Bushe River Solid Waste Transfer Station
ISL Engineering and Land Services Ltd.
Work of this Contract comprises of the following: Conduct earthworks including topsoil stripping, site grading and compaction to establish finished grades for all functional areas as shown on the drawings. All earthworks shall be carried out in conformance with the geotechnical recommendations. The site has been cleared and grubbed under a previous contract. Clearing and grubbing does not form part of the Work of this Contract. Excavate, haul, place and compact clay fill from the on-site borrow area, and strip, haul and stockpile topsoil and unsuitable material at the locations shown on the drawings. Construct the elevated platform and ramp as shown on the drawings. The retaining structure is a mechanically stabilized earth (MSE) wall using precast concrete lock-block facing units with geogrid reinforcement, and includes: Uniaxial geogrid placed at each course interface, and reinforced granular fill placed and compacted in accordance with the drawings and Section 31 05 16 Aggregate Materials. A compacted clay ramp core beyond the reinforced zone, placed using material from the on-site borrow area. A clean drain-rock chimney drain and a perforated base drain discharging to a positive daylight outlet through the wall face. Galvanized steel fall-protection railing and precast concrete curb stops at the platform. Ramp geometry shall accommodate four 40-cubic-yard roll-off bins and a vehicle travel lane. Bin stop and clearance dimensions shall be verified against the Owner's existing roll-off truck dimensions prior to construction. Construct the concrete slabs-on-grade for the roll-off bins. Supply, deliver, place, and tie in the household hazardous waste (HHW) drop-off unit, in accordance with Section 00 74 00 Special Provisions. Design, purchase and delivery of the HHW drop-off unit are covered by a cash allowance under Section 01 21 00 Allowances. All other costs, including Contractor coordination, expediting, off-loading, placement, installation and tie-in, shall be
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
EOI# 26-29 Comingled Organics and Yard Waste Processing
Cowichan Valley Regional District
RFQ - Independent Environmental Monitor Services for Gitga'at Power Project
Gitga'at First Nation
Public Art Consulting Services - Collection Assessment
City of North Vancouver
IM27TCG038 - Tree Planting Implementation and Silviculture Surveys
BC Timber Sales
TA0910 - Blackwater
BC Timber Sales - Timber Auctions
Free tender alerts
Get a weekly digest of Canada tenders
New Canada tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.