Skip to main content
All Canada tenders

NEWPCC Sequencing Batch Reactor (SBR) Blower and Exhaust Building Outdoor Stairs

The City of Winnipeg

See B3 for Site Investigation. D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of fabrication and installation of two exterior stair assemblies for the Blower and Exhaust Room Buildings of the Sequencing Batch Reactor (SBR) of the North End Wastewater Treatment Plant (NEWPCC) D2.2 The major components of the Work are as follows: (a) Prepare site including hoarding, temporary heating and other necessary temporary facilities as required. (b) Fabricate and assemble stair sections and components (c) Install stair assembly (d) Seal and waterproof all roof and building penetrations D2.3 The Contractor shall be responsible to obtain all necessary permits from the concerned offices/agencies regarding the installation of the two exterior stair assemblies. The Contractor will satisfy all permits and application requirements including any inspection or testing if required to obtain the permit at no extra cost.

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of Canada tenders

New Canada tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.