Winnipeg Transit - Fort Rouge Garage Pavement Reconstruction - Phase 1
The City of Winnipeg
D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of the reconstruction of existing pavement in the following areas surrounding the Fort Rouge Garage: (a) Northwest of the garage outside the wash bay exit and service bay entrances, as identified in the Drawings. Approximate reconstruction area is 2,000 sq.m. D2.2 The major components of the Work are as follows: (a) Removal of existing asphalt and concrete pavements and curbs within the prescribed work areas. (b) Excavation and placement of geotextile fabric, geogrid, sub-base material, and base course material. (c) Construction of 180 mm concrete pavements (reinforced) and concrete curbs. (d) All work must be carried out per the Construction Staging Plan defined by the Consultant. D2.3 The funds available for this contract are $650,000.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Consulting Services for Preliminary Design of Riverbank and Roadway Works
The City of Winnipeg
Replace Flooring Bldg 102 & Bldg 110
W7MX USPFO ACTIVITY CAANG 144
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM)
DfI TRAM Road Asset Management – Road Restraint Systems Framework
DfI Transport and Road Asset Management (TRAM)
Repair and renovation work of the boundary wall of Gate No. 2 and the road of the garage on the north side of the bus building of the Deputy Commissioner, Rajshahi.
Rajshahi PWD Division-1