SZC CWA - Pool Bunker Construction
Sizewell C Limited
The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review. The timescales are as follows: The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution. The current target is for the Pool Bunker to be completed and handed
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Poland – Construction work – Circulating Water System Intake Equipment Package
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Poland – Building construction work – CWS Circulating Water Pumps (Concrete Volute)
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Weatherproofing Units
COMMANDING OFFICER
Bulgaria – Harbour equipment – Доставка и монтаж на нова система от понтони в пристанище "Свети Никола" гр.Черноморец
ОБЩИНА СОЗОПОЛ
Ремонт на покрив и изграждане на навес в централен склад Изток
МРЕЖОВИ ЕКСПЛОАТАЦИОНЕН РАЙОН-ВАРНА
Free tender alerts
Get a weekly digest of United Kingdom tenders
New United Kingdom tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.