Rear car park refurbishment at Cricklade Leisure Centre
Cricklade Town Council
Groundworks to scrap and clear all current stone and make smooth for eco grid install. Any waste produced removed from site under license. Edging of carpark lawn migration scraped back to clear edge. * Supply and install type1 hardcore to level and lay grids on approx 950 m2. Grids to be supplied and laid. * Circa 18 car park spaces to be marked out with eco grid caps. - Design from contractor to maximise the available spaces 18 at minimum to be provided. * Allow for 20-40mm local Newbury flint for hardwearing nature to be used to infill the grid base • Square footage -approx c950m2 - allowing for wastage and 10% discrepancy. Contractor will be expected to visit site and provide accurate measurements and design space to accommodate at least 18 car park spaces. • Car parking spaces would be marked up using a spacing cap that sits into the hexagonal hole of the grid itself. • Expect excavation down 250mm with a min 200mm base on top of whatever form base is below already. The base is permeable with the land running slightly to the ditch. We wouldn't anticipate any drainage being required.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Rakehead Recreation Ground, Burnley - Playing Field Reinstatement
Burnley Borough Council
Germany – Landscaping work – Parkanlagen
Stadibau GmbH
Vegetation Management Framework 2026-2030
Natural Resources Wales
Grim ungdomsskole - oppgradering av deler av skolegården
KRISTIANSAND KOMMUNE
Green Campus Main Contractor
Thanet District Council