Pre-Qualification - Shoal Lake 40 Wastewater Treatment and Disposal System
JR Cousin Consultants Ltd
Shoal Lake #40 (SL40) is proceeding with construction of a wastewater treatment system. Shoal Lake 40 First Nation is located approximately 160 km east of the City of Winnipeg, near the Manitoba-Ontario border. The community is accessible year-round via Freedom Road. The general scope of work consists of: Construction of a new wastewater treatment building (WWTB) with rock-socketed pipe pile foundation. The building will be a pre-engineered steel building with a building footprint of approximately 16 m x 24 m. Construction of two in situ clay lined submerged attached growth reactor (SAGR) cells south of the proposed WWTB, including supply and installation of pre-cast concrete inlet chamber, and two liquid level control chambers Supply and installation of mechanical and electrical systems inside the WWTB including: Mechanical systems include pumps, piping between treatment components, aeration piping, heating and ventilation systems, chemical feed systems, and bulk alum tank. Electrical systems include motor control centre (MCC) and associated wiring to equipment, exterior genset, and lighting. Process equipment including grinder, microscreens, lamella clarifiers, aeration blowers, and UV disinfection equipment. Construction of a gravel access road to site and within the site, including a 25 m x 30 m gravel truck turnaround, and upgrades to an existing gravel road. Site works including perimeter ditching, perimeter fence supply and installation, topsoil and seeding and signage. Supply and installation of a pre-cast concrete pumping chamber to pump SAGR effluent to the WWTB and pre-cast dumping station and equalization tank. Underground piping works including a watermain extension to the building and various piping throughout the site. Construction of an earthen outfall structure Interested General Contractors who have expertise in water or wastewater treatment plant construction are invited to submit Pre-Qualification Documents. Sealed submissions will be received un
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
C2526-002 Pines Wastewater Treatment Plant- New Inlet Works
Selwyn Water Limited
Construction of 350 (Three Hundred Fifty) nos Twin Pit Latrine for Extreme Poor at Different Location of Taltali Upazilla in Barguna District under Rural Sanitation Project (RSP) of Department of public Health Engineering.
Office of the Executive Engineer DPHE, Barguna
Construction of 24 (Twenty Four) nos Community toilet at Different Location of 06 (Six) Upazila in Barguna District under Rural Sanitation Project (RSP) of Department of public Health Engineering . Package No WDCT-38 ) FY-2025-2026
Office of the Executive Engineer DPHE, Barguna
ROI - CT8490 - North Harbour 2 – Greenhithe Bridge Main Works , Stage 2
WaterCare Services Ltd
Supply of Precast Concrete Shaft Segments
SEVERN TRENT WATER LIMITED
Free tender alerts
Get a weekly digest of Canada tenders
New Canada tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.