Design and Construct Brown Grey River Bridge and Blue Grey River Bridge
Buller District Council
Buller District Council are seeking proposals for the design and construction services for replacement bridges at Brown Grey River Bridge, Bridge 117 at Route Position 3.7km and the Blue Grey River Bridge, Bridge 120 at Route Position 7.7km. These bridges are located 4Km apart on Palmer Rd. Palmer Road is in the Inangahua Ward and begins at its junction with State Highway 7, approximately 13km west of Springs Junction. The replacement structures are expected to comprise piled abutments, intermediate supports in the river, and a composite concrete bridge deck supported on steel girders. The scope includes the design and construction of the new bridges, as well as removal of the existing bridges The Contract Works include design, supply and construction as well as removal of the old bridges in accordance with the Principals Requirements. Bridge 117 – Brown Grey River Bridge - The minimum requirement for replacement new bridge span arrangements is 2 spans of 15m subject to Contractors Design. Bridge 120 – Blue Grey River Bridge - The minimum requirement for replacement new bridge span arrangements is 3 spans of 16m subject to Contractors Design. For both sites, the Contractor’s Designer may consider a single span or multi-span bridge arrangement. Its noted that the resource consent application lodged includes general arrangement plans that show nominate spans and positions of intermediate supports. The Contractors Designer is to consider and confirm actual span arrangements proposed through the Preliminary Design Statement submitted within their response and later confirmed in their Final Design Statement.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
SH39 Mangati Stream Bridge Permanent Structure Replacement
New Zealand Transport Agency
Kershaw Road Bridge Superstructure Replacement
Whangarei District Council
Hatea Walkway Swing Bridge Renewal - Design and Construct
Whangarei District Council
Bridge Inspection Services
W071 ENDIST PORTLAND
Replace Flooring Bldg 102 & Bldg 110
W7MX USPFO ACTIVITY CAANG 144