Madrasha Road; Ahamad Mollah Sarak uo-to Rahim Koral House RCC Drain at- Sikderpara & Khan Sarak Connective Link Road; Rakhal Babu Bari Sarak; Isakha Sarak By Lane.(Part-01); Yaqub Ali Sarak up-to Sarder Bari; Sahid Titumir Lane By Lane-03; Gabtola Road up-to Darul Al-Karim Keratul Madrasha Road; Sikderpara Link Road.BCC.(Part-01); ;Howlader Bari Mosque Sarak.BCC.(Part-02); Yaqub Ali Sarak By Lane-02 NB: Due to Restriction of total character length in package name in egp system please find detail name of package in annexure. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil

Estimated value
1271155
Bangladeshworks
closing in 4 weeks

RCC Drain At Ichakati Main Road ,near MR, Likhon Howlader`s house; Gafur Talukdar Bari; At Branch Road Connecting From Muktijoddha Mozzafar Ali Road toNorth side Chhohota School;C & B Road up to Amjed Ali`s House; Adjacent South side of Khaja Moinuddin Madrasa, Bazar Roadl;Sagar Goli Link Road; Eart

Administrator, Barishal City Corporation

W-54/ BCC-RDWMP RCC Drain At Ichakati Main Road ,near MR, Likhon Howlader`s house; Gafur Talukdar Bari; At Branch Road Connecting From Muktijoddha Mozzafar Ali Road toNorth side Chhohota School;C & B Road up to Amjed Ali`s House; Adjacent South side of Khaja Moinuddin Madrasa, Bazar Roadl;Sagar Goli Link Road; Earthed Road towards north side road behind the Eduction Boardi;Shah Poran Road up to Bagia Fieldi; Construction of CC Road At- Khan Bari Road adjacent to ichakati Main Road;Lutfur Rahman Road to Janab Zaman Mia`s House; Mira Bari Road adjacent to Nabajagoroni School; Dr.Nurul Islam Road; Abul Hossain Road;Kazi Bari Road;Nizam Uddin Road;Eshak Majhi Bari Road; Abdul Hai Laskar Bari Road;At Ayyub Palowan Bari Road; Limon Mia`s Bari Road; South Side of Women Legal Aid Program office; Haji Abdul Mannan Akon Bari;South Side of Rabbi Filling Station; Muktijoddha Rahmat Ali Branch Road (2nd Part); Ali Azim Khan Bari Road; Rubel Howlader Bari;Kashem Howlader Bari Road; Chowkidar Bari Road; Motaleb Howlader Bari Road;Aftab Uddin Howlader Bari Road; Nazir Hossain House Road;Babul Howlader Bari Road; Afez Howlader house Road;Babul Howlader By Lane Road;Gafur Talukdar Bari;Mallik Bari; Imam Kazi Bari Road,Branch Road , South of Chhotha Primary School; Branch Road Connecting From Muktijoddha Mozzafar Ali Road toNorth side Chhohota School;Muktijoddha Mozzafar Ali Road North side Anis Mia`s House; Bogar Bari to Robi Tagore`s house;Bogar Bari to Housing area (south side);South side of Siraj Master`s Housing;Bir Muktijoddha Muzaffar Ali Road North side Mollabari; Bir Muktijoddha Muzaffar Ali Road North side Abdul Jabbar Howlader`s House; Bir Muktijoddha Muzaffar Ali Road North side Monsur Mia`s House; Bir Muktijoddha Muzaffar Ali Road South side Earthen Road;Earthen road from C & B Road to pora bari; and ���.. NB: Due to Restriction of total character length in package name in egp system please find detail name of package in annexure. Construction work;Site preparation

Estimated value
1271144
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-25-R-KT(a)-003)Construction of RCC Road at Karikar Biri Branch Road (from Karikar Biri Branch to New Housing), Under Ward no- 025 ,BCC, Barishal. (2) (BCC-W-25-R-KT(a)-036)Construction of RCC Road at Hawlader Road North side of Palli Bidyut Mosque, Under Ward no- 025 ,BCC, Barishal. (3) (

Administrator, Barishal City Corporation

W-45/ BCC-RDWMP (1) (BCC-W-25-R-KT(a)-003)Construction of RCC Road at Karikar Biri Branch Road (from Karikar Biri Branch to New Housing), Under Ward no- 025 ,BCC, Barishal. (2) (BCC-W-25-R-KT(a)-036)Construction of RCC Road at Hawlader Road North side of Palli Bidyut Mosque, Under Ward no- 025 ,BCC, Barishal. (3) (BCC-W-25-R-BC(a)-037)Construction of RCC Road at M A Khalek Road (from Barishal-Patuakhali Road to Ukil Bari Road), Under Ward no- 025 ,BCC, Barishal. (4) (BCC-W-25-R-ER(a)-042)Construction of RCC Road at Napitbari Road via Haji Pump to Khalpar Road, Under Ward no- 025 ,BCC, Barishal. (5) (BCC-W-25-R-ER(a)-050)Construction of RCC Road at Sugandha Housing Road (from Barishal - Jhalokathi Road to Housing Area), Under Ward no- 025 ,BCC, Barishal. (6) (BCC-W-25-R-ER(a)-056)Construction of RCC Road at Arafat Housing Road (from Barishal - Jhalokathi Road to Chowkidar Bari), Under Ward no- 025 ,BCC, Barishal. (7) (BCC-W-25-R-RCC(A)-110)Construction of RCC Road at Shikdar Para Road (from Kalijira Bazar to C & B Road, Jhalokathi Road), Under Ward no- 025 ,BCC, Barishal. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other buil

Estimated value
1270380
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-26-ER(A)-003)Construction of CC Road at Gayan Bare Road W-26 (2) (BCC-W-26-ER(A)-018)Construction of CC Road at peershaheb Bare Road W-26 (3) (BCC-W-26-ER(A)-019)Construction of CC Road at Sofik Bare Road W-26 (4) (BCC-W-26-ER(A)-024)Construction of CC Road at Mollik Bare to Maze Road W-2

Administrator, Barishal City Corporation

W-57/ BCC-RDWMP (1) (BCC-W-26-ER(A)-003)Construction of CC Road at Gayan Bare Road W-26 (2) (BCC-W-26-ER(A)-018)Construction of CC Road at peershaheb Bare Road W-26 (3) (BCC-W-26-ER(A)-019)Construction of CC Road at Sofik Bare Road W-26 (4) (BCC-W-26-ER(A)-024)Construction of CC Road at Mollik Bare to Maze Road W-26 (5) (BCC-W-26-ER(A)-028)Construction of CC Road at Mozid khan Bare Road W-26 (6) (BCC-W-26-ER(A)-031)Construction of CC Road at Dollil Bare Road W-26 (7) (BCC-W-26-ER(A)-036)Construction of CC Road at Burir Bare Road W-26 (8) (BCC-W-26-ER(A)-054)Construction of CC Road at Azhar Howlader Bare Road W-26 (9) (BCC-W-26-ER(A)-044)Construction of CC Road at Tota Master Bare Road W-26 (10) (BCC-W-26-ER(A)-050)Construction of CC Road at Foraji Bare Road W-26 (11) (BCC-W-26-ER(A)-055)Construction of CC Road at Hashim Howlader Bare Road W-26 (12) (BCC-W-26-ER(A)-012)Construction of CC Road at Dulal Khan Bare Road W-26 (13) (BCC-W-26-ER(A)-022)Construction of CC Road at Harun police Bare Road W-26 Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery

Estimated value
1270366
Bangladeshworks
closing in 4 weeks

(1) (BCC-25-Y-HB(C)-57)-Construction of RCC Yeard at Rupatoli Bustarminal Chattor.BCC. (2) (BCC-09-R-RCC-027-Construction of RCC Town Hall Chattor.BCC.

Administrator, Barishal City Corporation

W-47/BCC-RDWMP (1) (BCC-25-Y-HB(C)-57)-Construction of RCC Yeard at Rupatoli Bustarminal Chattor.BCC. (2) (BCC-09-R-RCC-027-Construction of RCC Town Hall Chattor.BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1270356
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-06-R-CC-B-033)Construction of RCC Road at Daftarkhana Puran Koylaghat School Road, Under Ward no- 06 ,BCC, Barishal. (2) (BCC-W-06-D-RCC-B-076) Construction of RCC Drain at Daftarkhana Puran Koylaghat School Road, under Ward no-06,BCC,Barishal. (3) (BCC-W-06-R-RCC-C-022)Construction of RC

Administrator, Barishal City Corporation

W-41/ BCC-RDWMP (1) (BCC-W-06-R-CC-B-033)Construction of RCC Road at Daftarkhana Puran Koylaghat School Road, Under Ward no- 06 ,BCC, Barishal. (2) (BCC-W-06-D-RCC-B-076) Construction of RCC Drain at Daftarkhana Puran Koylaghat School Road, under Ward no-06,BCC,Barishal. (3) (BCC-W-06-R-RCC-C-022)Construction of RCC Road at Sarub Ali Road Kath-er Gola By-lane, Under Ward no- 06 ,BCC, Barishal. (4) (BCC-W-06-R-CC-A-034)Construction of RCC Road at Gagan Goli Road And By-lane, Under Ward no- 06 ,BCC, Barishal. (5) (BCC-W-06-R-BC-A-043)Construction of RCC Road at Amanatganj BCC Quarter Road, Under Ward no- 06 ,BCC, Barishal. (6) (BCC-W-06-R-BC-B-046)Construction of RCC Road at Borobari Road,adjacent to Wadudia Mosque Amanatganj, Under Ward no- 06 ,BCC, (7) (BCC-W-06-D-RCC-B-077) Construction of RCC Drain at Borobari Road,adjacent to Wadudia Mosque Amanatganj, under Ward no-06,BCC,Barishal. (8) (BCC-W-06-D-BRK-A-004) Construction of RCC Drain at Various Shallow drains inside Kalapatti Colony, under Ward no-06,BCC,Barishal. (9) (BCC-W-06-D-BRK-B-040) Construction of RCC Drain at Various Shallow drains in Different by-lanes inside Shishurpark Colony, under Ward no-06,BCC,Barishal. (10) (BCC-W-06-D-RCC-A-049) Construction of RCC Drain at Ghosh Goli to in front of Councilor`s house, under Ward no-06,BCC,Barishal. (11) (BCC-W-06-D-RCC-B-078) Construction of RCC Drain at Sayestabad Road via Enayeat Ullah Road to Amanatganj Canal, under Ward no-06,BCC,Barishal. (12) (BCC-W-06-D-RCC-C-079) Construction of RCC Drain at In front of Islamia College to Amanatganj Canal, under Ward no-06,BCC,Barishal. (13) (BCC-W-06-R-BC-B-046)Construction of RCC Road at Borobari Road beside Amanatganj Adudia Mosque, Under Ward no- 06 ,BCC, Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works

Estimated value
1270342
Bangladeshworks
closing in 4 weeks

(1) Construction of BC Road at Tiakhali Mira Bari Bylane under 26no,ward. (2) Construction of RCC Drain & RCC Road starting from Sha Poran Sarak Al-Modina Mosque(Molla Bari) up to Firoz Nelufa Madrasha under 29no,ward. (3) (BCC-W-27-R-BC-C-010)Improvement of BC Road at Tiakhali Sarak(Ruyar Pole up-t

Administrator, Barishal City Corporation

W-34/ BCC-RDWMP (1) Construction of BC Road at Tiakhali Mira Bari Bylane under 26no,ward. (2) Construction of RCC Drain & RCC Road starting from Sha Poran Sarak Al-Modina Mosque(Molla Bari) up to Firoz Nelufa Madrasha under 29no,ward. (3) (BCC-W-27-R-BC-C-010)Improvement of BC Road at Tiakhali Sarak(Ruyar Pole up-to Thakur Bari Pole) Under 27 No-Ward.BCC. (4) (BCC-W-27-R-BC-A-019)Improvement of BC Road at Ruya Textil Mill Sarak Under 27 No-Ward.BCC. (5) (BCC-27-D-RCC-B-005)-Construction of RCC Drain at Ruya Textil Mill Sarak & Drain at Janukishing Mosque to BSCIC No-Ward.BCC. (6) Construction of RCC Road at Cristen Colony under 22no,ward. (7) Construction of RCC Road at Collage Avinu 12no, lane opposite side Howlader sarak under 21no,ward. (8) Construction of RCC Road at Mahedi under 04no,ward. (9) Construction of RCC Drain & RCC Road at Janukising Sonali Abason under02no,ward. (10) Improvement of BC Road at Vatekhana Munshi Bari, Bonik Bari Road under 04no,ward. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of

Estimated value
1270326
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-27-R-BC-C-001) Improvement of Nabogram main road Starting Ruyer Pull up to Vanger Pull under 27no,ward. (2) (BCC-W-27-D-RCC-C-001) Construction of BC Road Side RCC Drain Starting Ruyer Pull up to Vanger Pull under 27no,ward. (3) (BCC-W-27-D-RCC-B-002) Construction of RCC Drain at Middle R

Administrator, Barishal City Corporation

W-32/ BCC-RDWMP (1) (BCC-W-27-R-BC-C-001) Improvement of Nabogram main road Starting Ruyer Pull up to Vanger Pull under 27no,ward. (2) (BCC-W-27-D-RCC-C-001) Construction of BC Road Side RCC Drain Starting Ruyer Pull up to Vanger Pull under 27no,ward. (3) (BCC-W-27-D-RCC-B-002) Construction of RCC Drain at Middle Ruyer Howlader Sarak under 27no,ward. (4) (BCC-W-27-R-BC-C-014)Construction of RCC Road at Middle Ruyer Howlader Sarak under 27no,ward Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1270320
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-23-R-ER-187)- Improvement of BC Road at Ahmad Mulla Road to Mogumder Bare Road W-23 (2) (BCC-W-23-R-ER-198)- Improvement of BC Road at Khwaja Moinuddin Chishti Road to Housing W-23 (3) (BCC-W-23-D-RCC-B-050)- Improvement of RCC Drain at Khwaja Moinuddin Chishti Road to Housing W-23 (4) (B

Administrator, Barishal City Corporation

W-31/BCC-RDWMP (1) (BCC-W-23-R-ER-187)- Improvement of BC Road at Ahmad Mulla Road to Mogumder Bare Road W-23 (2) (BCC-W-23-R-ER-198)- Improvement of BC Road at Khwaja Moinuddin Chishti Road to Housing W-23 (3) (BCC-W-23-D-RCC-B-050)- Improvement of RCC Drain at Khwaja Moinuddin Chishti Road to Housing W-23 (4) (BCC-W-23-R-WBM-199)- Improvement of BC Road at South Sagardi Road to Rasbihari Road Part-01 W-23 (5) (BCC-W-23-R-ER-201)- Improvement of BC Road at Pyadabari Bridge to tajkathi Road Part -01 W-23 (6) (BCC-W-23-R-ER-217)- Improvement of BC Road at Nabgram Road to Dr. Sohel Rana House W-23 (7) (BCC-W-23-D-RCC-B-053)- Construction of RCC Drain at Nabgram Road to Dr. Sohel Rana House W-23 (8) (BCC-W-23-R-BC-B-207)- Improvement of BC Road at Pyadabari Bridge to tajkathi Road Part-02 W-23 (9) (BCC-W-23-R-ER-00)- Improvement of BC Road at Khwaja Moinuddin Chishti Road to Housing W-23 (10) (BCC-W-25-D-RCC-)- Construction of RCC Drain at Khwaja Moinuddin Chiste(Islam Para By Lan) Road W-23 Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipm

Estimated value
1270314
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-14-R-BC-A-002)- Improvement of Banglabazzar Mour to Chaitanya School Alekanda Road W-14 (2) (BCC-15-D-RCC-A-018) Construction of RCC Drain at Alekanda Road Side under Ward no-15, BCC, Barishal. (3) (BCC-09-R-BC-C-008)- Improvement of BC Road Anex Bhavan Side Road W-08 (4) (BCC-10-R-BC-C-0

Administrator, Barishal City Corporation

W-12/BCC-RDWMP (1) (BCC-W-14-R-BC-A-002)- Improvement of Banglabazzar Mour to Chaitanya School Alekanda Road W-14 (2) (BCC-15-D-RCC-A-018) Construction of RCC Drain at Alekanda Road Side under Ward no-15, BCC, Barishal. (3) (BCC-09-R-BC-C-008)- Improvement of BC Road Anex Bhavan Side Road W-08 (4) (BCC-10-R-BC-C-040)- Improvement of BC Road at Circuit house Bypass Road W-10 (5) (BCC-W-10-R-BC-C-001)- Improvement of BC Road at Band Road Amtola Mour to Launch Ghat Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1268370
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-29-R-BC-C-002)- Improvement of BC Road at Kashipur School to Hatim Merra Degee Road W-29 (2) (BCC-W-29-D-RCC-B-022)- Construction RCC Drain at Kashipur School to Hatim Merra Degee Road Side W-29 (3) (BCC-W-29-R-BC-C-003)- Improvement of BC Road at Infra Polytechnic to Tetultola Road W-29

Administrator, Barishal City Corporation

W-07/BCC-RDWMP (1) (BCC-W-29-R-BC-C-002)- Improvement of BC Road at Kashipur School to Hatim Merra Degee Road W-29 (2) (BCC-W-29-D-RCC-B-022)- Construction RCC Drain at Kashipur School to Hatim Merra Degee Road Side W-29 (3) (BCC-W-29-R-BC-C-003)- Improvement of BC Road at Infra Polytechnic to Tetultola Road W-29 (4) (BCC-W-29-R-BC-C-003)- Construction of RCC Drain at Infra Polytechnic to Tetultola Road Side W-29 (5) (BCC-W-29-R-BC-C-005)- Improvement of Ichakathi BC Road at Kashipur Bazar to Laden Road W-29 (6) (BCC-W-29-R-BC-C-004)- Improvement of BC Road at Kashipur School to Tetultala Road W-29 Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1268361
Bangladeshworks
closing in 4 weeks

(1) Improvement of BC Road Sapania Culvert upto Vhagar Via Bir Muktijoddha Anayar Hossain Mallik Road, under Ward no-03,BCC,Barishal. (2) (Improvement of BC Road At Bir Mukijoddha Anowar Hossain Mallik Road under Ward no-03, BCC, Barishal. (3) Improvement of RCC Drain At Bir Mukijoddha Anowar Hossai

Administrator, Barishal City Corporation

W-05/BCC-RDWMP (1) Improvement of BC Road Sapania Culvert upto Vhagar Via Bir Muktijoddha Anayar Hossain Mallik Road, under Ward no-03,BCC,Barishal. (2) (Improvement of BC Road At Bir Mukijoddha Anowar Hossain Mallik Road under Ward no-03, BCC, Barishal. (3) Improvement of RCC Drain At Bir Mukijoddha Anowar Hossain Mallik Road under Ward no-03,BCC,Barishal. (4) Improvement of BC Road At Kaunia Housing east side road under Ward no-03, BCC, Barishal. (5) Improvement of RCC Drain At Kaunia Housing east side road under Ward no-03, BCC, Barishal. (6) Improvement of BC Road At Kaunia Housing West side road under Ward no-03, BCC, Barishal. (7) Improvement of RCC Drain At Kaunia Housing West side road under Ward no-03, BCC, Barishal. (8) Improvement of BC Road At Amirganj Road West side Mira bari Road, under Ward no-03, BCC, Barishal. (9) Improvement of RCC Drain At Amirganj Road West side Mira bari Road side, under Ward no-03, BCC, Barishal. (10) Improvement of BC Road At Suraiya Mosque`s east side Road upto Mr. Habib Mia`s House, under Ward no-03, BCC, Barishal. (11) Improvement of BC Road At Sardar Kanda Mr. Kalu`s Shop upto Mr. Salim Sikdar`s house, under Ward no-03, BCC, Barishal. (12) Improvement of BC Road At Rajjakia Madrasa Road upto Ketab Ali Munshi Road ,under Ward no-03,BCC,Barishal. (13) Improvement of RCC Drain At Rajjakia Madrasa Road upto Senapalli Road side, under Ward no-03, BCC, Barishal. (14) Improvement of BC Road At Rajiakia Madrasa Road upto Senapalli, under Ward no-03, BCC, Barishal. (15) Construction of BC Road at In Side of Rajiakia Madrasa, under Ward no-03, BCC, Barishal. (16Improvement of RCC Drain At Rajiakia Madrasa Road upto Ketab Ali Munshi Road ,under Ward no-03,BCC,Barishal. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Cons

Estimated value
1268354
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-03-R-BC-C-049)- Improvement of BC Road at Amtola Main Road to Power Station to puranpara Road W-03 (2) (BCC-W-03-R-BC-C-048)- Improvement of BC Road at khokon Kabiraj Bare to Amtola Main Road W-03 (3) (BCC-W-03-R-BC-C-064)- Improvement of BC Road Textile Bottola to Hazrat bellal Mosque (E

Administrator, Barishal City Corporation

W-04/BCC-RDWMP (1) (BCC-W-03-R-BC-C-049)- Improvement of BC Road at Amtola Main Road to Power Station to puranpara Road W-03 (2) (BCC-W-03-R-BC-C-048)- Improvement of BC Road at khokon Kabiraj Bare to Amtola Main Road W-03 (3) (BCC-W-03-R-BC-C-064)- Improvement of BC Road Textile Bottola to Hazrat bellal Mosque (East Side) Road W-03 (4) (BCC-W-03-R-ER-B-038)- Improvement of BC Road Maji Bari Road W-03 (5) (BCC-W-03-R-BC-C-067)- Improvement of BC Road at Kaunia Housing Main Road W-03 (6) (BCC-W-03-R-BC-C-029)- Improvement of BC Road at Faruk mira Bari Road W-03 (7) (BCC-W-03-R-BC-C-036)- Improvement of BC Road at Matasar School(West Side) to Andirpara Dighi Road W-03 (8) (BCC-W-03-R-BC-C-037)- Improvement of BC Road at Andirpara Dighi To Amirganj Main Road W-03 Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1268341
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-03-R-BC-A-020) Improvement of BC Road at Kawnia College to Puran Moyla Khola Main Road under Ward no-03, BCC, Barishal. (2) (BCC-W-03-R-RCC-A-025) Improvement of BC Road at Sadiman Road, under Ward no-03, BCC, Barishal. (3) (BCC-W-03-D-RCC-B-016) Construction of RCC Drain at Sadiman Road

Administrator, Barishal City Corporation

W-03/ BCC-RDWMP (1) (BCC-W-03-R-BC-A-020) Improvement of BC Road at Kawnia College to Puran Moyla Khola Main Road under Ward no-03, BCC, Barishal. (2) (BCC-W-03-R-RCC-A-025) Improvement of BC Road at Sadiman Road, under Ward no-03, BCC, Barishal. (3) (BCC-W-03-D-RCC-B-016) Construction of RCC Drain at Sadiman Road under Ward no-03, BCC, Barishal. (4) (BCC-W-03-R-RCC-C-022) Improvement of BC Road at Moyla Khola Culvert to Amirgang Road, under Ward no-03, BCC, Barishal. (5) (BCC-W-03-R-RCC-C-026) Improvement of BC Road at Mridha Bari Road to Amirgang Road, under Ward no-03, BCC, Barishal. (6) (BCC-W-03-R-CC-C-028) Improvement of BC Road at Chhoto Bottola to Puran Para Motasar Main Road, under Ward no-03, BCC, Barishal. (7) (BCC-W-03-D-RCC-C-017) Construction of RCC Drain at Chhoto Bottola to Puran Para Matasar Mian Road, under Ward no-03,BCC,Barishal. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1268317
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-26-ER(A)-083) Construction of CC Pavement at Tiakhali Horen Mistory Bari Road Under 26 No Ward.BCC. (2) (BCC-W-26-ER(A)-123) Construction of CC Pavement at Kalizira River Side Road up-to Side of Badsha Mirda Bari Road. Under 26 No Ward.BCC. (3) (BCC-W-26-ER(A)-124) Construction of CC Pave

Administrator, Barishal City Corporation

W-58/ BCC-RDWMP (1) (BCC-W-26-ER(A)-083) Construction of CC Pavement at Tiakhali Horen Mistory Bari Road Under 26 No Ward.BCC. (2) (BCC-W-26-ER(A)-123) Construction of CC Pavement at Kalizira River Side Road up-to Side of Badsha Mirda Bari Road. Under 26 No Ward.BCC. (3) (BCC-W-26-ER(A)-124) Construction of CC Pavement at Kalizira River Side Road up-to Mollick Bari Road. Under 26 No Ward.BCC. (4) (BCC-W-26-ER(A)-125) Construction of CC Pavement at Kalizira River Side Road up-to Mirda Bari Road. Under 26 No Ward.BCC. (5) (BCC-W-26-ER(A)-126) Construction of CC Pavement at Kalizira River Side Road up-to Khan Bari Road. Under 26 No Ward.BCC. (6) (BCC-W-13-R-BC(A)-060-061) Construction of CC Road at Sapnalaya School Road. Under Ward No-13, BCC. (7) (BCC-W-09-R-BFS-034) Construction of CC Pavement at Chalk Bazar Mondir Sanagana South SideGoli. Under 09 No Ward.BCC. (8) (BCC-W-10-R-CC-046) Construction of CC Pavement at Baptist Mission Road Sanagana Uilim Para 1st Goli & 2nd Goli.Under 10 No Ward.BCC. (9) (BCC-W-13-R-HBB-A-019) Construction of CC Pavement at Khan Sarak up-to Bagan Bari Bridge.Under13 No Ward.BCC. (10) (BCC-24-R-ER-A-032) - Construction of CC Pavement at Khan Sarak up-to Rahad Khan Bari Road.Under13 No Ward.BCC. (11) (BCC-W-24-R-ER-A-029) Construction of CC Pavement at South Sagordi Road up to Gousia Sarak.Under 24 No Ward.BCC. (12) (BCC-W-24-R-CC-A-043) Construction of CC Pavement at A Wohed Sarak By Lane South Side of Mosjid.Under 24 No- Ward.BCC. (13) (BCC-W-10-R-CC-A-047) Construction of CC Pavement at KDC Colony Road.Under 10 No- Ward.BCC. (14) (BCC-27-D-RCC-A-046)-Construction of RCC Drain at KDC Colony Under 10 No-Ward.BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, fo

Estimated value
1268270
Bangladeshworks
closing in 4 weeks

Road At Latu Chawdhori Sarak Bylane South Side of Chawdhori Vila under 15no, ward. (4) Construction of CC Road At Dhan Gobeshona Sarak up to Madical Collage Houseing under 24 no ward.(5) Construction of CC Road at Kala Fakir Road starting from Ghawshia Sarak up to Kala Fakir Bari under 24no,ward.(6)

Administrator, Barishal City Corporation

W-56/ BCC-RDWMP (1) Construction of CC Road at Rafiqul Islam Bari Sarak under 13no, wards. (2) Construction of CC Road STARTING FROM Bottola Sarif Bari up to Kharom Sha Bari under 15 no. ward. (3) Construction of CC Road At Latu Chawdhori Sarak Bylane South Side of Chawdhori Vila under 15no, ward. (4) Construction of CC Road At Dhan Gobeshona Sarak up to Madical Collage Houseing under 24 no ward.(5) Construction of CC Road at Kala Fakir Road starting from Ghawshia Sarak up to Kala Fakir Bari under 24no,ward.(6) Construction of CC Road at Dhan Gobeshona Bylane Starting from Dhan Gobeshona road up to Khal Par under 24no,ward.(7) Construction of CC Road at New Housing Road Starting from Dhan Sikder Bari up to Gobeshona road under 24no,ward. (8) Construction of CC Road at Cristen Para Sarak starting Cristen para up to Dhan Gobeshona under 24no ward. (9) Construction of CC Road at Vasani Sarak Badshaye Mosque Connecting road under 25no ward. (10) Construction of CC Road at Saw mil Road Starting from Barisal Rupatoli Sarak up to Tazkati sarak under 25no ward. (11) Construction of CC Road at Molla Bari Sarak Starting from Sobuj Khan House up to Molla Bari under 25 no ward. (12) Construction of Ukil Bari Sarak Back side of Patrol Pamp under 25 no ward. (13) (Construction of CC Road at Sharif Bari Road Starting from Ukil Bari sarak up to Sharif Bari under 25 no ward. (14) Construction of CC Road at Chawkider Bari Road starting from Gasterbin Sarak up to Chawkider Bari under 25 no ward. (15) Construction of CC road at Kazi Bari In fornt of Polli Beddut Office under 25 no ward. (16) Construction of CC road at Gayen Bari Sarak part-01 under 26 no ward. (17) Construction of CC road Jubayer Sarak Starting from South Sagordi Road up to New Housing under 25 no ward Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction w

Estimated value
1268261
Bangladeshworks
closing in 4 weeks

(1) (BCC-25-D-RCC-104)-Construction of RCC Drain at Asalot Khan Sarak up to Radio Center.BCC. (2) (BCC-09-D-RCC-(A) 029)-Construction of RCC Drain at Back Side of Town Hall.BCC.

Administrator, Barishal City Corporation

W-48/BCC-RDWMP (1) (BCC-25-D-RCC-104)-Construction of RCC Drain at Asalot Khan Sarak up to Radio Center.BCC. (2) (BCC-09-D-RCC-(A) 029)-Construction of RCC Drain at Back Side of Town Hall.BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1268246
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-09-R-BC-(C)-010) Construction of BC Road at (Ek Tala Lonce Gate up-to Infront of Folpoty Road)- Under Ward No-9,BCC. (2) (BCC-W-09-R-BC-(C)-016) Construction of RCC Road at Enayetur Rhaman Sarak By Lane. Under Ward No-9, BCC. (3) (BCC-W-09-R-RCC-039) Construction of RCC Road at Beauty Roa

Administrator, Barishal City Corporation

W-44/ BCC-RDWMP (1) (BCC-W-09-R-BC-(C)-010) Construction of BC Road at (Ek Tala Lonce Gate up-to Infront of Folpoty Road)- Under Ward No-9,BCC. (2) (BCC-W-09-R-BC-(C)-016) Construction of RCC Road at Enayetur Rhaman Sarak By Lane. Under Ward No-9, BCC. (3) (BCC-W-09-R-RCC-039) Construction of RCC Road at Beauty Road (Cholk Bazar up-to Pote Road) Under Ward No-9,BCC. (4) (BCC-W-10-R-BC(C)-010) Construction of RCC Road at Seba Clinik Sanagana Costal Barof Kal Road (Bundh Road up-to River) Under Ward No-10,BCC. (5) (BCC-W-12-R-BC(C)-030) Construction of RCC Road at Torab Ali Khan By Lane. Under Ward No-12, BCC. (6) (BCC-W-15-R-BC(A)-034) Construction of RCC Road at Hajrot Kalusha Sarak Bagan Bari Road Under Ward No-15,BCC. (7) (BCC-W-15-R-BC(C)-008) Construction of RCC Road at Muslim Para Sarak. Under Ward No-15, BCC. (8) (BCC-W-25-R-ER(A)-025) Construction of RCC Road at Infront C & B Road Polly Bidyut Office up-to Ukil Bari Sarak. Under Ward No-25, BCC. (9) (BCC-W-14-R-ER(A)-020) Construction of RCC Road at Khalpar Sarak Poraton Mosjid Goli & C & B Road Ganoni Mongil Mongil up-to Kalusha Sarak By Lane. Under Ward No-14, BCC. (10) (BCC-W-24-R-BC(A)-024) Construction of RCC Road at Khan Bari Sarak.( Dhangobeshona Sarak up-to Hamid Khan Sarak) Under Ward No-24,BCC. (11) (BCC-W-24-R-ER(A)-027) Construction of RCC Road at Haji Bari Sarak(Sagordi Mardasha up-to Sagordi Road) Under Ward No-24,BCC. (12) (BCC-W-24-R-ER(A)-029) Construction of RCC at Braun Sarak( South Sagordi Road up-to Goushia Sarak) Under Ward No-24,BCC. (13) (BCC-W-24-R-ER(A)-032) Construction of RCC Road at Braun Sarak at Sagordi Khalpar Sarak(Khristan Para up-to Dhangobashona Sarak) Under Ward No-24,BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communi

Estimated value
1266374
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-27-R-BC-C-024) Improvement of BC Road at 1 No-Indrakathi Sarak (Namasutra Para) Under Ward No 27 BCC. (2) (BCC-W-27-R-BC-B-091) Improvement of BC Road at Diapara Sarak Under Ward No 27 BCC. (3) (BCC-W-27-D-RCC-B-003) Construction of RCC Drain at Diapara Sarak Under Ward No-27.BCC. (4) (BC

Administrator, Barishal City Corporation

W-33/ BCC-RDWMP (1) (BCC-W-27-R-BC-C-024) Improvement of BC Road at 1 No-Indrakathi Sarak (Namasutra Para) Under Ward No 27 BCC. (2) (BCC-W-27-R-BC-B-091) Improvement of BC Road at Diapara Sarak Under Ward No 27 BCC. (3) (BCC-W-27-D-RCC-B-003) Construction of RCC Drain at Diapara Sarak Under Ward No-27.BCC. (4) (BCC-27-R-BC-C-039)-Improvement of BC Road Bir MuktiJoddha Abdur Rahman Khan Sarak (Eatim Khana Sarak) Under 27 No Ward, BCC. (5) (BCC-27-D-RCC-B-004)-Construction of RCC Drain at Bir MuktiJoddha Abdur Rahman Khan Sarak (Eatim Khana Sarak) Under 27 No Ward, BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1266358
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-23-R-ER-131) Construction of BC Road at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (2) (BCC-W-23-D-RCC-B-042)Construction of RCC Drain at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (3) (BCC-W-23-R-HBB-136) Constru

Administrator, Barishal City Corporation

W-30/BCC-RDWMP (1) (BCC-W-23-R-ER-131) Construction of BC Road at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (2) (BCC-W-23-D-RCC-B-042)Construction of RCC Drain at Sarder Bari Bridge up-to Thakur Bari Bridge Kazi Bari Road Under Ward No 23 BCC. (3) (BCC-W-23-R-HBB-136) Construction of BC Road at South Sagordi Road uo-to Robin Sikder Bari Road Under Ward No 23 BCC. (4) (BCC-W-23-R-ER-137) Construction of BC Road at South Sagordi Road uo-to Robin Sikder Bari Link Road Under Ward No 23 BCC. (5) (BCC-W-23-R-BC-C-147) Improvement of BC Road at Sagordi Bazar uo-to Dorga Bari Bridge Under Ward No 23 BCC. (6) (BCC-W-23-BC-B-168) Improvement of BC Road at Yaqub Ali Sarder Sarak Under Ward No 23 BCC. (7) (BCC-W-23-D-RCC-B-029) Construction of RCC Drain at Yaqub Ali Sarder Sarak Under Ward No 23 BCC. (8) (BCC-W-23-R-BC-C-182) Improvement of BC Road at South Sagordi Road up-to Ahammad Molla Sarak Akon Bari Under 23 No-Ward. (9) (BCC-W-23-D-RCC-B-030)Construction of RCC Drain at South Sagordi up-to Ahammad Molla Sarak (Vashani Sarak)Under 23 No-Ward. (10) (BCC-W-23-R-BC-C-177) Improvement of BC Road at Tiakhali Sarak Gabtola Road up-to Fakir Bari School Road Under 23 No-Ward. (11) (BCC-23-D-RCC-B-046)-Construction of RCC Drain at Tiakhali Road Gabtola up-to Fakir Bari School Road Under 23 No-Ward.BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation

Estimated value
1266335
Bangladeshworks
closing in 4 weeks

(1) Improvement of North Fishary road 1st lane part-01 under 28no, ward. (2) Construction of RCC Road Starting from Fishari road West Zone up to Mira Bari under 28no,ward.(Sona Muddin Hawlader Sarak). (3) Construction of RCC Road & RCC Drain North Fishari road (West Zone Khan Bari) under 28no ward.

Administrator, Barishal City Corporation

W-36/ BCC-RDWMP (1) Improvement of North Fishary road 1st lane part-01 under 28no, ward. (2) Construction of RCC Road Starting from Fishari road West Zone up to Mira Bari under 28no,ward.(Sona Muddin Hawlader Sarak). (3) Construction of RCC Road & RCC Drain North Fishari road (West Zone Khan Bari) under 28no ward. (4) Improvement of Nobojagoroni School up to Baruzzar hat under 28no ward,BCC. (5) Improvement of Dia Para Sarak up to Datter Hut Sarak Part-02 under 28no, Ward.(Mahanagor Collage Sarak) (6) Improvement of Lattif Sarak up to Lattif MoWlana House under 28no, ward. (7) Improvement of BC Road at Bir Mukttijodda Captin Mahiuddin sarak (GCC) under 28no, ward. (8) Improvement of Diya para sarak up to Teatul Tola (Lotif Sarak) under 28no, ward.(Mira Bari up to Etimkhana Road) (9) Improvement of Bir Mukttijodda Captin Mahiuddin sarak connecting road (Etim Khana sarak up to Miazi Bari) under 28no ward.(Halalia Mosque up to Master Mr. Kanchon Ali House) (10) Improvement of Etim Khana Sarak up to Samshu Mazi Bari via Anser Kazi Bari Part-03 under 28no ward.(West Side of Bitul Aman Madrasha) (11) Improvement of Lattif MowlanaSarak up to Lattif Mollana House under 28no, ward.(Md Khalilur Rahaman House) (12) Improvement of Bir Mukttijodda Captin Mahiuddin sarak up to Vedhuria Khal Par (Bir Mukttijodda Shaid Abdur Rob Sikder) under 28no, ward. (13) Improvement of Bir Muktijudda Shaid Abdul Rob Sikder Sarak (Tatuil Tola Sarak) up to Bir Mukttijodda Captin Mahiuddin sarak (Middel Diea Para Sarak part-01) under 28no ward, BCC. (14) Improvement of Bir Muktijudda Shaid Abdul Rob Sikder Sarak (Tatuil Tola Sarak) up to Bir Mukttijodda Captin Mahiuddin sarak (Middel Diea Para Sarak part-02) under 28no ward, BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Constr

Estimated value
1255991
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-29-R-BC-A-028) Improvement of Bc road starting from Laden Sarak up to Cuncelor House under 29no,ward. (2) (BCC-W-29-R-CC-A-049)Construction of RCC Road at Kashipur Aken Sha Sarak under 29no,ward (3) (BCC-W-29-R-CC-A-049) Construction of CC Road at Shugonda House under 29no,ward (4) (BCC-W

Administrator, Barishal City Corporation

W-43/ BCC-RDWMP (1) (BCC-W-29-R-BC-A-028) Improvement of Bc road starting from Laden Sarak up to Cuncelor House under 29no,ward. (2) (BCC-W-29-R-CC-A-049)Construction of RCC Road at Kashipur Aken Sha Sarak under 29no,ward (3) (BCC-W-29-R-CC-A-049) Construction of CC Road at Shugonda House under 29no,ward (4) (BCC-W-29-R-HBB-A-056) Improvement of Bc road at Darul Huda MadrashaSarak under 29no,ward. (5) (BCC-W-29-R-BC-A-060) Improvement of BC Road At Bagia Garur Hut Side Khal Par Sarak under 29no,ward. (6) (BCC-W-29-D-RCC-B-033) Construction of RCC Drain at Kashipur Bazar Mosque Side up to Miyar Bari under 29no,ward. (7) (BCC-W-29-D-RCC-B-034)Construction of RCC Drain starting from North Isakati Mohamaya Monder up to Napid Bari Khal 29no,ward. (8) (BCC-W-30-R-BFS-A-032) Improvement of Bc road Starting From Abdur Rahaman Hawlader Bari up to Goal Bari under 30no,ward. (9) (BCC-W-30-R-HBB-A-041) Improvement of Bc road at Salauddin Bapari Bari under 30no,ward. (10) (BCC-W-30-R-CC-C-100) Improvement of Bc road Starting from Raintre Tola-Solna Sarak up to Sayed Farid House under 30no,ward. (11) (BCC-W-30-R-CC-C-100) Construction of RCC Road at Kazi Bara Brance road under 30no,ward. (12) (BCC-W-30-R-HBB-A-142) Construction of BC Road Starting from C&B road East side Goriar Par up to Mogor Para sarak House under 30no,ward. (13) (BCC-W-30-R-HBB-A-143) Construction of BC Road Starting from C&B road East side Goriar Par up to Mogor Para sarak Salim Jabed House under 30no,ward. (14) (BCC-W-30-D-RCC-C-004) Construction of RCC Drain Starting From Kashipur Girls School up to Gonpara Chairman Bari Khal par under 30no,ward.(Vaduria Khal Par Culvert up to -Bari) (15) (BCC-W-30-D-RCC-B-005) Construction of RCC Drain Starting from Chohata Mollik Bari Madrasha up to Vaduri Khal par under 30no,ward. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering w

Estimated value
1255984
Bangladeshworks
closing in 4 weeks

(1) (BCC-W-22-D-RCC-C-047) Construction of Nabogram main road (Hatem Ali College Chowmatha to Ruyer Pull) Road side RCC Drain with drain to Live Stock under ward no-22 & Road near Jubok Housing ward 23, BCC. (2) (BCC-W-22-R-BC-C-090) Improvement of Nabogram main road (Hatem Ali College Chowmatha to

Administrator, Barishal City Corporation

W-26/BCC-RDWMP (1) (BCC-W-22-D-RCC-C-047) Construction of Nabogram main road (Hatem Ali College Chowmatha to Ruyer Pull) Road side RCC Drain with drain to Live Stock under ward no-22 & Road near Jubok Housing ward 23, BCC. (2) (BCC-W-22-R-BC-C-090) Improvement of Nabogram main road (Hatem Ali College Chowmatha to Ruyer Pull) under ward no-22, BCC. Construction work;Site preparation work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Works for complete or part construction and civil engineering work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Building installation work;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Building completion work;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work;Hire of construction and civil engineering machinery and equipment with operator;Hire of cranes with operator;Hire of earthmoving equipment with operator

Estimated value
1255884

Free tender alerts

Get a weekly digest of new tenders

New new tenders matching your interests, delivered to your inbox — no app required. Tell us your email and we'll start a weekly digest. Add keywords or a minimum value in the message and we'll filter to match.

Opens your mail app pre-addressed. We only use your email for the digest you requested.