Manchester International Airport Phase 2 - Overbridge Civils
Kier Transportation - CP7 NWC
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including: • Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections. • Modification of existing bridge cill. • Supply and installation of bridge bearing plates, including associated screed works. • Cons
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
CA18585 - ITT Repair and replacement works to whole site drainage system
Diocese of Norwich Education and Academies Trust
Swanley Park Footpath Refurbishment
Swanley Town Council
BBV HS2 MWCC North - Pumped Drainage
Balfour Beatty VINCI JV HS2
DNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV
Altrad AtkinsRealis Joint Venture (A2R JV)
Ascent Homes - Coulson Park - Groundworks
Advance Northumberland Limited
Free tender alerts
Get a weekly digest of United Kingdom tenders
New United Kingdom tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.