Skip to main content

CPV 4510

Site preparation work

13 active tenders tagged under this CPV division — sort, filter, and drill in via the master tenders page.

Bosnia & Herzegovina

Izvođenje pripremnih radova za II fazu radova na sanaciji TTNG Živinice.

OPERATOR - TERMINALI FEDERACIJE D.O.O. SARAJEVO

Estimated valueNot disclosed
1138-1-3-113-3-63/26
United Kingdomworks

Capital Programme Delivery Framework(s)

SEVERN TRENT WATER LIMITED ('STW')

The intention of this procurement is to place several Framework(s), that will cover Capital Works across the geographical areas in which STW and HD operate, in England and Wales, for Lots covering Managed Service, Design & Build, and Directed Delivery. See the following link for details on the forthcoming procurement issued by Severn Trent (copy and paste into your browser): https://www.severntrent.com/media/news-releases/severn-trent-to-launch-market-engagement-for-up-to-p25bn-capital/ Should the above link not work for any given applicant then please visit the Linked-In pages of Severn Trent Water Limited where the news release is also available. As part of one or more of the lotting requirements, suppliers may be required to provide earlier design stages, in addition to detailed designs which are envisaged to form part of the lotting requirements. Further information will be provided at the PME day or at later stages of the process. The contract start and end dates are as per those stated in this notice, and may be for up to 12 years. All of the above is subject to change by STW and / or HD as required.

Estimated value£25.0bn
071920-2026
United Kingdomworks

Capital Programme Delivery Framework(s)

SEVERN TRENT WATER LIMITED ('STW')

The intention of this procurement is to place several Framework(s), that will cover Capital Works across the geographical areas in which STW and HD operate, in England and Wales, for Lots covering Managed Service, Design & Build, and Directed Delivery. See the following link for details on the forthcoming procurement issued by Severn Trent (copy and paste into your browser): https://www.severntrent.com/media/news-releases/severn-trent-to-launch-market-engagement-for-up-to-p25bn-capital/ Should the above link not work for any given applicant then please visit the Linked-In pages of Severn Trent Water Limited where the news release is also available. As part of one or more of the lotting requirements, suppliers may be required to provide earlier design stages, in addition to detailed designs which are envisaged to form part of the lotting requirements. Further information will be provided at the PME day or at later stages of the process. The contract start and end dates are as per those stated in this notice, and may be for up to 12 years. All of the above is subject to change by STW and / or HD as required.

Estimated value£25.0bn
072107-2026
United Kingdomworks

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Penzance Council is sourcing an appropriately qualified contractor to submit a quote for the repair and replacement of elements of the Penlee House Gallery & Museum roof. Project background: A roof survey undertaken in 2024 established areas of the roof of Penlee House which were causing water ingress and therefore required repair or replacement. Priority areas of work have been identified, as detailed in the specification document and plans attached to this tender, and it is these works for which Penzance Council seeks a qualified contractor. In order for Penzance Council to appropriately plan and budget for the subsequent contract, we would require the successful contractor to supply accurate details of: a) Method statement for all areas of work detailed in specification b) Detail of products to be used c) Limits of works d) Insurance information e) Cost breakdown as per specification. Please complete 'Price Schedule' spreadsheet, provided with tender notice, with all costs. f) Evidence of having carried out similar pieces of work. Returned quotations for the repair and replacement of the required areas of the roof will be assessed on three main criteria in order to appoint the successful contractor to undertake this work: 1) Comprehensive explanation on how the contractor will achieve the requirements set out = 30% 2) Cost = 40% 3) History/Evidence of having carried out similar pieces of work in the past = 30%

Estimated value£105,427
069151-2026
United Kingdomworks
closing in 2 weeks

MUGA Refurbishment, Weston Road, Portland, Dorset

Portland Town Council

The scope of the services required is for one off refurbishment works at the site of a former MUGA at Weston Road Playing Field to comprise of the following elements • Removal and disposal of approx. 795m2 of existing synthetic grass carpet • Carry out any necessary ground and reinstatement works • Supply and installation of approx. 500m2 synthetic sports pitch grass to include football pitch markings • Supply and installation of 1 no. 20m x 25m MUGA - 3m high fence with recessed football goal ends and 2 gates • Supply and installation of approx. 290m2 of Single colour wetpour surfacing • Supply and installation of 1.2m bowtop fencing including 2 no. gates - approx. 49 linear meters • Supply and installation of 1 no. Robinia large multi-play ship unit • Supply and installation of 1 no. Robinia group rope pendulum swing • Supply and installation of 1. No Robinia 4-person multi see-saw • Supply and installation of 4 no. Recycled composite material park benches • Supply and installation of 2 no. Litter bins • Supply and installation of 1.no Recycled composite material inclusive picnic table

Estimated value£110,000
069452-2026
United Kingdomworks
closing in 6 days

Gremista Landfill, Lerwick, Shetland - Phase 3 Construction

Shetland Islands Council

The Gremista Landfill, Lerwick Phase 3 extension will primarily involve cut and fill earthworks, new haul roads, installing new surface water drainage ditches, pipework, manholes, and headwalls; placing a 500mm bentonite-enriched soil layer over the new landfill formation surface; followed by a 2mm HDPE welded geomembrane basal liner, protection geotextile, leachate collection pipework, and 500mm thick, clean aggregate drainage / protection layer. Capping works to the existing Phase 2 landfill area are also included and will comprise 1mm thick LLDPE welded geomembrane and restoration soils.

Estimated valueNot disclosed
064802-2026
United Kingdomservices

Vehicle Removals and Car Pound Services

London Borough of Hackney

The provision of Vehicle Removals and Car Pound Services. This contract deals with the removal of vehicles parked in contravention and nuisance vehicles as part of the statutory process underpinned by the Traffic Management Act 2004 and the Refuse Disposal (Amenity) Act 1978. The contract will be divided into two lots: Lot 1: Car Pound Setup and Operation Lot 2: Vehicle Removal and Scrapping Service

Estimated value£9.3m
064560-2026
United Kingdomworks

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Penzance Council is sourcing an appropriately qualified contractor to submit a quote for the repair and replacement of elements of the Penlee House Gallery & Museum roof. Project background: A roof survey undertaken in 2024 established areas of the roof of Penlee House which were causing water ingress and therefore required repair or replacement. Priority areas of work have been identified, as detailed in the specification document and plans attached to this tender, and it is these works for which Penzance Council seeks a qualified contractor. In order for Penzance Council to appropriately plan and budget for the subsequent contract, we would require the successful contractor to supply accurate details of: a) Method statement for all areas of work detailed in specification b) Detail of products to be used c) Limits of works d) Insurance information e) Cost breakdown as per specification. Please complete 'Price Schedule' spreadsheet, provided with tender notice, with all costs. f) Evidence of having carried out similar pieces of work. Returned quotations for the repair and replacement of the required areas of the roof will be assessed on three main criteria in order to appoint the successful contractor to undertake this work: 1) Comprehensive explanation on how the contractor will achieve the requirements set out = 30% 2) Cost = 40% 3) History/Evidence of having carried out similar pieces of work in the past = 30%

Estimated value£105,427
064562-2026
United Kingdomworks

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Penzance Council is sourcing an appropriately qualified contractor to submit a quote for the repair and replacement of elements of the Penlee House Gallery & Museum roof. Project background: A roof survey undertaken in 2024 established areas of the roof of Penlee House which were causing water ingress and therefore required repair or replacement. Priority areas of work have been identified, as detailed in the specification document and plans attached to this tender, and it is these works for which Penzance Council seeks a qualified contractor. In order for Penzance Council to appropriately plan and budget for the subsequent contract, we would require the successful contractor to supply accurate details of: a) Method statement for all areas of work detailed in specification b) Detail of products to be used c) Limits of works d) Insurance information e) Cost breakdown as per specification. Please complete 'Price Schedule' spreadsheet, provided with tender notice, with all costs. f) Evidence of having carried out similar pieces of work. Returned quotations for the repair and replacement of the required areas of the roof will be assessed on three main criteria in order to appoint the successful contractor to undertake this work: 1) Comprehensive explanation on how the contractor will achieve the requirements set out = 30% 2) Cost = 40% 3) History/Evidence of having carried out similar pieces of work in the past = 30%

Estimated value£105,427
063030-2026
United Kingdomworks

Science Estates Delivery Framework

ANIMAL AND PLANT HEALTH AGENCY

Defra is developing a new Science Estates Delivery Framework to support the Animal and Plant Health Agency (APHA) site at Weybridge and provide a flexible, expert and accessible route to market for high containment building requirements at Weybridge. The framework is expected to provide access to a broad range of life sciences construction, infrastructure, construction professional services and specialist services supporting the refurbishment and development of both high-containment and non-containment facilities, primarily utilised at the Weybridge site (though may be available across Defra Group locations and projects). APHA Weybridge is one of the United Kingdom's most significant science and research campuses, providing nationally important capabilities in animal health, plant health and biosecurity. The framework is intended to support a long-term unique and technically complex estate and programme. Prior to initiating any procurement, Defra wishes to engage with the market to better understand supplier market capability and capacity. Feedback received through this engagement will help inform procurement and contract decisions including potential lotting arrangements. The framework may include a range of construction works and services, and the areas identified within this notice are indicative only and have been included to support market engagement. The final scope, procurement strategy and lot structure have not yet been determined and will be developed following engagement with the market. The framework may include the below services. It should be noted that these services and Lots structures are subject to change. The service scope includes, but is not limited to: - Construction Works: High and Low Containment facility construction; Mechanical & Electrical works; Demolition and enabling works; Civil engineering; Infrastructure works; Utilities works; Building fabric works; Refurbishment works; New build construction; Professional and Technical Services; Mu

Estimated value£250.0m
062704-2026
United Kingdomworks
closing in 5 weeks

Response Maintenance & Improvement - Mid Ulster/S Area & Mid & East Antrim

Northern Ireland Housing Executive

The lot contracts associated with this competition will deliver responsive maintenance, emergency repairs, void property works, civil engineering, asbestos services, fire safety works, and associated inspections across the Contracting Authority's properties within the relevant region. The successful Suppliers will provide a 24/7/365 responsive repairs service, undertake technical and compliance inspections, manage multi‑trade repair tasks, and support statutory landlord obligations. Services include working in occupied and unoccupied homes, communal areas, and Contracting Authority-owned land and buildings. The Suppliers must meet extensive requirements in health and safety, customer care, IT integration, appointments, reporting, social value, environmental sustainability, and performance management, and must collaborate with the Contracting Authority. No minimum volume of work is guaranteed. In accordance with the Procurement Policy Note 01/21 – Social Value in Procurement, this Contract will deliver measurable social value outcomes. Under this Procurement Suppliers will be required to support the Contracting Authority's social value objectives. Accordingly, Contract performance conditions and Award Criteria may relate, in particular, to social value.

Estimated value£95.9m
063002-2026
United Kingdomworks
closing in 5 weeks

Response Maintenance & Improvement - Mid Ulster/S Area & Mid & East Antrim

Northern Ireland Housing Executive

The lot contracts associated with this competition will deliver responsive maintenance, emergency repairs, void property works, civil engineering, asbestos services, fire safety works, and associated inspections across the Contracting Authority's properties within the relevant region. The successful Suppliers will provide a 24/7/365 responsive repairs service, undertake technical and compliance inspections, manage multi‑trade repair tasks, and support statutory landlord obligations. Services include working in occupied and unoccupied homes, communal areas, and Contracting Authority-owned land and buildings. The Suppliers must meet extensive requirements in health and safety, customer care, IT integration, appointments, reporting, social value, environmental sustainability, and performance management, and must collaborate with the Contracting Authority. No minimum volume of work is guaranteed. In accordance with the Procurement Policy Note 01/21 – Social Value in Procurement, this Contract will deliver measurable social value outcomes. Under this Procurement Suppliers will be required to support the Contracting Authority's social value objectives. Accordingly, Contract performance conditions and Award Criteria may relate, in particular, to social value. The Housing Executive reserves the right to undertake preliminary market engagement in relation to this requirement. Where such engagement is anticipated, a Preliminary Market Engagement Notice is intended to be published. The content within this notice is indicative and subject to change.

Estimated value£95.9m
063009-2026
Norwayworks

BME X 2026-03 Mindetorget - Veiledende kunngjøring Samspillskontrakt

Bergen kommune - Bymiljøetaten

Bergen kommune v/Bymiljøetaten informerer om kommende anskaffelse av «Mindetorget», som vil bli lyst ut som en entreprenørstyrt samspillskontrakt (samspill til totalentreprise).

Estimated valueNot disclosed
2026-108223