Skip to main content
All United Kingdom tenders
United Kingdomworksselective

Electric Vehicle Charging Infrastructure

Lancashire County Council

This Tender is being published to support the Local Electric Vehicle Infrastructure (LEVI) fund, which is a major UK government initiative, administered by the Office for Zero Emission Vehicles (OZEV), designed to support local authorities in England to roll out electric vehicle public charging infrastructure. The scheme aims to assist residents without off-street parking in transitioning to electric vehicles (EVs). The Authority has been awarded £10,111,000 for the provision of public EV Chargepoints from the Local Electric Vehicle Infrastructure (LEVI) Capital fund, funded by the Office for Zero Emission Vehicles. Additionally, the Authority has secured £400,000 from the LEVI Pilot fund specifically for the delivery of lamppost-integrated Chargepoints. Delivery of the Pilot project has been included as a required element in this tender to ensure there is an integrated and consistent approach to EVI provision. The Authority's contribution towards the works required to deliver the Contract is £10,511,000 which is aggregate sum of the LEVI Capital fund the LEVI Pilot fund as set out above. This Procurement and subsequent Contract is offered and will be delivered as a single lot covering the whole county. The Authority's desire is that installations can be balanced across the more commercially viable and the less commercially viable areas across the county. An experienced CPO with the technical expertise to deliver at the required scale and at pace is vital for a contract of this size. Modelling conducted for the Local Electric Vehicle Infrastructure (LEVI) Strategy link: 'https://www.lancashire.gov.uk/media/945415/the-lancashire-and-blackburn-with-darwen-electric-vehicle-infrastructure-strategy.pdf' supported by forecasts from Cenex and Transport for the North, indicates that Lancashire will require a minimum of 6,200 charging Sockets by 2030. The number of individual units (Chargepoints) will depend on the use of technology, i.e. 7kW or 50kW+, and the number of Sock

Classification

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity