TKKM Rāwhiti Roa – Site: Drainage Works – Main Construction Contractor
Board of Trustees - Approve by BoT - ie. School Principal
The outcome sought from this procurement is the securing of the services of a suitably qualified and experienced main contractor to undertake the proposed Site: drainage works. The Kura’s original 5YA project scope included a drainage works design project. The system has had urgent remediation works undertaken already and the design of the new drainage system is complete. Due to the location of the proposed works and potential for disruption of the Kura’s operations, the contract works must be delivered during school holidays. The proposed scope includes the replacement of existing concrete paving to direct surface water towards new overland flow paths between Blocks 2, 3 & 5. The existing covered way path currently acts like a dam preventing surface water to flow through the natural flow path, so grated channels are proposed to allow water to escape when the surface flow exceeds the capacity of the existing catchpit. Additional ground contouring is proposed to deflect surface water from the area and instead direct to an existing adjacent catchpit and drainage network. Additionally, there are several areas of replacement drainage works required following a recent CCTV of the existing drains at the Kura. There is also some remedial wastewater drainage required, including the installation of new access chambers to resolve a sharp bend in the existing WW drainage infrastructure that has a tendency to block regularly.
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Dargaville Primary School Site Wide 5YA Works
Board of Trustees - Approve by BoT - ie. School Principal
RFT for Main Contractor for Drainage Works at Parua Bay School
Board of Trustees - Approve by BoT - ie. School Principal
Dargaville Primary School Drainage Remedial Works
Board of Trustees - Approve by BoT - ie. School Principal
Te Maunga Closed Landfill - Immediate Physical Works
Tauranga City Council
Improvement of Road Including Construction of Drainage Line at Matikata Alhajj Anowar Hossain Ali Road Holding No-6/1 to Holding No-5/Ga Under Ward No-15.
Office of the Executive Engineer, Zone-02
Free tender alerts
Get a weekly digest of New Zealand tenders
New New Zealand tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.